Neelikon Food & Chemicals Plans For Expansion Of its Chemical Unit

146 views
Skip to first unread message

Industrial Directory Of India

unread,
Apr 13, 2016, 2:55:13 AM4/13/16
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

    Released
               "New Projects This Week" 

                   RELEASED : ISSUE APRIL 10 /16

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600)  

                     New Project

                                                       

Neelikon Food & Chemicals Plans For

  Expansion Of its Chemical Unit

    

Neelikon Food Dyes And Chemicals Limited plans for expansion programme at its chemicals unit at MIDC-Dhatav-Roha, Taluka-Roha in Raigad District, Maharashtra.


The project involves expansion of Synthetic Coal Tar Dyes, Lakes & Pigments for Food, Drug Cosmestic, Personal Care and Ink Industires, Natural Colours and Chemicals  from 150 Ton/Month to 850 Ton/Month. 

  

Capacity Expansion : From 150 Ton/Month to 850 Ton/Month


Project Cost : Rs. 114 Crores

               

Location   :           MIDC-Dhatav-Roha, Taluka-Roha 

                             Raigad District, Maharashtra

 

**************************************

As on  April 13, 2016 : The Project is under Planning Stage .

 

Total site area is  39569 Sq. Meters

An area of about  5541.51 Sq. Meters  will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 05.04.2016 with Neelikon Food Dyes And Chemicals Limited  

the Project  is  under Panning Stage.

 

The company is  waiting for Environmental Clearance.


The Project   is Scheduled to be  Completed 

in 12 - 15 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time 

and to submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

1.Boiler : 5 TPH  - 2 Nos.

Fuel            :  Coal 

Stack / Dia.:  30 Meters/ 500 mm

2.Hot Air Generator :  2 Nos.

    Capacity :  14000 CFM

Fuel            :  Coal 

Stack / Dia.:  20 Meters/ 500 mm

  

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

For Boilers Cyclone &  Bag filter  will be provided with  Stack. 

 

Single Stage Scrubber  will be also be provided.


The process emissions from the process are Ammonia and HCl and will be scrubbed with caustic and scrubbed waste will be sent to MEE. 

The other gases expected in the process are Carbon dioxide, will be  let out into atmosphere.

 

************************

Existing Status of Heating Equipment:

Presently the company is  operating  One No. of Boiler of  following Capacity: 

1. Boiler 

Capacity : 5 TPH - 1 No.

Fuel            :  Coal 

Stack / Dia.:  30 Meters/ 500 mm

2.Hot Air Generator :  1 No.

    Capacity :  14000 CFM

Fuel            :  Coal 

Stack / Dia.:  20 Meters/ 500 mm

************************

Other Equipments:

Reaction Vessel

Dryer

---------------------------------------------

Chilling Water plant

---------------------------------------------

Scrubbers(single stage)         

-----------------------------------------------

Cooling Tower     

----------------------------------------------

DM/R.O. plant          

---------------------------------------------

Air Compressor              

----------------------------------------------

Effluent Treatment Plant   

----------------------------------------------

HDPE Storage Tanks             

-----------------------------------------------------

MS/SS Solvent Storage Tanks

-----------------------------------------------------

Weighing Balance 

----------------------------------------------

Fire Hydrant System 

 

**************************

DG set (new) :   750 KVA1No.

DG set (existing)  :  750 KVA -  1 No.                                             

           

For back up in the common areas as well as for essential services

above THREE D.G.sets will be used.

 

Water Treatment Plant:  

 Pumps, Valves, Custom Pipeline Work, Plumbing Work  t


 Water requirement of the project for domestic and industrial activity :


Existing: 520 m3/day & After Proposed expansion: 1750 m3/day

 

The water requirement will be met from local suppliers through tankers. 

 

************************************************************************

 

Details of Water Consumption after Expansion

1.Domestic                                   :200   M3/Day

2.Process Water                        :  638  M3/Day

3.Boiler Make up                         : 90    M3/Day

4. Cooling  Tower(make up)      60  M3/Day

5. RO                                            :   25  M3/Day

6. Green Belt                                 20   M3/Day

7. Washings                              :   717 M3/Day

---------------------------------------------------------------------------------------

                             Total:  1750 M3/ Day

 

Waste Water Generation

Existing: 436.3 m3/day & After Proposed expansion: 1438 m3/day


Details of Waste Water Discharge

1.Domestic                                   :180   M3/Day

2.Process Water                        :  510  M3/Day

3.Boiler Blow Down                     : 3,6    M3/Day

4. Cooling  Tower                        2.4  M3/Day

5. RO                                            :   25  M3/Day

6. Green Belt                                 0    M3/Day

7. Washings                              :   717 M3/Day.......

---------------------------------------------------------------------------------------

                             Total:  1438 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 1500 KLD


Existing E.T.P. is designed for 500 KLD 

and it is proposed to be expanded to 1500 KLD capacity.


Reverse Osmosis Plant 

Total effluent generated in the project is 1438 m3/day 

The treated water will be reused for plant operations.


The process waste water from Process, floor Washes, scrubbers, QC and R&D are

evaporated in MEE with stripper and ATFD after neutralization


The condensate from MEE and ATFD will be collected and treated in effluents treatment plant along with

effluents from utilities followed by RO. RO rejects will be send back to MEE and RO

Permeate will be re-used back.


To treat the sewage generated due to domestic activities will be disposed through

septic tank following by soak pit.

**************************

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in 6760  Sq. Meter Sq. Meter  of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Neelikon Food Dyes And Chemicals Limited  

D-8, Everest, 5th Floor, Pandit M.M. Malaviya Marg

Tardeo Circle, Mumbai-400034, Maharashtra, India

-------------------------------------------------….

Tel      : +91-22-66626874/ 23524806 / 66627225

Fax     : +91-22-40179292 

Email     :   in...@neelikon.com

Website :   www.neelikon.com 


            New Projects

 **************************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”    

   

Apr1016.jpg
Reply all
Reply to author
Forward
0 new messages