Update : Punjab Acids-Chem Plans Expansion of its Chemical Unit.......

124 views
Skip to first unread message

Industrial Directory Of India

unread,
Jan 9, 2015, 12:35:20 AM1/9/15
to industrialdir...@googlegroups.com
        Industrial Directory of India.Com 

       Released
                   "New Projects This Week" 

                   RELEASED : ISSUE JANUARY 04 /15 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600)

                          

    Punjab Acids-Chem Plans

Expansion of its Chemical Unit

=================================

  (Update : Ref  Our Earlier Report of 

                18.06.2012  &  19.12.2012

=================================


Punjab Acid-Chem Private Limited  plans to expand  its Chemical Manufacturing Unit that involves  expansion  of its  Sulphuric Acid  production Capacity of  from 75 TPD to 200 TPD  along with setting up of new production line to  produce   Oleum : 70 TPD, Di-Methyl Sulphate : 30 TPD, Sodium Bi-sulphite : 30 TPD, Sulfamic Acid : 30 TPD and Liquid SO3 : 30 TPD at Village: Behra, Gulabgarh-Behra Road, Derabassi in Mohali, Punjab. 

Capacity :

Expansion:

Sulphuric Acid :

Expansion : 75 TPD to 200 TPD

 

New Product Line:

Oleum                      : 70 TPD

Di-Methyl Sulphate : 30 TPD

Sodium Bi-sulphite : 30 TPD

Sulfamic Acid          : 30 TPD

Liquid SO3               : 30 TPD

 

 

Location : Village: Behra, Gulabgarh-Behra Road, 

                 Derabassi in Mohali, Punjab.

 

As 0n  January 08, 2015 : The Project is  under Planning Stage.

 

The  expansion project  would come up within existing 10 Acres of Land .

 

IMPORTANT: As per the discussion we had on 29.12.2014 with Punjab Acid-Chem Private Limited the Project is under Panning .

 

The company is now  waiting for  “Environment Clearance.

 

The project is a bit delayed due to the delay in getting “Environment Clearance.

 

The project work is likely to start by

Mid of 2015.

 

The Project   is Scheduled to be  Completed by

by March, 2016. 

 

--------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address to obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler  : 6 TPH – 1 No.

Fuel  : Biomass

 

Heat Exchangers, Air Pre-heater/Economiser)

 

Pullution Control Equipment:

Scrubbers

To control emissions from Process Vents adequet Scrubber will be installed.

 

Air Cooled Condenser

Chiller

Storage Tanks

(MS Tanks, HDP Drums and fibre drums for

 storage of raw material and product)

Multiple Effect Evaporators

Reaction Vessel

 

DG Set :  A  D.G. sets will be installed for stand by arrangement..

Silencer (Acoustic enclosures) to be provided to D.G.

 

Cooling Tower

Compressors

Pumps

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system 

*******************************

Water Treatment Plant :

Pumps, Valves, Custom Pipeline Work, Plumbing Work

(Oxidisation Chamber, Filter/ IRF, DM/  R.O. Plant, )

 

The total water requirement shall be 245 m3/day and will be met from Company’s Own Tube-well . 

WATER BALANCE DETAIL:

1.             Boiler feed                        :  120 m3/ day      

2.             Cooling  Tower                     :  30 m3/ day

3.             Process                              :  85 m3/ day

4.             Domestic                             : 10 m3/ day 

---------------------------------------------------------------------------------------

                                    Total  245 m3/day

Effluent  Treatment Plant:

The Effluent Treatment scheme will comprise of

 

Stage – 1    -Primary Treatment

Stage – 2  -  Secondary Treatment

Stage – 3  - Tertiary Treatment

 

The effluent generated from the the plant  will be  mainly from Process, Washings, Scrubbers, Cooling Towers & Boiler Blow downs and domestic effluent.

 

Supply Of Other Equipments:

Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes.

 Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Cooling Tower/ Plant,Hoses, Air Conditioning , Cables, Air Conditioning M/c., Automatic Weighing Machines for Bulk & Liquid Materials, Complete Laboratory. 

Fire fighting System as per TAC norms. 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Boiler, Air Pollution Control Equipments: Scrubbers/ Cyclone Separators , Water &  Effluent  Treatment Plant , Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes. Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Cooling Tower/ Plant, Air Conditioning , Fire Fighting Equipment, Air Conditioning, Cables, Automatic Weighing Machines for Bulk & Liquid Materials,  Complete Laboratory Equipments , Custom Pipeline Jobs, Pharmaceuticals Plant & Machineries etc.  for the above project  may  Contact for Specified Enquiry at   :

 

Punjab Acid-Chem Private Limited

SCO 288, 1st Floor, Sector-32 

Chandigarh- 160032, Punjab. India

------------------------------------------

Tel         :   +91-172-2600083/2603784

Fax        :   +91-172-2601027

Email       :      in...@punjabacidchem.com

Website :       www.punjabacidchem.com

*****************************

            New Projects

             

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

            RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”



Jan0415.jpg
Reply all
Reply to author
Forward
0 new messages