New Projects :7th May, 2017.....,..,..........

11 views
Skip to first unread message

Industrial Directory Of India

unread,
May 8, 2017, 10:39:42 AM5/8/17
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

    Released
             "New Projects This Week" 

                 RELEASED : ISSUE May 07/ 17

            Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) .
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit : http://industrialdirectoryofindia.com/FAQ

(Helpline : +91-900 7158 600/ 900 7742 600)   


 New Projects                         7th May, 2017

1Cement                                                             Project Cost : Rs.1600 Crore 
   

The company plans to set up a New Clinker Grinding Unit...

As of May 2017, The project is in planning stage.  Pre-Project Activates are on...   

Visit : http://www.industrialdirectoryofindia.com/download 

2Ceramic                                                               Project Cost : Rs.130 Crore  
 

Jaquar and Co. Pvt. Ltd. plans for expansion of its faucets production unit located at Bhiwadi in Rajasthan. The project involves increasing the capacity of faucets to 1 lakh pieces /day

As of May 2017, . The project is in planning stage.  Visit : http://www.industrialdirectoryofindia.com/download

3Ceramic                                                              Project Cost : Rs.90 Crore 
 

Jaquar and Co. Pvt. Ltd. plans for expansion of its recently acquired sanitary ware unit from Euro Ceramics located at Bhachau in Kutch District, Gujarat. The project involves increasing the capacity of the unit from 1.2 million sanitary ware pieces to 1.8 million pieces.

As of May 2017, . The project is in planning stage.  Visit : http://www.industrialdirectoryofindia.com/download

4Distillery                                                            
 
The company plans to set up a New Distillery . 
As of May 2017,Waiting for necessary clearance...Visit : http://www.industrialdirectoryofindia.com/downloa 
5Alcohol  & Derivatives                                                
 
The company plans to set up a New Ethanol Bio-Refinery...   
As of May 2017, .  Pre-Presect Activates are on.  Visit : http://www.industrialdirectoryofindia.com/download
6Pharmaceuticals                                                         Project Cost : Rs.55 Crore    
 
The company plans to set up a New Vaccines production unit.. .. 
As of May 2017, . The project is in planning stage.  Visit : http://www.industrialdirectoryofindia.com/download 
7Agro-Chemical                                                        Project Cost : Rs.240 Crore  
 
The company plans to expand the production capacity of its Pesticides & intermediates manufacturing unit.t.
 As of May 2017, The company is waiting for necessary clearance..... 
8Pharmaceuticals                                                   Project Cost : Rs.28Crore
 
TThe company plans for expansion of its API manufacturing Unit.
Project Work is likely to start by .October 2017. Visit : http://www.industrialdirectoryofindia.com/download 
9Pharmaceuticals                                                    Project Cost : Rs.21 Crore   
 
The company plans to expand its Active pharmaceutical ingredients, specialty chemicals Unit......
As of May 2017,  Pre-Project Activities  are on. Visit : http://www.industrialdirectoryofindia.com/download 
10Chemical                                                             Project Cost : Rs.78 Crore  
 
The company plans to expand the production capacity of from 15 TPM to 90 TPM
As of May 2017, The Project is in Planning Stage .Visit : http://www.industrialdirectoryofindia.com/download 
11Agro-Chemical                                                                
The company plans to set up a New Agro-Chemical Unit.,
As of May 2017, Land acquisition is underway...Visit : http://www.industrialdirectoryofindia.com/download..
12 Chemical                                                             
 

The company plans to set up a New Unit to produce Acetic acid....

The Project Work is likely to start by May/June 2017... Visit : http://www.industrialdirectoryofindia.com/download..   

13Edible Oil                                                        Project Cost : Rs.38 Crore 
 
The company which is engaged in Edible oil production, now plans to set up its New Unit..
As of May 2017,The project is waiting for "NOC' from State Pollution Control Board.
14Processed Food                                               
 

The company plans to set up a New Food products manufacturing unit.. 

The Project Work is likely to start by October 2017..,.   Visit : http://www.industrialdirectoryofindia.com/download  

15Polymer/Resin                                                 Project Cost : Rs.3 Crore
 
The company plans to set up a new Polyester Resin manufacturing Unit.
As of May 2017, Pre-Project Activities are on. Visit : http://www.industrialdirectoryofindia.com/download.. 
16Inorganic Chemicals                                             Project Cost : Rs.650 Crore
 

Inox Air Products Private Limited plans to set up at least Six New Air Separation units (ASU) accross the country.

It will be a combined capacity of about 1,200 TPD of liquid product and will cater a variety of regional markets and industry segments across the country, like pharmaceuticals, steel, glass and many others. ,. The project is in planning stage. Completion Period : 2 Years.   Visit : http://www.industrialdirectoryofindia.com/ download  

17HVAC                                                                  Project Cost : Rs.200 Crore
 
Intex Technologies India Limited, which is a Mobile phones and consumer durables maker, plans for investment in its new air conditioning (AC) plant in Greater Noida in Uttar Pradesh.                                                                         As of May 2017, The project is in planning stage..Visit : http://www.industrialdirectoryofindia.com/download
18Oil & Gas                                                             Project Cost : Rs.228 Crore       
 

Indian Oil Corporation Ltd. plans for augmentation of Chennai- Trichy- Madurai pipeline project in Tiruvallur, Kanchipuram, Viluppuram, Tiruchirappalli Districts, Tamil Nadu. The project involves augmenting the capacity of CTMPL to 3.9 MMTPA. The project is estimated to cost Rs.228 Crore..

As of May 2017, Pre-Project Activities are on. Visit : http://www.industrialdirectoryofindia.com/download 

19Industrial Park                                                         
 

The company plans to develop a New Industrial Park in Kerala. The Project will come up on 450 Acres of land. Pre-Project Activities are on.Visit : http://www.industrialdirectoryofindia.com/download 

20Ports & Shipping                                           
 

Gujarat Maritime Board Plans for construction of jetty for providing berthing facility for pilgrims of Narmada Parikrama in the estuary of river Narmada at Luvara, Dahej in Bharuch District, Gujarat.....

As of May 2017, The project is in planning stage Visit : http://www.industrialdirectoryofindia.com/download

21Shipping Infrastructure                                                            
 
Kandla Port Trust plans for development of Dry dock / Ship repair facilities at Kandla in Kachchh District, Gujarat.....  As of May 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on  Visit : http://www.industrialdirectoryofindia.com/download
22Storage & Distribution                                             
 

The company Plans for construction of Godown with a capacity of 3,600 Tons.. .

As of May 2017, The project is in planning stage...  Visit : http://www.industrialdirectoryofindia.com/download

23Storage & Distribution                                           
 

The company Plans for construction of Godown with a capacity of 50,600 Tons.. .

As of May 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on.  Visit : http://www.industrialdirectoryofindia.com/download

24
 Storage & Distribution                                                         
 

Cochin Port Trust plans to develop a Grain Silos at Cochin Port Trust Area in Ernakulam District, Kerala..As of May 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on. Visit : http://www.industrialdirectoryofindia.com/download 

25Power                                                                      Project Cost :Rs. 5,000 Crore
 

The company plans to set up New Thermal Power Project based on CFBC Boiler...

As of May 2017,Project in Planning stage Visit : http://www.industrialdirectoryofindia.com/download.

26Power                                                               
 

The company plans for expansion of its Co-Generation Power. As of May 2017, the company is waiting for necessary clearance.. Visit : http://www.industrialdirectoryofindia.com/download.

27Power(Hydel)                                                                   
 
The company plans to set up a New Hydel power project 
As of May 2017,, Detailed Project Report is under Preparation
28Power(Hydel)                                                                  
 
Thane Municipal Corporation plans for setting up of grid connected mini Hydel based power unit on the feeder water pipelines of drinking water supply system in Thane District, Maharashtra on PPP basis.As of Mayl 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on .Visit : http://www.industrialdirectoryofindia.com/download   
29Power(Nuclear)                                           Project Cost :Rs.29,782 Crore 

Department of Atomic Energy, Government of India Plans for setting up of 2,800 MW (4 x 700 MW) Mahi Banswara nuclear based power unit situated on inland site and situated on the right bank of Mahi River at the upstream of Mahi−Bajajsagar reservoir in Rajasthan..As of May 2017, BThe project is in planning stage. Completion is targeted by December, 2019.

Visit : http://www.industrialdirectoryofindia.com/download 

30Iron & Steel                                                            Project Cost :Rs.21 Crore    
 

The company plans to expand its Mild Steel Billets manufacturing capacity...  

As of May 2017, The project is in planning stage.  Visit : http://www.industrialdirectoryofindia.com/download 

31Iron & Steel                                                         Project Cost :Rs.114 Crore 
 
The company plans to expand the production capacity of its ferro alloys unit.. 
Project Work is likely to start by September, 2017.    Visit : http://www.industrialdirectoryofindia.com/download 
32Iron & Steel                                     .               
 

Steel Authority of India Ltd (SAIL)- Bhilai Steel Plant,  plans for setting up of a 1.0 MTPA Pellet Plant along with Generated Fines/Slime Beneficiation Plant at Dalli Mines in Chhatishgarh. As of May 2017, Bids have been invited to appoint the Contractor to implement the project that includes Design, engineering, procurement, manufacture, fabrication, supply, transportation, insurance, storage, handling, dismantling & removal of debris, construction, erection testing, commissioning, stabilization and demonstration of performance guarantee of the complete plant and equipment to the satisfaction of the employer as detailed in Technical Specification on divisible Turnkey Basis and Last Date of Submission is 13th May, 2017...    

33Power (Solar)                                                       

hThe company plans for setting up of 20 MW Solar based Power unit.

As of May 2017,  The project is in planning stage.  Visit : http://www.industrialdirectoryofindia.com/download 

34Power (Solar)                                                       Project Cost :Rs.445 Crore
 
Andhra Pradesh Power Generation Corporation Limited Plans to set up a 100 MWp grid connected solar photovoltaic power project (in Plot No. P2 of Ananthapuramu−2 Solar Park) at Talaricheruvu village in Anantapur District, Andhra Pradesh on EPC basis.As of May 2017, Bids have been invited to appoint the Contractor to implement the project that includes design, engineering, manufacturing, testing of the plant
and Last Date of Submission is 26th May, 2017..   Visit : http://www.industrialdirectoryofindia.com/download 
35Power (Solar)                                                        Project Cost :Rs.2250 Crore
 
NLC India Ltd.. plans to set up an new Solar Power Generation unit in Kandapallibudhipadar, Jharsuguda district, Orissa. The project involves 500 MW electric power generation using solar energy....
As of May 2017, Project is in planning stage, The project has been approved recently by Odisha State Level Single Window Clearance Authority.   Visit : http://www.industrialdirectoryofindia.com/download 
36Mining                                                                         
 
The company plans for a new Limestone mine project in Tamil Nadu. As of May 2017,The Project waiting for necessary clearances .Visit : http://www.industrialdirectoryofindia.com/download. 
37Mining                                                                       Project Cost :Rs.66 Crore
 
The company plans to set up a Coal washery unit.....
As of May 2017, Pre-Project Activities are on  Visit http://www.industrialdirectoryofindia.com/download
38Mining                                                                Project Cost :Rs.10 Crore
 


The company plans for a Dolomite mining project.  As of May 2017,, the company is waiti0ng for necessary clearance.    Visit : http://www.industrialdirectoryofindia.com/download 
39Hospitality                                                             
 
Godrej Properties Limited in partner with Taj Hotels Palaces Resorts Safaris plans to construct a luxury hotel - The Trees having 150 Rooms at Vikhroli in Mumbai, Maharashtra...As of May 2017, Pre-Project Activities are on
Completion Period : by December, 2019.   Visit : http://www.industrialdirectoryofindia.com/download 
40Healthcare                                                           
 
Jharkhand State Building Construction Corporation. Ltd. Plans for construction of Community Health centre at Fatehpur in Jamtara District, JharkhandAs of May 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on. Completion Period : 31st January, 2019..
41Healthcare                                                            
 

Visakhapatnam Urban Development Authority plans for development of comprehensive Integrated World Class Tourism Museum space at Beach Road in Visakhapatnam District, Andhra Pradesh..As of May 2017, Bids have been invited to appoint the Contractor to implement the project and tendering process is on..  Visit : http://www.industrialdirectoryofindia.com/download 

42Real Estate                                                      

The company plans to develop Residential villas  at Fatorda in South Goa, Goa...                            As of May 2017, Pre-Project Activities are on..  Visithttp://www.industrialdirectoryofindia.com/download

43Real Estate                                                            
 

The company plans to develop a Residential Complex  at Vajreshwari Nagar in Pune, Maharashtra..     As of May 2017, Pre-Project Activities are on..  Visithttp://www.industrialdirectoryofindia.com/download

44Real Estate                                                     
 

The company plans to develop a Residential complex at Mahadevapura village in Bangalore, Karnataka. As of May 2017, Pre-Project Activities are on..

 Visithttp://www.industrialdirectoryofindia.com/download  

45Real Estate                                                           
 

The company plans to develop a Residential Complex at Behala in Kolkata, West Bengal.. 

As of May 2017, Pre-Project Activities are on... Visithttp://www.industrialdirectoryofindia.com/download

46Waste Treatment                                      Project Cost : Rs.115.92 Crore             
 

Municipal Corporation of Bhopal plans for sewerage network & sewage treatment for Kolar town & outside upper & lower lake catchment area part of South zone (Salaiya) & South, East zone (Jatkhedi & Misrod) in Madhya Pradesh....As of May 2017, Bids have been invited to appoint the Contractor to implement the project for which the last date for Submission is 15th May, 2017. Completion is targeted by July, 2019.  
47 Water Sector                                           
 
Nagpur Municipal Corporation plans for implementation of water supply scheme in Nagpur District, Maharashtra.
As of May 2017, Bids have been invited to appoint the Contractor to implement . the project and tendering process is on.. Visit : http://www.industrialdirectoryofindia.com/download 
48Waste Treatment                                                             
 
The Narol Dyestuff Enviro Society (CETP) plans for expansion of its Common Effluent Treatment Project in Narol in Ahmedabad, Gujarat. The project involves Expansion of Common Effluent Treatment Plant from 40 KL/Day to 450 KL/Day Treatment of Effluent From Various Industries..As of May, 2017, The Company is waiting for necessary Clearances. Visit : http://www.industrialdirectoryofindia.com/download
49Oil & Gas                                   
 
ONGC plans for laying underground oil and gas pipelines in Ankleshwar asset and Cambay asset in Gujarat...  
As of May 2017, Bids have been invited to appoint the Contractor Rate contract for laying and maintenance of underground oil and gas pipelines for a period of three years for which the last date for Submission is 9th June, 2017..   Visit : http://www.industrialdirectoryofindia.com/download
50Railways                                                       Project Cost : Rs.498.43 Crore  
 
Rail Vikas Nigam Ltd. plans for construction of roadbed, bridges (excluding Br. No. 53 & Br. No. 25) for execution of 3rd line project between Chakulia (excluding) and Adityapur (including) in Kharagpur and Chakradharpur divisions of South Eastern Railway in Jharkhand. (Package−II)...:As of May 2017, Bids have been invited to appoint the Contractor to implement the project for which the last date for Submission is 15th June, 2017.
51Roads,Highways & Bridges                                     Project Cost : Rs.314.41 Crore
 
Ministry of Road Transport and Highways plans for reconstruction with geometric improvement of existing single / intermediate lane to 2 lane of NH−109 in Uttarakhand on EPC mode under improvement to NH Connectivity to Chardham..As of May 2017, Bids have been invited to appoint the Contractor to implement the project for which the last date for Submission is 5th June, 2017.Visit  : http://www.industrialdirectoryofindia.com/download  

               For More Projects Enquiries

               (Over 400 New Project Enquiries 

      + Over 150 Projects Update Every Month)

                  in All Sectors                         


                    Visit :    http://www.industrialdirectoryofindia.com/download

*****************************************
            New Projects                       
      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   http://www.industrialdirectoryofindia.com/download 

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit :http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”    



May0717.jpg
Reply all
Reply to author
Forward
0 new messages