Sri Luxmi Tulasi Agro Paper Setting Up 85 TPD Plant with 18 MW Captive Power Plant

1,170 views
Skip to first unread message

Industrial Directory Of India

unread,
May 25, 2011, 9:41:33 PM5/25/11
to industrialdir...@googlegroups.com
                     “New Projects This Week" 

                   RELEASED : ISSUE MAY 22 /11 

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

Sri Luxmi Tulasi Agro Paper Setting Up

 85 TPD Plant  with 18 MW Captive Power 

   (Updation : Refer our Earlier Report Dtd. 24.11.2010)

 

Sri Luxmi Tulasi Agro Paper Private  Limited is setting up
85 TPD Duplex Boards  Unit and Bio - Mass Based 18 MW  Captive power plant at Aswaraopeta, Khammam District, Anfhra Pradesh.    

 

Capacity : 

Duplex Boards Unit   : 85 TPD

Captive Power Plant : 4 MW to 18 MW

   (Expansion)

                 

Location : Aswaraopeta, Khammam District, Anfhra Pradesh.,

        

*****************************

    OUR EARLIER REPORTS (Project History)

 

  Report I :

 Please refer our report  on  21.05.2010, Where we had given you the the following report:

The project is in planning stage, The company will go for the Captive Power Plant Expansion  Project at first and then  for the Duplex Board Project.

 

As per our discussion  with Mr. Krishna Reddy, Director of Sri Luxmi Tulasi Agro Paper Private  Limited  on 17. 05.2010,   The Civil Work  for  Captive Power Plant Project is going to stat from June, 2010.

--------------------------------------------------------------------

 
Report II : 

Please refer our report  on  24.11.2010, Where we had given you the the following report:

 As per the discussion we had last with Mr. Krishna Reddy, Director of Sri Luxmi Tulasi Agro Paper Private  Limited  on 10. 11.2010,  the Project work  for  Captive Power Plant is  underway.

 

As per Mr.Reddy, Captive Power Plant is targeted to Complete by April,2011.

 

The Project Work for Duplex Board Unit will likely to be commenced from April/ May,2011  and will take approximately  9 Months to complete from the date of Comeencement of Project Work,ie, by  February 2012.”

 

*****************************

                 LATEST UPDATION

*****************************

                 

As 0n  May 26, 2011 Captive Power Plant is  almost on the the brim of Completion.

 

IMPORTANT:  As per the discussion we had last with

Mr. Krishna Reddy, Director of Sri Luxmi Tulasi Agro Paper Private  Limited  on 24. 05.2011, the Project work  for  Captive Power Plant is   going to be Completed by the end of this month or the middle of the next.

 

As per Mr.Reddy, The Project Work for Duplex Board Unit will likely to be commenced from  July,2011  and will take approximately  1 Year  to complete from the date of Comeencement of the Project Work,ie, by 

June 2012.

 

 *****************************

The Main Scope of Supply includes:

  (Including Captive Power Plant)

 

Power Boiler  :  60 TPH ( Multi Fuel Fired)

Heat Exchanger, Air Preheater

Pullution Control Equipment:

Electrostatic precipitators

The emissions from boiler of capacity 60 TPH are routed through an ESP to control the Particulate matter to 100 mg/Nm3 and clean emissions are let out into the atmosphere through stack height 45m.

 

Acoustic enclosures to be provided around Generator/Turbine to control noise levels.  

Adequate Dust Collection and Extraction System to be provided  to control fugitive dust emissions at various transfer points.

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser
Power plant stack

Fuel system

DG

Cooling Tower

 

Pulp Machine  :  650 TPH

Lime Klin   : 450 TPD

Deinking line 

A Multi-Llayer Coated Folding Box Board Manufacturing Machine

 

Water Treatment Plant :

The source of water is Ground water.

The total water requirement shall not exceed 2278 KLD.

 

Out of this:

Domestic water requirement                    38 KLD

Boiler feed and Cooling tower Make-up   :428 KLD

Process requirement                             :1812 KLD.

---------------------------------------------------------------

                                                     Total: 2278 KLD     

 

Effluent  Treatment Plant:    

 

The total waste water generated is 1159 KLD.

 

 Out of this:

 Waste water generated from domestic section : 31 KLD

 Boiler blow down and cooling tower bleed       : 56 KLD

 Process and washings                                   :1072 KLD

-------------------------------------------------------------------

                                                          Total: 1159 KLD  

 

The waste water generated from the domestic section is disposed into a septic tank followed by subsurface dispersion trenches.

 

The waste water generated from the process & washings, Boiler blow down and cooling tower bleed of shall be treated in an ETP. 

 

Conveyors: All the conveyor belts shall be covered with G.I. Sheets.

Water spray system shall be provided all around the stockpiles and dust suppression system around the conveyor system. 

  

Supply Of Other Equipments:

Material Handling Equipment : Conveying Systems, Hydraulic Equipments, Screen

 Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank . Fire Fighting Equipment etc.

Complete Laboratory Equipments

Fire fighting System as per TAC norms. 

Green Belt Development Plan and a scheme for Rainwater Harvesting have to be put in place.

Green belt will be developed in 45.68 Acres of total plant area of 114.85 Acres.

 

The company must harvest the rainwater from the rooftops and storm water drains to recharge the ground water.

 
Scope Of Entire Civil & Construction Work:

Construction of Office Building, factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

                                         

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Boiler, Air Pollution Control Equipments: Water &  Effluent  Treatment Plant , Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes. Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Fire Fighting Equipment, Air Conditioning, Cables, Automatic Weighing Machines for Bulk & Liquid Materials,  Complete Laboratory Equipments , etc.  for the above project  may  Contact for Specified Enquiry at   :

 

Sri Luxmi Tulasi Agro Paper Private  Limited

25-2-20, Jayakrishnapuram

Rajahmundry, East Godavari Dist.

Andhra Pradesh  -533 105

-----------------------------------------------

Tel  : 0883 -2476877

Fax : 0883 -2441577

-----------------------------------------------

  Contact Person : MR. Krishna Reddy, Director

                             (Cell : 09393233477 )

-----------------------------------------------------------------------------

               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   

                  http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                      Contact person's Name 

                      E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 

 

 

 



May2211.jpg
Reply all
Reply to author
Forward
0 new messages