Update : RSB Metaltech Plans To Set Up 0.7 MTPA Refinery with 30 MW CPP,.,...,.....

83 views
Skip to first unread message

Industrial Directory Of India

unread,
May 22, 2015, 2:30:47 AM5/22/15
to industrialdir...@googlegroups.com
     Industrial Directory of India.Com 

       Released
               "New Projects This Week" 

                   RELEASED : ISSUE MAY 17/15

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     Project Update

                                                    

  RSB Metaltech Plans To Set Up

0.7 MTPA Refinery with 30 MW CPP

==================================== 
                     (Update :   Refer our Earlier Report on
          23.11.2011, 15.05.2012, 28.12.2012,  18.07.2013 & 12.09.2014 )   
        ==================================== 

                                      

RSB Metaltech Private Limited  plans to set up  an Alumina Refinery 

having Capacity of  7,00,000 TPA along with along with a 30 MW

Cpative Power Plant at  Rayagada & Kalyansinghpur  Tehsil  in Rayagada District, Orissa.

Capacity : 

Phase-I

1. Alumina Refinery       : 7,00,000 TPA

2.Captive Power Plant   : 30 MW

 

Phase-II

Later, the refinery will be expanded to 14,00,000 TPA (1.4 MTPA)

to produce Aluminium of 3,50,000 TPA..

     

Location :  

Rayagada & Kalyansinghpur Tehsil

Rayagada District, Orissa.

 

****************************

As on  MAY 21, 2015 : The Project is in planning stage.

 

The  project will come up on - 613.28 Hectares of Land.

Out of  this 151.94 Hectares of Land will be developed as Green Belt.

 

IMPORTANT: As per the discussion we had last  on 15.05.2015

 with  of RSB Metaltech Private Limited the Project is under planning stage.

 

Project History :

 

The 35th Expert Appraisal Committee (EAC), MoEF held during 26th &

27th April, 2012.

 

2nd reconstituted EAC (Industry) held during 29th-31st October’2012,

has recommended for Environmental Clearance of Smelter & Captive Power

Plant Complex.

 

The Project is delayed due to  delay in Final  Environmental Clearance.


The project work will start  on receipt of Final  Environmental Clearance.

 The Project  is Scheduled to be  Completed in 42- 48 Months

from the date of commencement of the project work. 

 

*****************************

So, this is the RIGHT TIME to contact  and Follow Up

at following address  to obtain the detailed Enquiry 

of each product  in time and to submit your quotation subsequently.


*****************************

The Main Scope of Supply includes: 

Boiler           : Capacity & Other details are yet to be finalised

                 Fuel           :  Coal (Consumption: 385000 TPA)

                 Stack         :  150 Meter   

 

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Polution Control:

Electrostatic Precipitators/ Bag Filters

The plant shall be provided with Electrostatic Precipitators.

Particulate matter, SO2, NOX and CO are the major emission will be 

 from Power plant and Calciner operations.

 

The Boiler and Calciner will be attached with

Electrostatic Precipitator of >99.9% efficiency with 

150 m and 125 m height stacks respectively to restrict emissions well within stipulated norms.

Because of the proposed project, there will be marginal increase

 in emissions and will be adequately covered in impact assessment in EIA/EMP..

 

The construction works includes:

 Installation of Alumina plant and its ancillary facilities

 to produce 0.7 Million TPY of  alumina.

 

 Installation of 30 MW Steam cum Power Plant

 Laying of pipeline for water transportation

 Laying of conveyor for raw material  transportation

 Laying of rail line from the nearby railway station i.e. Bhalumaska at a distance of approx. 5.0 km from the project area.

 Construction of self sufficient township to accommodate the workers/officers of

     Alumina Refinery Complex as well as mine.

 Construction of all other miscellaneous  facilities like solid waste disposal area, service building, raw water reservoir etc.

 Construction of Red Mud and Ash disposal  Area.

 

Other Scope:

1. Primary Crusher (Bauxite)

2. Secondary Crusher 

3. Ball Mill

4. Screen

5. Conveyor  

    A  22 km Long Conveyor shall be laid for transportation

         of raw material from mine to the project

 

6. Pipeline  

     An  18 km Long Pipeline shall be laid from the water intake point

        on Sirikona River a tributary of Nagavali River to the project site.

 

*****************************

MANUFACTURING PROCESS:

BRIEF PROCESS DESCRIPTION

Bayer’s process with medium pressure digestion technology suitable for gibbisitic bauxire, high productivity precipitation and thickened slurry disposal of red mud has been considered for alumina production.

 

RSB intends to utilize commercially available process technology from the internationally reputed technology suppliers, RSB proposes to adopt modern technology with medium pressure digestion suitable for gibbsitic bauxite.

 

The alumina refinery includes a co-generation plant as integral part to produce steam and to co-generate power for internal use in the refinery.

 

The co-generation plant will be based on coal available from the coal deposits of Ib Valley/Talcher coalfields in Orissa.

 

The Bayer Process - an economical method of producing Aluminium Oxide - was discovered by an Austrian chemist Karl Bayer and patented in 1887.

 

The process has facilities for dissolution of aluminium component of bauxite ore in caustic soda solution remove as of impurities from the solution; and precipitation alumina tri hydrate which is then calcined to aluminium oxide.

 

A Bayer Process plant is principally a device for heating and cooling a large

recirculating stream of caustic soda solution. Bauxite is added at the high temperature point, red mud is separated at an intermediate temperature, and alumina is precipitated at the low temperature point in the cycle.

 

Bauxite usually has three forms of alumina – Gibbsite (Al2O3.3H2O), Boehmite (Al2O3. H2O) and diaspore Al2O3. H2O).

The choice of technology mainly depends on the type and composition of bauxite. Bauxite deposit being predominantly gibbsitic, medium pressure digestion is more suitable.

 

(Bauxite  requirement : 2.1 Million TPA)

 

The Alumina Refinery Process consists of the following:

Bauxite receipt, storage, reclamation & secondary crushing

Grinding

    Slurry heating and pre-desilication

 Digestion

 Heat Recovery

 Mud Separation

 Calcination

 Power and Steam Generation

 

*****************************

Cooling Tower  : 1 No.

Closed cycle Cooling Tower.

DG Set : 

will be installed for stand by arrangement..

 

Air Conditioning Plant

 

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

-----------------------------------------------------------------------------

Centralized Control System

One centralized Control System will be installed  for the operation of major equipment (Boiler, STG, CW System) in the plant and other auxiliary systems (Compressors and DM plant) shall be operated from their relay based local control panels/stations.

------------------------------------------------------------------

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust 

    storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant :

Oxdisation Chamber, Filter, D.M. Plant, Tube Settler   

Pumps Valves, Custom Pipeline Work

 

Water requirement is estimated : 12252 m3/Day.

 

Water demand shall be met from surface water i.e.

from Sirikona river a tributary of Nagavali River.

 

(Water requirement is estimated to be at 350 m3/day during Construction Phase and  this demand shall be met from ground water source from the nearby areas.)

 

Effluent  Treatment Plant:

Construction Phase:

 

Liquid effluent generated from the construction activity of different units shall be stored in a guard pond and shall be used for dust suppression in the working are, cleaning purpose etc. The entire quantity of waste water generated during construction phase shall be recycled back for different uses.

 

  The domestic sewage water due to the working of personnel as well as temporary shed for outside workers shall be routed through septic tank to soak pit.

 

Operation Phase:

 

Liquid effluents shall be treated and reused.

 

RSBM proposes for total recovery & reuse of process condensate. RSBM shall also target for maximum recovery & use of live steam condensate.

 

Similarly STP overflow water shall be treated & 100% reused.

.

Other Equipments :

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.                    

 

151.94 Hectares of Greenbelt will be Developed  and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :

 

RSB Metaltech Private Limited 

N2/40, Nayapalli

Bhubaneswar - 751 015, Orissa, India

--------------------------------------------

Tel : + 91- 674 2553331/2550590/2117050

Fax :+ 91- 674 2551668

------------------------------------------------

Email     : in...@rsbglobal.com

Website : www.rsbglobal.com


            New Projects

 

*****************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

            RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”