Update : Gayatri Shakti Paper Plans To Set Up New Paper Unit with Captive Power..

578 views
Skip to first unread message

Industrial Directory Of India

unread,
Dec 12, 2013, 7:57:56 AM12/12/13
to industrialdir...@googlegroups.com
                    "New Projects This Week" 

                          RELEASED : ISSUE DECEMBER 08/13 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

Gayatri Shakti Paper Plans To Set Up

New  Paper Unit with  Captive Power

----------------------------------------------------------

              (Update : Ref Our Earlier Report of

                                24.07.2013

----------------------------------------------------------  


 Gayatri Shakti Paper & Boards Limited  plans to set up a NEW  UNIT

(UNIT-II)  for  Production   of Kraft Paper having capacity of  

15000 Ton/Month along with a  Coal fired boiler based

Co-Generation Power Plant having capacity of  15 MW 

at Notified industrial Area,  GIDC, Vapi, Tal: Pardi  in Valsad District, Gujarat.

 

Capacity : 

Kraft Paper:

Capacity  : 15000 Ton/Month

 

Co-Generation Power Plant:

Capacity : 15 MW

               (Coal Based)

                 

Location : Notified industrial Area, GIDC, Vapi

                 Tal: Pardi in Valsad District, Gujarat

       

*****************************

About

Gayatri Shakti Paper & Boards

-----------------------------------

Gayatrishakti Paper & Boards Limited is one of the leading manufacturers of coated 

duplex board in medium scale sector paper industry.

 

Its manufacturing plants are located in GIDC, Vapi, Dist, Valsad, Gujarat.

It consist of two paper mills, all located at Vapi in Dist, Valsad, Gujarat.

 

The First Paper Mill of the group was established almost 20 years back and in

subsequent years there is considerable progress made by the group by taking over of another one manufacturing unit.

It may be not an exaggeration to mention here that “Gayatrishakti Group” is the pioneer in manufacturing of paper products by recycling of waste paper as major raw material input.

Gayatrishakti Paper & Boards Limited commissioned its coated duplex board plant in Oct, 1997 with an installed capacity of 25200 MT per annum, which is currently producing 65000 MT per annum. The coated Duplex boards are manufactured by recycling of waste paper of various grades and quality mixed in predetermined proportion and it is one of the largest manufacturers in this field.

 

Subsequently, in parallel earlier, one unit viz. Kherani Paper Mills Pvt. Ltd, which is also located in GIDC Vapi at about 2 kms distance from GSPBL was taken over from GIIC. This unit too manufactures coated duplex board and is referred to as KPML. It was installed with a capacity of 12000 MT per annum, which is currently manufacturing 28000 MT per annum.

 

All two units are already operated at optimum level of capacity utilization.

 

NEW PROJECT :

Now the company  plans to set up a NEW UNIT (UNIT-II)  for  Production   of

Kraft Paper having capacity of  15000 Ton/Month along with a  Coal fired boiler based Co-Generation Power Plant having capacity of  15 MW at Notified industrial Area,  GIDC, Vapi, Tal: Pardi  in Valsad District, Gujarat.

 

 

This new  plant is not including interlinked and interdependent project.

 It’s a new unit for the manufacturing of Kraft Paper & proposed CPP will be used for generation of power & will be utilized for the manufacture of Kraft Paper.

****************************

                

As on  December 12, 2013The project is under planning stage.

 

The project will come up on  21082 Sq. Meter of Area.

About 33% of the plant area will be developed under green belt

 

IMPORTANT:  As per the discussion we had last with

Gayatri Shakti Paper & Boards Limited on 28. 11.2013,  the project is under planning stage.


There may be a bit change in installed capacity of Paper Unit.

 

The company is  still waiting for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 21 to 24 Months from the date of commencement

of Project Work.

 

*****************************

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

 *****************************

The Main Scope of Supply includes

Boiler (FBC)         :  85 TPH ( Coal Fired)

(Pr: 65 kg/cm2 Temp: 490 DegC)

Qty   :  1 Nos.         

                        

Heat Exchanger, Air Preheater

Pullution Control Equipment:

Electrostatic Precipitators, Bag Filters

The source of air pollution due to the proposed project will be Flue gas emission only. The source of flue gas emission will be from the stack attach to Boiler (a part of CPP).

Suitable APC (electro static precipitator) & adequate chimney height to be provided. Fly Ash handling system  also to be connected to a bag filter system for control of emission. Coal crushing unit shall be connected to air pollution control system.

--------------------------------------------------------------------------------------------

MANUFACTURING PROCESS:

FOR KRAFT PAPER:

a) Waste paper is sorted and loaded on Sat Conveyor where the weight can be seen, how much waste paper are being fed  to Medium Consistency Pulper to slush the waste paper which comes in modern pulping system where the manufacturer can maintain the fiber strength as it is. In older system, fiber gets weaken.

 

b) The pulp is dumped to a dump chest through Poire Separator or Vibrating screen to eliminate other unwanted materials.

From poire separator, pulp is passed through Sand trap to an inclined Screen to extract water and then it is transferred to refiner chest.

The pulp is refined through a tri-disc refiner and passed to another chest where chemicals

and dyes are added as per requirements. Thus treated pulp is kept in stock chests with

continuous stirring with the help of agitators. Then the pulp is sent to head box of the

Paper Machine after cleaning it through centri-cleaners to remove heavy particles and additives, etc. The processes up-to this stage, it is called Wet stage.

 

c) The wet pulp is sent through paper head box at a consistency of 0.5% to 1.0%.

Application of vacuum in the hydro-foils will enable removal of water and moisture.

The web coming out through a press is dried over steam-heated cylinder and the paper is

thus produced. The paper is re-winded and labeled and ready for dispatch. 

 

Steam Turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Fuel system

Screen

 

Coal handling system

Design data for fuel (Coal) handling system consist of following equipment:

1. Ground hopper

2. Flap gates

3. Vibrating feeder

4. Magnetic separator,

5. Belt conveyers

6. Reversible belt conveyers

7. Junction house

8. Belt weigher

9. Dust collection system

At  Crusher house

1. MCC with compartment type starters along with whole CHP control system

2. GI hood for all conveyers

3. Both side walk way with hand rails

4. Motorized operated rack & pinion gate

 

Cooling Tower

(Capacity :  100 TR)

Chilling Plant

(Capacity :  30 TR)

 

Paper Machine :  1 No

Turbo Separator, Dryer

Centricleaner

Agitators

Digestors

Stock Thickner

Lime Klin  

Press, Rewinder

 

DG Set : A DG set will be installed to meet the power

                    Requirement for  Emergency ( ie. During  Power Failure)

 

Gear Box:

Inline Helical ( 40 : 1 /  Size : A 337)

 

Water Treatment Plant :

Pumps, Valves, Custom Pipeline Work, Plumbing Work

(Oxidisation Chamber, Pressure Sand Filter / IRF, RO/ *DM Plant,

Clarifier )

*DM PLANT : CATION --> DEGASSER--> ANION-->MIXED BED 

The total water requirement for the project will be 1480.11 m3/day..

 Water will be sourced from GIDC Vapi..

 

Details of Water Consumption

I.         Domestic                   :        50       m3day

2.       Processing                 :       158.11 m3/day

3.       Cooling tower             :        800     m3/day

4.       Boiler                          :        422     m3/day

5.       Gardening                 :          50      m3/day

------------------------------------------------------------------------

Total                      :     1480.11 m3/Day

 

 Wastewater treatment plant :

Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal:

 

Total 1480.11 m3/day of fresh water requirement shall be met from Notified

Industrial area, GIDC Vapi.

 

Total 16401.89 m3/day of waste water will be generated from paper plant & sent

to ETP.

Out of which 16201.89 m3/day of primary treated water will be utilized in the

process.

 

Balance net effluent 200 m3/day of treated effluent will be sent to secondary &

tertiary treatment.

 

Effluent  Treatment Plant:    

 

The liquid effluent generated in this plant after installation / erection will

be from Boiler Cooling Tower, Clarifier and RO / DM plant blow downs.

 

 Out of 200 m3/day of tertiary treated effluent, 15 m3/day will be utilized for

coal/ash wetting & balance 185 m3/day of treated effluent recycled back to the

pulping machine.

 

70 m3/day of Cooling tower blow down, 18 m3/day of boiler blow down & 80

m3/day of DM plant regeneration will be reused in to the pulping machine.

Thus there will be no discharge of waste water into effluent drainage line of GIDC

Vapi. The hazardous wastes will be gen

Air Conditioning System

The air-conditioning system is to be designed to maintain the

following conditions in the spaces serviced:

25+2oC dry bulb temperature and 55+5 percent relative humidity for

control rooms, control pulpits, computer rooms, PLC rooms, laboratory

etc.

To meet the above requirement, air handling units using chilled water, package type air conditioning unit complete with compressor, condenserand ductwork are envisaged.

 

AC units/AHUs shall be installed in separate rooms adjacent to various conditioned spaces served. Conditioned air from AC units to the spaces served shall be provided by plenum/ductwork.

 

Wall mounted window model air conditioners have also been envisaged in some areas for the purpose of air conditioning

 

Conveyors: All the conveyor belts shall be covered with G.I. Sheets.

Water spray system shall be provided all around the stockpiles and dust suppression system around the conveyor system. 

 

Chemical Preparation Plant

The mill requires a ClO2 generation plant. This plant also includes a

process water chiller for efficient absorption of ClO2 gas into a solution for

use in the bleach plant.

 

Fire protection facilities

In order to combat any occurrence of fire in plant premises the following

fire protection facilities have been envisaged for the various units of the

plant.

Portable fire extinguishers

All plant units will be provided with adequate number of portable fire

extinguishers to be used as first aid fire appliances. The distribution and

election of extinguishers will be done in accordance with the requirement

of IS: 2190-91.

Hydrant system

A fire hydrant network system has been envisaged for the proposed mill.

Internal hydrants will be provided at suitable locations and different

hydrants will be provided normally along the road and in the close vicinity

of the units to meet the additional requirement of water for extinguishing

fire.

Automatic system

For oil cellars control rooms and computer rooms, automatic fire

extinguishing system has been envisaged.

 

Supply Of Other Equipments:

Material Handling Equipment : Conveying Systems, Hydraulic Equipments, Screen

 Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank . Fire Fighting Equipment etc.

Complete Laboratory Equipments

Fire fighting System as per TAC norms.

 

Green Belt Development Plan and a scheme for Rainwater Harvesting have to be put in place.

Green belt will be developed in 33% of total plant area.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

                                         

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Boiler, Air Pollution Control Equipments: Water &  Effluent  Treatment Plant , Material Handling Equipment : Conveying Systems, Hydraulic Equipments/Cranes. Acid Pumps, Motors, Heat Exchangers, Agitators and Mixers ,Valves, Dryers, Vessels, Custom Pipelines, Storage Tank , Fire Fighting Equipment, Air Conditioning, Cables, Automatic Weighing Machines for Bulk & Liquid Materials,  Complete Laboratory Equipments , etc.  for the above project  may  Contact for Specified Enquiry at   :

 

Gayatri Shakti Paper & Boards Limited

Gala No. 410-416, Raheja Plaza, CTS 844-15B, Shah Indl. Estate

 Veera Desai Road, opp Yashraj Studio

Andheri (West), Mumbai-400 053, Maharashtra, India 

------------------------------------

Tel           :  + 91- 22- 42380000

Fax             + 91- 22- 42380011

------------------------------------

Email       :  gayatr...@vsnl.net/ in...@gspbl.com

Website   :  www.gspbl.com

-----------------------------------------------------------------------------

Factory :

Gayatri Shakti Paper & Boards Limited

Plot No.799/1 G.I.D.C. Industrial Estate

Vapi-396 195, Gujarat, India 

------------------------------------

Tel           :  + 91- 260- 2400451/ 2401588/2400411

Fax             + 91- 260-2400451

------------------------------------

Email       :  gayatr...@gmail.com/gspbl...@sify.com

                    in...@gspbl.com

Website   :  www.gspbl.com

 

****************************

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                     Contact person's Name

                     E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online



Dec0813.jpg
Reply all
Reply to author
Forward
0 new messages