Vandana Ispat Plans to set up An Integrated Steel Plant With CPP

253 views
Skip to first unread message

Industrial Directory Of India

unread,
Aug 16, 2012, 1:48:29 PM8/16/12
to industrialdir...@googlegroups.com

               “New Projects This Week" 

                   RELEASED : ISSUE AUGUST 12 /12 

              Comprising  of  Total  82 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

       Vandana Ispat  Plans to set up

An Integrated Steel Plant With CPP

                                       

Vandana Ispat Ltd.  plans set up a  Integrated Steel Plant having capacity of   8,30,000 TPA  along with  a  120 MW (80 MW AFBC +  40MW WHRB) Captive Power Plant  at Kopedih and Anjora Villages in Rajnandgao District, Chhatisgarh.

 

Capacity :

(The projet is coming up in Two Phases)  

1. Integrated Steel Plant : 8,30,000 TPA  

   (BF & DRI)

 

2.Captive Power Plant   : 120 MW

   (WHRB: 40MW  & AFBC : 80 MW )       

 

3. Steel Melting Shop

 (Ingot, Billets, Blooms & Slab):   

   Capacity : 7,50,000 TPA

 

4. Sinter Plant Plant :   

    Capacity : 6,27,000 TPA

5. Oxygen Plant  :   

    Capacity : 1,000 m3/hr

6. Coke Oven Battery Plant :   

    Capacity : 3,70,000 TPA

7. Rolled Products / Rolling Mill:   

    Capacity : 6,90,000 TPA

8. Ferro Alloys Plant  :   

    Capacity : 17,500 TPA 

9. Fly Ash Based Products :   

    Capacity : 3,61,000 TPA

10. Coal washery :   

    Capacity : 12,00,000 TPA 

 

 

Location :  

Kopedih and Anjora Villages

Rajnandgao District, Chhatisgarh.              

 

As 0n  August 17, 2012 : The Project is under planning stage.

 

The total project is coming up in an area of  494 Acres  and

165 Acres (33% of total area) of land area has been earmarked for development of Green Belt all around the project area.

 

IMPORTANT: As per the discussion we had last  on 21.07.2012  with  Vandana Ispat Ltd. the Project is under planning stage.

 

The company has obtained   Environmental Clerance. 

 

Civil work is expected to commence from August,2012.

 

The Project Schedule :

Complrtion Period  : 4 Years.

PHASE - I  :    By December,2013.

PHASE - II  :  By December,2016.

 

---------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

The Main Scope of Supply includes:

Captive Power Plant : 120 MW

Using 40 MW WHRB  & 80 MW AFBC.      

1.Waste Heat Recovery Boiler: 1 No.

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (AFBC) Boiler: 1 No

Fuel : Coal and  Char 

.

Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers:

 

3. AC Generator             : 1 No.

415V, 50HZ. 0.8 Power Factor, Salient Pole, Revolving \Field, Horizontal type Alternator,

.

***************************************** 

 

Air Pollution Control Equipment :

 

Emissions will be generated from BF, Coke oven, Ferro Alloy, Pelletization Plant, Sinter Plant.

 

Dust extraction with bag filters will be provided to control fugitive emissions from loading / unloading and handling of coal and ash.

Raw Materials

Iron ore (16,00,000 TPA), Mn Ore (10,00,000 TPA), Coke

(8,00,000 TPA), Coal (12,00,000 TPA), Dolomite (3,00,000 TPA) and Paste (1,00,000 TPA) will be used as raw material.

 

1. DRI with auxilliary   

2. SMS with auxiliary   

1. Rolling Mill with auxilliary   

2. Steam Turbine   

3. Iron Ore Crusher  

4. Coal crusher 

5. Coal/Char Preparing & Handling Plant    

 

 

Cooling Tower

DG Sets (as stand by during Power Failure)

Air Conditioning Plant

 

Material Handling Equipment

Conveyor

Crusher – Jaw Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust 

    storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant :

Oxdisation Chamber, Filter, D.M. Plant

Pumps Valves, Custom Pipeline Work

 

The proposed project requires about 2949.99 Million Litres/day

of water.

 

This includes Make-up water for DRI, Power plant and Domestic water.

 

Source Of Water :

Water requirement will be met  from Shivnath River.

Surface water quality of Shivnath River (60 m upstream and downstream)


DM water will be used for slag quenching, spray and coal cooling. Zero discharge will be adopted

 

Effluent  Treatment Plant:

 

Sewage effluent will be treated and used for green belt development.

 

Mill scales will be sold to Ferro Alloy Plants.  Fly ash brick plant will be installed to make use of ash and slag.  Fly ash will also be provided to cement plant and PPC cement manufacturers. Granulated slag from Blast furnace will be used for cement making. 

 

 Washery rejects from coal washery plant, coal middlings and char will be used in AFBC power plant.

.

Other Equipments :

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.                     

 

165 Acres of Greenbelt will be Developed (inclusive of existing) as per CPCB guidelines. 15 m  wide greenbelt will be developed along the periphery of the plant.  and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at : 

Vandana Ispat Ltd.

M G Road, Raipur - 492001

Chhattisgarh, India

------------------------------------------

Tel  : + 91-771- 4006000

Fax : + 91-771- 4006001

----------------------------------------

Email       :  v...@vandanavidhyut.com

Website   :  www.vandanavidhyut.com


*****************************               

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

               Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  http://www.industrialdirectoryofindia.com/download


We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                    Company's Name

                    Address/ Phone/ Fax

                    Contact person's Name

                    E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

 

 

Aug1212.jpg
Reply all
Reply to author
Forward
0 new messages