Aeidan Industries Plans To Set Up 1040 Ton/Month Chemical Unit

398 views
Skip to first unread message

Industrial Directory Of India

unread,
Sep 17, 2013, 12:58:55 PM9/17/13
to industrialdir...@googlegroups.com
                       "New Projects This Week" 
                          RELEASED : ISSUE SEPTEMBER 15/13 
              Comprising  of  Total  81 New Project Enquiries 
  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
           Visit http://industrialdirectoryofindia.com/FAQ

          (Helpline : +91-900 7158 600) 

 

    Aeidan Industries  Plans To Set Up
     1040  Ton/Month Chemical Unit

                            
Aeidan Industries  plans to set  up a Synthetic Organic Chemical Production Unit
having Capacity of  1040 Ton/Month at Jhagadia Industrial Estate, Jhagadia in Bharuch, Gujarat. 

Capacity :  1040 Ton/Month

Following Products will be manufactured in the proposed plant : 

  1. Meta phenoxy benzyl alcohol      :     120  Ton/Month
  2. Para Anisic Alcohol                        :       60  Ton/Month
  3. Cinnamic alcohol                           :       30  Ton/Month
  4. 3 Amino 9 Ethyl Carbazole

     (AEC) solution                               :        62  Ton/Month

  1. 2,4 di methyl aniline

     (2,4 xylidine) solution                 :       78  Ton/Month

  1. Benzyl acetone                             :       30  Ton/Month
  2. 2,5 Dichloro aniline                       :       60  Ton/Month
  3. Acetanilide                                      :     600  Ton/Month

-------------------------------------------------------

                        Total  :   1040 Ton/Month 

[By product : 18 – 20% Acetic Acid Solution : 90 Ton/month]

 

Location : Jhagadia Industrial Estate
                 Jhagadia in Bharuch, Gujarat.

 

**************************************

As on  September 17, 2013 : The Project is under Planning Stage . 

Total site area is  6200 Sq. Meter.

An area of about  2110 Sq. Meter, 34.03%  of the total project area will be developed with green belt.

 

IMPORTANT: As per the  discussion we had on 09.09.2013 with
Aeidan Industries    the Project  is  under Panning Stage.

 The company is waiting for Environmental Clearance.

 
The Project   is Scheduled to be  Completed in 12 Months
From the date of commencement of the project work. 

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address 
to obtain the detailed Enquiry of each product  in time and to
submit your quotation subsequently.
 
 
**************************
The Main Scope of Supply includes 
 
Boiler           : 1 TPH  - 1 No.
                 Fuel           :  Briquette (250 kg/hr)
                 Stack
         :  30 Meter (Dia : 500 mm)

 

Thermic Fluid Heater
Capacity  : 15 Lakh  Kcal  - 1 No.
                 Fuel           :  Briquette (600 kg/hr)
                 Stack
         :  30 Meter(Dia : 500 mm)  

Heat Exchangers, Air Pre-heater/Economiser).

 

MANUFACTURING PROCESS

META PHENOXY BENZALCOHOL

• To take 1000 Kg. Meta Phenoxy Benzaldehyde (MPBAD) in an Autoclave.

• Then add 5 kg. Nickel (Ni) Catalyst into it.

• Then 25 m3

 N2 gas is purged in autoclave and O2 is removed from autoclave.

• After this, pass 250 m3

 hydrogen for 10 to 12 hr.

• Then  to collect 5 kg Ni collect into filter after filteration.

• This spent Ni catalyst is sent back to the supplier.

• Total 1000 Kg. Meta Phenoxy Benzyl alcohol (MPB Alcohol) is collected & packed in GI /

HDPE Barrels. 

PARA ANISIC ALCOHOL

• First o  ttake 1000 Kg. Para Anisic Aldehyde in an autoclave.

• Then add 3.5 kg. Nickel (Ni) Catalyst into it.

• Then purge 25 m3

 N2 gas into autoclave and remove O2 from autoclave.

• Now pass 240m3

 hydrogen for 10 to 12 hr.

• The pressure is maintained at 10 to 12 kg. Now check conversion.

• When conversion is completed then to Filter Para Anisic Alcohol.

• At this stage, 3.5 kg Ni is collected in filter after filteration.

• This spent Ni catalyst is sent back to the supplier.

• Total 1000 kg. Para Anisic Alcohol collected & packed in GI/HDPE Barrels.

 

ACETANILIDE

• Take 700 kg. Aniline in a Reactor.

• Then add 950 kg. Acetic acid & 5 kg toluene mixture slowly in a Reactor.

• Heat up to 1200 Deg C

•  To Collect Dilute Acetic acid.

• To Remove dilute acetic acid completely and then heat up 1200 Deg C to 1400

Deg C.

• Once it reaches upto 1200 Deg C to 1400 Deg C temperature then maintains it for 12 to 14 hrs.

• After maintaining temperature rise the temperature upto 1400 Deg C to 1500 Deg C.

• Then to add 45 kg. Acetic anhydrate in reactor carefully.

• After addition rise the temperature upto 1500 Deg C to 1950 Deg C in vacuum condition.

• When conversion is completed to Acetanilide, cool whole mass at room temperature.

• Then to chill the whole mass.

• Then to pass from flakers and collect the flakes of Acetanilide.

• Total 1000 kg. Acetanilide is collected & packed in 50 kg. PP woven/ HDPE Bags.. 

************************

Other Equipments: 

1. For Hydrogenation Plant:

SS  Reactor              :  4.0 KL
---------------------------------------------
Autoclave             :  4.0 KL
---------------------------------------------
Autoclave             :  3.0 KL
 ---------------------------------------------
Pressure filter (1000 mm)
 Qty   : 2 Nos.
---------------------------------------------
Receiver S.S. tank :   3 KL
 ---------------------------------------------
Vaccum pump with S.S. Tank   
Qty  : 1 Nos.
---------------------------------------------
Storage Tank     :  10 kL
 Qty  : 4 Nos.
--------------------------------------------
Safety valve (25 kg pr.)
Qty  : 2 Nos.
--------------------------------------------
Chilling plant & pump  :  40 TR
Qty                        : 1 No
---------------------------------------------
Rapture Disc (27 kg pressure)
Qty          :  2 Nos.  
-----------------------------------------------
Flame arrester
Qty          :  1 No.  
-----------------------------------------------
Cooling Tower with pump
Capacity          : 100 TR
Qty                        : 1 No .    
---------------------------------------------
FLP scale (300 kg max)    
Qty  : 1 No.       
-------------------------------------------
G.C. shimadzu     
Qty  : 1 No.       
-------------------------------------------
Skid Lifter  : 8 Tons
----------------------------------------------
Drum Lifter     :  1 Ton
----------------------------------------------
Valve    
---------------------------------------------
Pipe line :           
---------------------------------------------
Fire hydrant
---------------------------------------------
 
2. For Acetanilide Plant:
 
Reactor with distillation condenser    
Capacity   :  18KL
---------------------------------------------
Acetic acid pump
 Qty   : 1  No.
---------------------------------------------
Aniline pump
Qty   : 1  No.
 ---------------------------------------------
Vaccum Pump   
Qty  : 2 Nos.
---------------------------------------------
Storage Tank    
(50 kL, 25 kL x 2, 10 kL)

 Qty  : 4 Nos.

--------------------------------------------
Dilute Acetic Acid pump
Qty  : 1 No.
--------------------------------------------
Acetic Anhydride pump
Qty : 1 No
---------------------------------------------
Cooling Tower with pump
Capacity          : 400 TR
Qty                        : 1 No      
---------------------------------------------
FLP scale (100 kg max)    
Qty  : 1 No.       
-------------------------------------------
Flacker     
Qty  : 2 Nos.             

 

**************************

DG sets

200 KVA 1 No.

 For back up in the common areas as well as for essential services
above Four D.G.sets will be installed..

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work 

The total water requirement will be 40.5 m3/Day,

(Fresh : 34.5 m3/Day + Recycled : 6 m3/Day)

 Necessary water requirement for the proposed project
will be fulfilled from GIDC water supply.

 

Details of Water Consumption

1.Domestic                              :  5.0   M3/Day
2. Process Washing                :   2.0   M3/Day
3. Cooling Tower (Make-up)   :   23.5 M3/Day
4. Boiler                                  :   2.5    M3/Day
5. Softener Regeneration          0.5    M3/Day
6. Gardening                          :   7.0  M3/Day
---------------------------------------------------------------------------------------
               Total:  40.5 M3/ Day

 

Details of Waste Water Generation
1.Domestic                             :  3.0   M3/Day
2. Process Washing               :   2.0   M3/Day
3. Cooling Tower (blow down)  :   2.5   M3/Day
4. Boiler blow down               :   1.0    M3/Day
5. Softener Regeneration           0.5    M3/Day
---------------------------------------------------------------------------------------
                    Total:  9.0 M3/ Day

 

Effluent Treatment Plant:

The domestic wastewater generated will be 3 KLD which will be disposed off through Septic
tank/ Soak-pit system. The Industrial effluent generated will be 6 KLD.
 
The industrial effluent along with septic tank overhead will be treated
 in the proposed ETP. ETP treated effluent will be diverted to RO.
 
Permeate water from RO will be used in cooling tower makeup & RO reject will
be evaporated in evaporator. Sludge from evaporator will be sent to TSDF site for disposal...
 
 The untreated water will be collected in the Collection Tank then it will be diverted to
Neutralization Tank for pH adjustment.
 After the adjustment of pH settling over flow will be diverted to Holding Sump.
From holding sump it will be diverted to Pressure Sand Filter and
Activated Carbon Filter respectively for tertiary treatment.
 
The treated water will be then transferred to Reverse Osmosis.
 
The rejected water from R.O. will be transferred to Evaporator and Permeate will be recycled for Cooling Tower make up.
 
The Sludge collected from Primary  Settling Tank and Evaporator is send to TSDF site.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 

Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
 

Green Belt Development plan in 34.03%  area and a scheme for Rainwater Harvesting have to be put in place.                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  : 

 

Aeidan Industries   
Prop: Nandosal Industries
 Plot no. 4806/7, Ankleshwar GIDC Estate
Ankleshwar - 393002, Dist. Bharuch, Gujarat, India
---------------------------------------------------
Tel  : + 91- 2646- 220882
Fax : + 91-2646-227320
Email     : nandosali...@gmail.com
Website : www.nandosalindustries.co.in 


**************************************               

          FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES
                   Visit : http://industrialdirectoryofindia.com/FAQ
      GET NEW PROJECTS INFORMATIONS  ONLINE   
                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:
                 Company's Name
                 Address/ Phone/ Fax
                      Contact person's Name
                       E-mail Id
 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion. 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .


Visit : http://www.industrialdirectoryofindia.com/registration 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------         

             RELEASED ANNUAL ISSUE :
      “NEW PROJECTS THIS WEEK”
    Over 2250 Nos Projects Enquries Online

Sept1513.jpg
Reply all
Reply to author
Forward
0 new messages