| Released |
RELEASED : ISSUE May 15 /16
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
*******************************************
(Projects under Planning Stage)
Visit : http://www.industrialdirectoryofindia.com/download
(Helpline : +91-900 7158 600/ 900 7742 600)
|
Project Update 17th May, 2016 |
|
Pharmaceutical : Rs.320 Crore |
|
First Info : May 2016 The company plans to set up a New Pharmaceutical Production facility . The project is in planning stage. As of 17th May, 2016, the company is waiting for environmental clearance. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 5 TPH : 2 Nos. (1 Working + 1 Stand by) Fuel : Natural Gas / Furnace Oil Air Pollution Control : Bag filter will be provided to stack attached to Boilers and scrubbers will be provided to stack attached to process reactors. DG Set : 2000 KVA : 2 Nos. ( Fuel : HSD) 500 KVA : 2 Nos. ( Fuel : HSD) Other Equipments Cooling tower with pumps, Chilled Water Plant with pumps, Fire Hydrant System, Valves, Pumps & Other Process Equipment for phrama unit. Water Treatment Plant: Water Treatment Plant will be implemented for domestic and industrial activity during operation . Effluent Treatment Plant: Industrial waste water generated due to various activities will be treated in Effluent Treatment Plant having primary, secondary and tertiary treatment facilities as well as in Multiple Effect Evaporator. The treated water from the ETP will be used in toilet flushing and for gardening purpose.
Visit : http://www.industrialdirectoryofindia.com/download |
|
Distillery : |
|
First Info : May 2016 The company plans to set up a New Distillery in Rajasthan. The project is in planning stage. As of 17th May, 2016, Pre-Project Activities are on. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 3 TPH : 1 No. ( Fuel : Rice Husk/ HSD) ESP will be installed with the proposed boiler. DG Set : 75 KVA (1 x 25 KVA + 1 x 50 KVA). ( Fuel : HSD) Other Equipments Liquefaction Tank with agitator and motor, Pump for final Liquefaction Tank with motor, Fermented wash Re circulation Pump with Motor,Condensate Tank, Cooling Tower. Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be 46 m3/Day. Effluent Treatment Plant: The Process condensate will be cooled and collected into a neutralization tank with sufficient residence time. After Neutralization and filtration (UF+RO) this process condensate will be recycled into process use. Visit : http://www.industrialdirectoryofindia.com/download |
|
Pharmaceuticals : |
|
First Info : May 2016 The company plans to expand the production capacity of its Pharmaceuticals Unit. The project is in planning stage. As of 17th May, 2016, the company is waiting for necessary clearance. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 1120 Kgs (IBR) : 1 No. ( Fuel : Natural Gas) Heat Exchangers, Air Pre-heater Air Pollution Control : Adequate stack height and common stack monitoring facility will be provided as air pollution control system to control particulate matter.. Thermic Fluid Heater : 4 Lac/KCal : 1 Nos. ( LDO) DG Set : 250 KVA : 1 No. ( Fuel : HSD) =============================================== Existing : Boiler : 1120 Kgs ( 1 No) & 800 Kgs (Non IBR)- 1 No ( wood/ Agro Waste) - DG set : 250 KVA- 1 No. + 25 KVA ( 1 No) Other Equipments Process Reactor, Pulverizer, Distillation Column, MS Storage tank, Cooling tower with pumps, Chilled Water Plant etc. etc Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be 89 m3/Day. Effluent Treatment Plant: Capacity : 30 KLD Industrial waste water 22.45 KL/daygenerated mainly from the washing, process, Boiler & Cooling.Generated waste water will be treated by adequate effluent treatment plant and treated water will be send to CETP .. Visit : http://www.industrialdirectoryofindia.com/download |
|
Sugar. Power & Distillery |
|
First Info : April 2016 The company plans to expand its Sugar Plant, Co-Generation Power Plant and to set up a New Distillery. The project is in planning stage. As of 17th May, 2016, Project Work is yet to start. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 150 TPH : 1 No ( Fuel : Bagasse/ Coal) Heat Exchangers, Air Pre-heater/Economiser). TG Set : 36 MW Incineration Boiler: 32 TPH (70 % concentrated Spent wash and 30 % Coal fired CFBC boiler) DG Set =============================================== Existing : Boiler : 120 TPH - 1 No. ( 1 No) ( Bagasse/ Coal) -
Other Equipments Cooling tower with pumps, Chilled Water Plant with pumps, Fire Hydrant System, Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be - During season: 6715 KLD & During off‐season: 3115 KLD. Effluent Treatment Plant: Capacity : 1000 KLD 894 KLD Effluent generated will be treated in the ETP of capacity 1000 KLD and the domestic sewage is disposed to septic tank and soak pit. About 960 KLD of spentwash and 120 KLD of spentlees will be generated. Spent wash will be stored in the impervious storage tank and will be concentrated and used as fuel in the slop fired boiler. Spentlees will be neutalised and recycled back in the process. For Distillery : Visit : http://www.industrialdirectoryofindia.com/download |
|
Chemical |
|
First Info : May 2016 The company plans to increase the production capacity its Chemical Unit The project is in planning stage. As of 17th May, 2016, the company is for necessary clearance. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 2.8 TPH ( Fuel : Natural Gas) : 1 No Heat Exchangers, Air Pre-heater/Economiser) Wet Scrubber for arresting fly ash Air Pollution Control : Adequate stack height and common stack monitoring facility will be provided as air pollution control system to control particulate matter.. Thermic Fluid Heater : 2 Lac/KCal : 1 No. ============================================== Existing : Thermic Fluid Heater : 10 Lac/KCal) -1 No DG set : 1063 KVA- 2 Nos. ( 1w +1 S) Other Equipments Reaction Vessel Dryer, Chilling Water plant, Scrubbers(single stage, Cooling Tower, Air Compressor, Solvents Pumps (SS/PP) ,HDPE Storage Tanks, Weighing Balance, Complete Laboratory Equipments, Fire fighting System as per TAC norms. Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be 252 m3/Day. Effluent Treatment Plant: Total Effluent Generation from the unit during operation phase will be 52 m3/Day. Another 40 m3/ Day from Domestic Source. 1. Domestic wastewater (sewage) will be disposed into Septic Tank/Sock Pit system. 2. The industrial effluent will be sent to ETP & treated effluent is discharged on land for irrigation/plantation/gardening within premises. Visit : http://www.industrialdirectoryofindia.com/download |
|
Chemical : |
|
First Info : May 2016 The company plans to set up a New Chemicals manufacturing unit . The project is in planning stage. As of 17th May, 2016, Pre-Project Activities are on. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 2 TPH : 1 No. ( Fuel : Agro Waste/ Bio Coal) Heat Exchangers, Air Pre-heater Air Pollution Control : Adequate stack height and common stack monitoring facility will be provided as air pollution control system to control particulate matter.. Thermic Fluid Heater : 4 Lac/KCal : 1 Nos. ( Fuel : Agro Waste/ Bio Coal) DG Set : 500 KVA : 1 No. ( Fuel : HSD) Other Equipments Reaction Vessel, storage tank, Cooling tower with pumps, Scrubbers(single stage, Air Compressor, Solvents Pumps (SS/PP) ,HDPE Storage Tanks, Weighing Balance (Including inInter Connecting Pipe Works, Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be 81.50 m3/day. Effluent Treatment Plant: The total industrial wastewater generations will be 39 m3/Day. The water drained from the water treatment plant will be pumped to a neutralization pit. The neutralization pit will have acid resistant brick lining. Depending on the quality of water, either an alkaline medium or acidic medium will be pumped to the pit to neutralize the water. Sewerage System : Sewage pipes would be laid in entire company for the removal and disposal of mainly non-harmful liquid wastes from the offices, canteen and domestic waste coming from different sections. These liquid wastes would be treated (If required) and disposed by septic tank and soak pit. Visit : http://www.industrialdirectoryofindia.com/download |
|
Chemical |
|
First Info : April 2016 The company plans to expand the production capacity of its Organic Chemical Unit. The project is in planning stage. As of 17th May, 2016, Pre-Project Activities are on. ********************************************************************** The Main Scope of Supply includes: ********************************************************************** Boiler : 2 TPH - 1 No ( Fuel : Imported Coal) Heat Exchangers, Air Pre-heater/Economiser) Wet Scrubber for arresting fly ash & for process Sections : Bag Filter,Alkali Scrubber etc. Air Pollution Control : for Boiler : Cyclone separator + Water Scrubber Followed by adequate stack height DG Set : 250 KVA : 2 Nos. ( Fuel : HSD) =============================================== Existing : Boiler : 2 TPH ( Coal/ Husk) - 1 No, Thermic Fluid Heater : 20 Lac/Kcal -1 No
Other Equipments Reactor Vessel, Cupric and Chloride reaction vessel, Spin Flash Dryer, Cooling tower with pumps, Chilled Water Plant with pumps, Fire Hydrant System, Water Treatment Plant: Water requirement of the project for domestic and industrial activity during operation phase will be 200 m3/Day. [102.6 m3/Day Recycle Water + 97.4 m3/Day Fresh Water] Effluent Treatment Plant: After expansion total industrial effluent generation will be : 147.5 m3/Day. (Presently : 23 m3/Day] Now, Total effluent coming from all steams will merge and treated in New Effluent Treatment Plant. About 90 KLD will be evaporated in MEE from which 81 KLD (90 to 92% recovery) will be recovered and remaining residue will be sent to TSDF site. Visit : http://www.industrialdirectoryofindia.com/download |
|
|
For More Projects Enquiries (Over 400 New Project Enquiries + Over 150 Projects Update Every Month) in All Sectors |
| New Projects |
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit :http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”