Update : Lorvin Industries Plans To Set Up 70 KLPD Distillery With Captive Power Plant

417 views
Skip to first unread message

Industrial Directory Of India

unread,
Apr 30, 2012, 8:25:24 PM4/30/12
to industrialdir...@googlegroups.com
                  New Projects This Week" 

                   RELEASED : ISSUE APRIL 29 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

 Lorvin Industries Plans To Set Up

 70 KLPD Distillery With Captive Power

(Update : Ref  Our Earlier Report of 06.04.2011 & 31.08.2011) 

                 

Lorvin Industries Limited  plans to set up  a  70 KLPD Molasses based Distillery along with a  2 MW Cogeneration Power Plant at Kenganoor, Belgaum  District, Karnataka. 

 

 The Unit will manufacture Ethanol, ENA (Extra Neutral Alcohol) & RS (Rectified Spirit). 

 

Capacity :

Distillery                   : 70 KLPD

Captive Power Plant : 2 MW

 

Carbon dioxide (30TPD) will be

produced as by-product

 

Distillery will be operated for 330 days. 

 

Location :  Kenganoor, Taluk Bailhongal

                  District Bengaum, Karnataka.

                    

As 0n  April 30, 2012 : The Project is  under Planning Stage.

 

The unit would come up on about 17.564 ha  Area of Land .

 

Out of 17.564 ha , 6.00 ha will be developed as Green Belt.

 

IMPORTANT:  Please refer our earlier Report of 

6.04.2011 & 31.08.2011. 

As per the discussion we had last on 24.04.2012 with Lorvin Industries Limited  the Project is under Panning Stage now.

The Land has been acquired.

The company has now obtained the MoEF Clerance.

 

The Civil work is positively to start from 

May/ June,2012.

 

The Project   is Scheduled to be  Completed 

by March, 2013 .

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

 

*****************************

The Main Scope of Supply includes:

Boiler  : 24 TPH

Fuel       : Biomass/Coal

 

Boiler will be fixed with Coal (4 TPH) and

concentrated spent wash (4.9 TPH)

 

Biomass  (110.4 tPF) such as rice husk, maize stack

and sugar cane thrash will be used as fuel.

 

Heat Exchanger, Air Pre- Heater/ Economiser

 

Biomass/Coal will be used as raw material for Steam generation and Power requirement for ethanol plant.

 

Fermentation plant

Distillation plant

Evaporation plant

Molasses storage tanks

Alcohol storage tanks

Spent wash storage tanks 

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Fuel system

Cooling Tower

Bottling Plant

Dryer

Multiple Effect Evaporators

Conveyors

 

------------------------------------------------------------------------------------------------------------

Process :

Molasses (280 TPD) sourced from other Sugar Industries will be used as raw materials.

Continuous fermentation with Multi-Pressure Vacuum distillation technology followed by bio-composting will be used.

Molasses (280 TPD) will be diluted with water and mixed with small quantities of specified cultures and nutrients (phosphate, urea and sulphuric acid) and then subjected continuous fermentation in large fermentation tanks.  The produce mixture (referred as fermented wash) containing about 9-10% alcohol will be clarified.  The clear wash will then purified in multistage vacuum distillation system to recover different grades of ethanol. Ethanol will be stored in MS storage tanks.  The aqueous solution obtained after separation of alcohol from wash will be the spent wash.  It will contain organic and inorganic matter as impurities and therefore suitably treated before disposal.

 

The spent wash 630 KL/d (649 TPD) will be concentrated from 12 to 60% in evaporators and then burnt along with bio mass as fuel in 

24 TPH boiler.  High pressure steam from boiler will be passed through turbine to generate 2.0 MW power.

----------------------------------------------------------------------------------------------------------------------

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

 

Flue gas will be controlled by electrostatic precipitator (ESP) and then vented through a stock (50 m).CO2 produced from fermenters will be scrubbed with water and recycled to fermenter.  Alcohol free CO2 gas will be sent to CO2 plant to produce liquid CO2 which will be compressed, cooled, liquefied and transported to consumers.

 

CO2 will be recovered and given to Bottling unit. 

Back pressure steam at 4.0 kg/cm2 will be used in the distillation and evaporation.  Co-gen power will be used in the plant to meet captive needs and excess power of about 0.8 MW will be exported to public grid. Carbon dioxide (30TPD) will be produced as by-product in fermenters.  Carbon dioxide will be recovered from fermenters, purified and liquefied in carbon dioxide plant.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

After Air Pre Heaters flue gases will pass through an Electro Static Precipitator where the Dust Particles will be  collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 100 mg/Nm3 through a Chimney of prescribed height.

The dust will be  collected from the bottom of the ESP.

 

High pressure superheated steam from boiler will pass through a Steam Turbine and at the lower pressure will go to the condenser.

The part of the steam will be extracted from the extraction points provided on the turbine, which will be used for distillery.

 

The condensed steam will return to the steam boiler as condensate and will again be boiled as steam.

 

While passing through the turbine, the high pressure and temperature steam will rotate the turbine rotor and an Electric Alternator mounted on the same shaft.

 

Electric power will be generated by the alternator. This electric power generated will be consumed in house i.e. for running the distillery and utilities like boilers auxiliaries etc.

*****************************

DG Set : . 1 No.

D.G. set : 1x250 KVA  will be installed for stand by arrangement..

Fuel : Diesel (125 LPD) will be used as fuel in D.G. Sets.

Emissions from D.G. sets will be vented through a stock (8 m).

Silencer (Acoustic enclosures) to be provided to D.G.

 

Cooling Tower

 ----------------------------------------------------------------

Water Treatment Plant:

Sand Filter, Iron Filter, ACF, DM Plant

Tube Settlers etc.

 Pumps Valves, Custom Pipeline Work

 

Water requirement  will be 900 m3/day.

It will be sourced  from River Malaprabha

 (3 km from the site).

 

A  Dedicated Pipeline will be laid from River Bed to the plant for conveyance of water.

 

Effluent Treatment Plant

 

Spent wash (630 m3/day) will be concentrated from 12% to 60% as solids in evaporator.  The water evaporator from evaporator will be condensed.  The condensate water will be treated and reused as cooling water make up in the plant.

The concentrate (130 TPD) from the evaporator having heat value 1600 kcal/kg will be burnt as liquid fuel in the boiler alongwith coal. 

 

The effluent (260 m3/day, spent lees, Cooling Tower Blow Down, plant washing etc. will be treated by neutralization, activated sludge process and clarification.  Treated effluent will be sent to agricultural lands for irrigation.

 

The effluent (663 m3/day) vapor condensate & vacuum pumps will be neutralized filtered through membrane/sand filter will be recycled (6 m3/day) as cooling tower make up and/or used in the process for dilution of molasses. Domestic effluent (6 m3/day) will be treated in septic tank followed by soak pit.  No effluent will be discharged outside the premises and Zero discharge will be adopted.

 

Fermented sludge (2 TPD) will be thickened in clarifier and decanter centrifuge and dried in open yard.  Dried sludge will be sold as cattle feed or composted with bio-mass.  Boiler ash (18 TPD) will be given to farmers as soil nutrient and soil conditioner. Spent oil (250 l/yr) and used batteries will be sold to authorized recyclers / re-processors. 

 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area 

(Approx. 6 ha) and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

Lorvin Industries Limited  

5th Floor, Lakshmi Complex, APMC Road,

Sadashiv Nagar,Belgaum-590001, India

--------------------------------------

 Tel:  +91- 831-2471487

--------------------------------------------

 E-mail :   lorvinin...@gmail.com

 Website: www.lorvinindustries.com

-----------------------------------------------------------   

Regd. Office:

Lorvin Industries Limited  

174/1, 1st Main Road

Sheshadripuram

Bangalore-560020, Karnataka, India

----------------------------

Phone   : +91-80-23366961/62/63

Telefax :  +91-80-23366961/62/63

-------------------------------------

 E-mail :  lorvinin...@gmail.com

Website: www.lorvinindustries.com

                             

 *****************************            

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUIERIES

             Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  

http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual




Apr2912.jpg
Reply all
Reply to author
Forward
0 new messages