Update : VBC Fertilisers Plans To Set Up Fertilizer Plant With Captive Power......

98 views
Skip to first unread message

Industrial Directory Of India

unread,
Oct 29, 2013, 2:13:05 AM10/29/13
to industrialdir...@googlegroups.com
                 “New Projects This Week" 

                          RELEASED : ISSUE OCTOBER 27/13 

              Comprising  of  Total  82 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

  VBC Fertilisers Plans To Set Up

  Fertilizer Plant With Captive Power

  ==================================== 

         (Update :   Refer our Earlier Report on

          18.07.2012, 31.12.2012  & 03.07.2013)   

   ==================================== 

                                      

VBC Fertilisers and Chemicals Ltd.  plans to set up a a Fertilizers manufacturing unit to produce Ammonia having capacity of

 1.45 MTPA, Urea Plant having capacity of 2.52 MTPA, Ammonium Nitrate Plant having capacity of 0.330 MTPA and Nitric Acid Plant having capacity of 0.264 MTPA along with a 135 MW(2x 67.5MW) Captive Power Plant  at Jayanthipuram Village in Krishna District in Andhra Pradesh.

 

Capacity :  

 

1. Ammonia Plant         

          Annual Production 1.45 MTPA

          In Two Streams of 2200 Ton/Day capacity each

---------------------------------------------

2. Urea Plant Plant         

          Annual Production 2.52 MTPA

          In Two Streams of 3850 Ton/Day capacity each

---------------------------------------------

3. Nitric Acid Plant         

          Annual Production 0.330 MTPA

          In One Stream of 800 Ton/Day capacity

---------------------------------------------

4. Ammonium Nitrate Plant         

          Annual Production 0.264 MTPA

          In One Stream of 1000 Ton/Day capacity

 

              [Plant Stream : 330 Days ]

 

Captive Power Plant : 135 MW(2x67.5MW)

 

Location : Jayanthipuram Village

                Krishna District, Andhra Pradesh

 

As On  October 29, 2013 : The Project is  under Planning Stage.

 

The  Project will   come  up on 498.93 Acres of Land.

Out of  this  33% of the area will be developed as Green Belt.

 

 IMPORTANT: As per the discussion we had on 21.10.2013 

VBC Fertilisers and Chemicals Ltd.  the Project is under Panning

Stage now.

 

The company was waiting for final approval of 498.93 acres of land allotment from the State Government.

 

On 10th May, 2013,  The land has been allocated to the company by the Govt. of Andhra Pradesh vide G.O.Ms.No.39/dt.10/5/2013.

So, as on date there is no litigation pending on the site.

The site is allocated by APIIC, Andhra Pradesh and is a part of designated industrial Estate.

 

As on date, Land development work is under progress.

 

Meantime, the company is waiting for Final “NOC” from   State Pollution Control Board to set up the plant .


The Project Work is likely to start from February/March 2014.

 

The Project   is Scheduled to be  Completed

in Two Years  from the date of commencement of project work

, latest by June, 2016.

 

==============================

So, this is the RIGHT TIME to contact  and Follow Up at

 following address for to obtain the detailed Enquiry 

of each product  in time and to submit your quotation subsequently.


***************************** 

The Main Scope of Supply includes:                

Boiler :160 TPH 2 Nos

Fuel               :  Natural Gas

 

[HRSG               : 2x160 MTPH HP Steam

  Service Boiler : 2x160 MTPH HP Steam]

 

Turbine  : 67 MW - 2 Nos

 

Heat Exchangers, Air Pre-heater/Economiser)

 

Pullution Control Equipment:

Scrubbers

The particulate emissions from Boilers, DG set, Captive Power Plant and Process Vent.

To control emissions from Process Vents adequate Scrubber will be installed.

 

Air Cooled Condenser

Fuel system

Storage Tanks

Multiple Effect Evaporators

Ball Mill

Reaction Vessel

Rotary Vacuum Dryer

Spin Flash Dryer

Reactor

Filter Press

Air Conditioning Plant

Pumps

Agitator

 

MANUFACTURING PROCESS

Ammonia Plant

Natural gas is the raw material and its requirement is 5.0 MMSCMD. For

manufacture of ammonia, a mixture of pure Hydrogen and Nitrogen in the ratio of

3:1 is needed. Hydrogen is obtained from natural gas, which contains about 90% of

methane (CH4) and nitrogen is obtained from atmospheric air.. 

Urea Plant

Urea is manufactured by reacting ammonia with CO2 under a pressure of about 150

Kg/cm2.  CO2 required for manufacture of urea is obtained from ammonia plant as a

byproduct during the purification processes of raw ammonia synthesis gas.

Chemical formula of urea is NH2-CO-NH2.

 

The major steps in the manufacture of urea are:

 Compression of carbon dioxide to 150 atm. Pressure.

 Pumping of liquid ammonia by plunger pumps to 150 atm.

 Admission of Ammonia and Carbon dioxide into a specially designed reactor for

synthesis of urea under 150 atm. Pr.

 Stripping of unconverted ammonium carbonate solution into ammonia and

carbon dioxide gases.

 Stage wise decomposition of remaining ammonium carbonate into ammonia and

carbon dioxide.

 Condensation of ammonia and carbon dioxide gases as ammonium carbonate

solution and its recycle into the system.

 Evaporation of urea solution.

 Prilling of concentrated urea melt from top of a tall prilling tower for formation of urea prills and bagging.

Ammonium Nitrate Plant:

Ammonium Nitrate is manufactured by direct neutralization of Nitric acid of 60%

concentration with ammonia vapour. Neutralization of Nitric acid with ammonia vapour HNO3+NH3 NH4 NO3

 Concentration of the Ammonium Nitrate solution is evaporator.

 The Ammonium Nitrate melt from the evaporation stage, with a concentration

of 99% is prilled in a prilling lower.

 Cooling of the AN Prills, Screening, Drying and final cooling of the product

prills.

 Coating of the prills to prevent the prills from coking

 Dehumidification of ambient air, heating of the dehumidified air and its use in

the coolers and dryer to avoid contact of the prills with direct ambient air

which contains moisture. Ammonia refrigeration system is employed for

cooling ambient air for its dehumidification.

 Bagging of the Ammonium Nitrate prills and storage of the bagged product.

 

Ammonium Nitrate Plant:

Pure, anlydrous liquid ammonia is the feed stock for manufacture of Nitric acid.

 

Liquid ammonia is vaporized in a shell and tube heater.

 

Vaporization is done by assing liquid ammonia on the shell side by heat exchange with water, which passes through the tubes. The water is chilled in the vapourizer and it is used in the absorption tower downstream for cooling of nitric acid in the tower.

The heated water is in turn passed through the vaporized tubes and heat balance is maintained between the absorption tower and the vapourizer..

 

Product Storage & Handling

1.         Silo  : 50000 MT

2.         Empty Bag Storage : 4.0 Million

3.         Baggage Storage: 14000 MT

4.         Bagging Plant:

         (10+2) Streams each of 6 TPH capacity

 

5. Ammonia Storage : 2x10000 MT

 

DG Set : . 1 No.

D.G. set (2 MVA ) will be installed for stand by arrangement..

Silencer (Acoustic enclosures) to be provided to D.G.

 

Cooling Tower(Circulating CW)

a.         Ammonia Plant      :  44130 m3/hr

b.         Urea Plant              26000 m3/hr

c.          Captive Power Plant :   1000 m3/hr

 

Compressor : 3000 Nm3/hr – 2 Nos

 

*******************************

 Water Treatment Plant :

Pumps, Valves, Custom Pipeline Work, Plumbing Work

(Oxidisation Chamber, Filter/ IRF, DM/  R.O. Plant, )

The total water requirement will be met from the ground water source.

 

The surface water requirement is to be met from Krishna and Paleru rivers totaling

10 MGD .. The water will be drawn through collection wells from the bed of the rivers and pumped to the storages in the plant site.

A lean season storage in 40.00acres would be constructed to meet requirement of water throughout the year, even when sufficient water is not available in the river during some of the month

Raw Water Treatment : (4+1) x 225m3/hr

D.M.Water Plant  

Capacity : (4+1) x 225m3/hr

Condensate Polishing Unit  

Capacity : As per requirement

 

Effluent  Treatment Plant:

The Effluent Treatment scheme will comprise of 

Stage – 1    -Primary Treatment

Stage – 2  -  Secondary Treatment

Stage – 3  - Tertiary Treatment

 

Blow-down waters from boilers and cooling towers will be  treated along with other liquid effluents in the plant effluent treatment system, connected with the large capacity guard pond (30,000 to 40,000 M3 capacity) which is proposed to be specifically provided as a measure towards zero effluent approach. The treated liquid effluent will conform to the statutory norms for irrigation water and this water will be used for the extensive green belt around the plants.

 

The wastewater from domestic source shall be sent to septic tank followed by soak pit to Sewage Treatment plant and treated water would be recycled for the green belt.

 

Supply Of Other Equipments:

Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes.

 Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Cooling Tower/ Plant,Hoses, Air Conditioning , Cables, Air Conditioning M/c., Automatic Weighing Machines for Bulk & Liquid Materials, Complete Laboratory. 

Fire fighting System as per TAC norms. 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Boiler, Air Pollution Control Equipments: Scrubbers/ Cyclone Separators , Water &  Effluent  Treatment Plant , Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes. Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Cooling Tower/ Plant, Air Conditioning , Fire Fighting Equipment, Air Conditioning, Cables, Automatic Weighing Machines for Bulk & Liquid Materials,  Complete Laboratory Equipments , Custom Pipeline Jobs, Pharmaceuticals Plant & Machineries etc.  for the above project  may  Contact for Specified Enquiry at   :

 

VBC Fertilisers and Chemicals Ltd.

3rd Floor, Progressive Towers,

 6-2-913/914, Khairatabad,

Hyderabad - 500004, Andhra Pradesh, India

------------------------------------------

Tel : + 91-40- 23315655, 23301206/208, 23320904

Fax : + 91-40-23324797

Email : v...@vbcindia.com / hyd1_...@sancharnet.in

Website : www.vbcindia.com

 

*****************************             

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                     Contact person's Name

                      E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         