Angadi Sugars Plans To Set Up 10 Lakh TPA Sugar Plant with Captive Power Plant

1,021 views
Skip to first unread message

Industrial Directory Of India

unread,
Apr 3, 2012, 4:02:52 AM4/3/12
to industrialdir...@googlegroups.com

            “New Projects This Week" 

                   RELEASED : ISSUE APRIL 01 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

  Angadi Sugars Plans To Set Up

10 Lakh TPA Sugar Plant with CPP

 

Angadi Sugars & Power Limited  plans to set up a

10 Lakh TPA Refined Sugar Plant  along with  a

14 MW  Biomass Based Captive Power Plant 

at Ganikoppa Village, Bailahongal  Taluka in Belgaum District , Karnataka. 

 

Capacity:

Sugar Plant                   10 Lakh TPA

Captive Power Plant     14 MW 

(may be increased upto 22 MW)

Location : 

Ganikoppa Village, Bailahongal  Taluka,

Belgaum District , Karnataka. 

 

As 0n  April 03, 2012The Project is in planning stage.

 

IMPORTANT: As per the discussion we had last with

Angadi Sugars & Power  Limited on March 24, 2012  the company is waiting for the  Environment Clearance and “NOC” from State Pollution Control Authority.

 

**************************

Although the company is expecting all the clearances and approval from the govt. within a month or two, but they want to start the Civil work from October,2012 to avoid the Rainy Season.

***************************


It will take 18 months to finish  the project work and is Scheduled to be  completed by March,2014.

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

*****************************

The Main Scope of Supply includes:

Boiler : 70 TPH  Fuel : Bagasse

( alternatively 120 TPH if  the Captive Powe Plant’s Capacity fix up to 22 MW  instead of 14 MW.

 

Note :

As per the discussion we had   with Angadi Sugars & Power  Limited

on March 24, 2012,  since the final technical  parameters has not been freezed  so far ( but under approval stage)  the capacity of Captive Power  Plant may go up to maximum  22MW . In that case, capacity of Boiler will increase from   70 TPH to 120 TPH)

 

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Pollution Control Equipment :

Wet Scrubber is proposed for the boiler to contain the dust emissions from the plant within the prescribed pollution control norms.

 Besides above the height of the stack; which disburses the pollutants is to be fixed based on the guidelines given by the pollution regulation of the state.

 

Steam turbine  

Coal handling system

Ash handling system

Ash handling system collecting ash from furnace, Combustion chamber ,Economiser, air heater and wet scrubber shall be transported by

Belt Conveyors to a Silo to be provided.

Turbo Alternator :

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

Cooling Tower

Cooling water system The system shall cater to the requirement of the condenser for turbo generator, the auxiliaries of the turbo generator and the auxiliaries of the steam generator. A two cell, induced draft (1 running, 1 standby) cross flow cooling tower, to meet the cooling water requirement for the co-generation plant shall be provided.

Cooling Pond

Air conditioning and Ventilation system :

The main plant control room housing the controls for the boilers and the turbo generators shall be air conditioned with split air conditioners and suitable exhaust fans to ensure effective ventilation and dust free atmosphere.

DG set : 

As stand by during Power Failure.

 

Compressors

Weigh Bridges (For Cane Milling Plant)

Cane Handling and Feeding Arrangement

.

Rotary Screen    :     for juice screening-

Bagasse belt conveyor A belt conveyor is to be installed to receive the bagasse from last mill discharge chute and to carry it to bagasse elevator. 

Bagasse Elevator : To carry  bagasse .

Crane and Gantry: For Mill House

 

Clarifier.

Vacuum Filter

Injection pumps :

Injection Pump for Evaporator.

Injection pump for pans :

 

Sugar Receiving Gross Hopper : 1 No.

One receiving hopper vibratory type shall be provided below batch type A-centrifugal machines. The hopper shall be made of M.S. plate .

 

Sugar Belt Conveyor : 1 No.

An inclined toughed belt conveyor positioned to received wet sugar from the

Grass Hopper Coveyor.

 

Fluidised Bed Sugar Dryer : 1 No.

To dry and cool the sugar received from belt conveyor suitable for bagging.

 

Water Treatment Plant

Oxidisation Chamber,Filter, R.O. Plant/DM Plant.

Pumps Valves, Custom Pipeline Work

---------------------------------------------

Total Requirement of Water:

The maximum water will be required for Power Plant. Since the Capacity of power plant has not been freezed the toatal capacity of water is now on working out stage. 

 

Polishing plant : For hot condensate from Evaporators & Pan along with Cooling System.

 

Effluent Treatment System and Scheme

The sugar effluent shall be treated based on Two Stage Aeration System, the State of the Art technology. The treated effluent shall be utilized on its own land for land application.

 

Other Equipment

Material Handling Equipment : Conveyor, Hydraulic Equipment 

DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials.

Straight Line Steam Tunnel

Pneumatic Piston Filler

Pressure Filler

Storage Tank, Hoses,Cables

Ventilation & Exhaust System                     

Complete Laboratory Equipments.

 

Fire fighting System as per TAC norms,

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Green Belt Development plan in 33%  area and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery plant.   may  Contact for Specified Enquiry at :

Angadi Sugars & Power Limited
4855/83, Laxmi Complex, APMC Road, 1st Cross

Shri Laxmi Complex Belgaum-590001, Karnataka, India

-----------------------------------------------

Tel  : + 91-831-2405140

Fax : + 91-831-2473826

Email :  vchire...@gmail.com


==============================================

               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                     Contact person's Name

                      E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 

 

 

 

 

 


Apr0112.jpg