Suryadev Alloys Is Setting Up 2X35 MW Coal Based Power Plant

744 views
Skip to first unread message

Industrial Directory Of India

unread,
Jan 12, 2011, 1:15:27 PM1/12/11
to industrialdir...@googlegroups.com

                      “New Projects This Week" 

                    RELEASED : ISSUE January 09 / 11

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
                (Published Every Week :Electronic Issue)
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit : http://industrialdirectoryofindia.com/FAQ

        ( Helpline : +91-900 7158 600)

   

  Suryadev Alloys Setting Up 2X35 MW

        Coal Based Power Plant   

                                      

Suryadev Alloys and Power Private Limited is  setting up  2 x 35 MW CFBS Coal based Power Plant & 18 MW  WHRB Co-generation Plant along with Expansion of Existing Steeel plant to produce 9,00,000 Tons/year of rolled products with 9,20,000 Tons/year of billets, 50 Tons/ day Oxygen Plant  at  New Gummidipoondi & Sirupulalpettai Villages, Tiruvalluvar District  in Tamilnadu.

 

Capacity :

 

New Plants:

Power Plant      : 2 X 35 MW ( CFBS Coal Based)

Co-Gen Plant    : 18 MW  WHRB

Oxygen Plant    : 50 Tons/Day

Sponge Iron Plant : 2,31,000 Tons/year

Expansion:

Steel Plant : From 140,000 to 9,00,000 TPA

                      (Additional : 7,60,000)

Intermidiate Product Billets:

                     From 140,000 to 9,20,000 TPA

                      (Additional : 7,60,000)


Location :  

New Gummidipoondi & Sirupulalpettai Village,

Gummidipoondi Taluk,Tiruvalluvar District,Tamilnadu

               ,     

As 0n  January 13, 2011 : The Project is  under Planning Stage.

 

The  project would come up on about 90 Acres of Land .

( Existing Land is 29.01 Acre, additional 90 Acre of Land is acquired for the   

   above Project)

 

IMPORTANT: As per the discussion we had on 07.01.2011 with Mr. Balaji, Executive Officer of  Suryadev Alloys and Power Private Limited,  the Project is under Panning Stage now. 

 

The Project work is expected to be started From  April,2011. 

 

The Project  is Scheduled to be  Completed by by December 2012 .

 

The Main Scope of Supply includes:

Boiler : Fuel : Coal fired

                 (Circulating Fluidized Bed Combustion Boiler)

Heat Exchanger, Air Pre- Heater/ Economiser

 

Induction Furnace  -  30 Ton & 40 Ton

Re-Heating Furnace

Aod / Laddle Furnace

Rolling Mill

Rottary Klins : 175 Ton - 4 Nos

DG Set :

650 KVA &  750 KVA ( 2 Nos)

 

Co-Generation Power Plant

The process of sponge iron making by the DRI route will  produce a large quantity of flue furnace gas. About 3500 N.Cu.m of flue gas with a calorific value of 900 K.Cal/N.Cu.m will be generated per ton of hot metal produced. It is estimated to generate about 18 tons per hour of steam, which inturn generates about 9000 KW power per 2-kilns, and Hence total Power Generated for 4-kilns together will be 18 MW. The Co-generation power plant will use Air Cooled Condenser for main condensate cooling.

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack (110 m Height)

Fuel system

Air Pollution Control Equipment :

High Efficiency Electro Static Precipitators (ESP)

 

Use of Limestone in CFBC boiler to limit SO2 emission

Use of Air Cooled Condenser to reduce water

ESP to minimize the emission of particulate matter.

Dust Control System to minimize the fugitive dust.

Mechanical Handling of scrap and scrap for feeding the raw material to furnace.

A local hood with adequate ID Fan capacity to absorb all the fumes from melting furnace.

Provision of water spray scrubbers to all the electric induction furnace and stack of 30m height.

Use of producer gas in reheating furnace and stack of 30m height.

Provision of ESP to the rotary kiln of sponge iron plant.

Closed shed for coal storage , and water sprinkler in iron ore storage area.

Provision of 30m height stack for LRF/AOD furnace.

Provision of ESP/Stack for Boiler.

Provision of wind shield/water sprinkler for coal storage.

Provision of bag filters at all the transfer point of the Conveyor.

Provision of bag filters at Ash Silo.

Maintaining water column on the Ash Dyke.

Black topping of roads to prevent fugitive emission during transportation

Use of dolochar from sponge iron plant in CFBC Boiler.

Implementation of Rain Water Harvesting System to meet ground water requirements.

Dust Suppression System like fog type and water spray system will be

installed in the material unloading areas like fog type and water spray system will be

installed in the material unloading areas.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

Water sprinkler & Bag filter at transfer points.

 

Cooling Tower

Compressors

 

Water Treatment Plant

Filters, DM Plant 

Pumps Valves, Custom Pipeline Work

 

The water requirement of 678 m³/day is to be met from bore well within the site.

The plant has been provided with extensive re-circulation systems to minimize make-up water consumption as far as possible. The water requirement in the entire plant operation is only for cooling purposes.

 

Water : Daily Water Requirement :

Induction furnace coil cooling   : 210 M3

Concast Machine cooling            : 75  M3

T.M.T                                                : 90  M3

Boiler Make-up                              :108 M3

D.M. Plant                                        :10  M3

Rotary Kiln Cooling                       :180 M3

Domestic Consumption                     : 25  M3

--------------------------------------------------

                             Total : 678 m³/day

 

Waste Water & Effluent Treatment Plant:

The quantity of existing and upon expansion plant Industrial waste water viz. Boiler

/Cooling Tower blow down, D.M. Plant regeneration waste and sewage generation are as follows.

Effluent Generated Qty (KLD)

Industrial       : 261 KLD

Sewage          : 20 KLD

--------------------------

   Total   : 281 KLD

The Boiler / cooling water blowdown will be taken to 2- Consecutive Cooling Ponds, and then to Guard Pond. From Guard Pond the water will be used for green belt. The domestic sewage will be treated in Sewage Treatment Plant and discharged for green belt.    

  

Other Equipments :

Material Handling Equipment : Conveyor, Screen, Crushers, Hydraulic Equipment/Cranes.

Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant,

 

Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.

 

* An elaborate fire hydrant system covering all the buildings of the proposed power   plant as well as outlying areas including coal stockyard would be provided.

 

Rain water will be stored in a tank for further distribution to fire water storage tank and service water overhead tank.

In addition to the Fire Hydrant System, the following fire protection systems are proposed:

* Automatic High Velocity Water Spray (HVWS) System for the protection of

transformers;

* Automatic Medium Velocity Water Spray (MVWS) System and foam system for fuel oil tanks;

* Automatic MVWS system for coal conveyors, cable galleries, etc.;

* Automatic Sprinkler systems for certain select areas;

* Manual HVWS system for the protection of Turbine Oil Tanks; and

* Portable extinguishers and fire Protection as required

 

Green Belt Development plan in 30 Acres area Rain water harvesting pits will be constructed to harvest the roof top water inconsultation with State Ground Water Board.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :

 

Suryadev Alloys and Power Private Limited

# 2 & 4, "GOLDEN ENCLAVE", 4th Floor,

# 184 P.H Road, Kilpauk,

Chennai. Tamil Nadu, India.

Pin Code - 600 010

----------------------------------

Ph : +91 - 44 - 4222 1000

Fax : +91 - 44 - 4222 1029

Website : www.suryadev.in

 ------------------------------------------

Contact Person : Mr. Balaji, Executive Officer

                        Cell : 09381850018

---------------------------------------------------------------------------------

                       

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  http://www.industrialdirectoryofindia.com/download


We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 

Jan0911.jpg
Reply all
Reply to author
Forward
0 new messages