Update : Veda Biofuel Plans To Set Up 120 KLPD Distillery with Captive Power Plant

117 views
Skip to first unread message

Industrial Directory Of India

unread,
May 14, 2013, 3:12:08 AM5/14/13
to industrialdir...@googlegroups.com
-            “New Projects This Week" 

                   RELEASED : ISSUE MAY 12 /13 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600)  

   

   Veda Biofuel Plans To Set Up

  120 KLPD  Distillery with CPP 

---------------------------------------------------------------

(Update :Ref Our Earlier Report of 25.02.2012 & 24.08.2012)

                                      

Veda Biofuel Pvt Ltd.  plans to set up   a  120 KLPD Grain based Distillery along with a  

5 MW Captive Power Plant at Nadipalli, Pusapatirega in  Vijayanagaram District, Andhra Pradesh.

 

Maize, Corn, Sorghum grain, Broken Rice and Starch based Grains will be used as raw materials.

 

The company will manufacture Ethanol from this unit.

 

Capacity :

Distillery                   : 120 KLPD

Captive Power Plant : 5 MW


 The project will be implemented in Two Phases:


1. Phase-I

Distillery                   : 60 KLPD

Captive Power Plant : 2.5 MW


2. Phase-II

Distillery                   : 60 KLPD

Captive Power Plant : 2.5 MW

 

Location : Sy. No. 4, 5, 6, 7, Village Nadipalle

                 Mandal : Pusapatirega

                 Vizianagaram District,Andhra Pradesh

                    

As on  May 14, 2013 : The Project is  under Planning Stage.

 

 

IMPORTANT: As per the discussion we had on 06.05.2013 Veda Biofuel Pvt Ltd.   the Project is under Panning Stage now.

 

The Land has been acquired.

The company has obtained the Environmental Clearance.

 

 The project work is likely to start soon , ie. May/June, 2013.

 

The Project   is Scheduled to be  Completed in Two Phases:


1. Phase-I

Distillery                   : 60 KLPD

Captive Power Plant : 2.5 MW


The project work is likely to start soon , ie. May/June, 2013 

and will be completed by June, 2014.


2. Phase-II

Distillery                   : 60 KLPD

Captive Power Plant : 2.5 MW


The project work is likely to start in Q1 of 2015 

and will be completed by March, 2016.

 

*****************************

The Main Scope of Supply includes:

Boiler      : 28 TPH .  

Fuel            : Biomass ( Husk) /Indian Coal

 

Heat Exchanger, Air Pre- Heater/ Economiser

 

Biomass/Coal will be used as raw material for Steam generation and Power requirement for ethanol plant.  

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Fuel system

Cooling Tower

Bottling Plant

Dryer

Multiple Effect Evaporators

Conveyors

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

To control the particulate emissions from the Rice Husk and Coal  Fired boiler will be controlled by ESP/Bag Filter and emissions will be dispersed through Stack of Suitable Height.

 

State of Art Bag Filter alongwith adequate stack height will be installed to bring down particulate matter to control particular matter within 100 mg/m3.

 

CO2 will be recovered and given to Bottling unit. 

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

After Air Pre Heaters flue gases will pass through an Electro Static Precipitator where the Dust Particles will be  collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 100 mg/Nm3 through a Chimney of prescribed height.

The dust will be  collected from the bottom of the ESP.

 

High pressure superheated steam from boiler will pass through a Steam Turbine and at the lower pressure will go to the condenser.

The part of the steam will be extracted from the extraction points provided on the turbine, which will be used for distillery.

 

The condensed steam will return to the steam boiler as condensate and will again be boiled as steam.

 

While passing through the turbine, the high pressure and temperature steam will rotate the turbine rotor and an Electric Alternator mounted on the same shaft.

 

Electric power will be generated by the alternator. This electric power generated will be consumed in house i.e. for running the distillery and utilities like boilers auxiliaries etc.

 

To control the particulate emissions from the Rice Husk and Coal  Fired boiler will be controlled by ESP/Bag House and emissions will be dispersed through Stack of Suitable Height.

 

DG set : DG sets  will be  installed for emergency power 

                      Back-up during power failure:

    

----------------------------------------------------------------

Water Treatment Plant, Effluent Treatment Plant

Sand Filter, Iron Filter, ACF, DM Plant, Tube Settlers etc.

Pumps Valves, Custom Pipeline Work

 

Water requirement  will be 800 m3/day.

 

Effluent Treatment Plant

Spent wash will be passed through decanter and thin slop from decanter will be dried in Multiple Effect Evaporators (MEE) followed by dryer upto 90 % solid w/w (DDGS). 

 

Non-process effluent like DM plant, Regeneration water & Boiler Blow Down will be neutralized in neutralization in neutralization tanks and will be mixed with Cooling Tower Blow down..

 

DDGS will be sold to outside parties. Sludge from neutralization tank (2 Kg/day) will be given to APPCB authorized vendors.

 

Ash from coal will be given to brick manufacturers/cement plant. Ash from biomass will be utilized as manure. Waste oil will be disposed to the APPCB approved vendors.   


 Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Veda Biofuel Pvt Ltd.  

0-50-15/2, Seethammadhara

Visakhapatnam-530013, Andhra Pradesh, India

------------------------------------------------------------------

Tel    : + 91–891-2711888

Fax   : + 91- 891-2711889

---------------------------------

Email     : e...@vedabiofuel.com

Website : www.vedabiofuel.com

                          

 ------------------------------- 

        

   FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

              

              Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

         http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                

May1213.jpg
Reply all
Reply to author
Forward
0 new messages