Coromandel Sugars Plans For 45 KLD Distillery with Power Plant...

621 views
Skip to first unread message

Industrial Directory Of India

unread,
Dec 2, 2011, 1:24:07 AM12/2/11
to industrialdir...@googlegroups.com
                       “New Projects This Week" 

                   RELEASED : ISSUE NOVEMBER 27 /11 

              Comprising  of  Total  62 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

    Coromandel Sugars Plans For 

 45 KLD Distillery with Power Plant

                                        

 ==================================

  (Update : Refer our Earlier Report Dtd. 24.06.2011)         

Coromandel Sugars Limited plans to set up  a 45 KLD Distillery along with  30 MW Co-Generation Power Plant in Mandya District, Karnataka. 

It will manufacture ENA (Extra Neutral Alcohol) / RS (Rectified Spirit).

 

Capacity :

Distillery                   : 45 KLD

Co-Gen Power Plant : 30 MW

(Bagasse/Coal Based)

 

The plant will run  : 300 Days/ Year.

 

Location : Village Mokavalli, K.R.Pet Taluk

                 Mandya District, Karnataka.

 

About Coromandel Sugar Limited :

Coromandel Sugars Limited  (formerly M/s ICL Sugar Limited) is an associate company of  India Cements Group. 

Coromandel Sugars Limited  is an existing Sugar Plant of 3500 TCD Capacity at Village Mokavalli, K.R.Pet Taluk  Mandya District, Karnataka. 

                    

As 0n  December 01, 2011 : The Project is under Planning Stage .

 

The unit would come up within the premises of its existing Sugar Plant of 3500 TCD Capacity at Village Mokavalli, K.R.Pet Taluk  Mandya District, Karnataka. 

 

IMPORTANT: As per the the discussion we had

on 24.11.2011 with Coromandel Sugars Limited

 the Project  is  under Panning Stage.

 

The company is waiting for the clearance from State Pollution Control

Authority.

 

The company is procuring some of the equipments from Germany and 

most of the  equipments will be procured locally (Indigenous).

The Civil work likely to  start from January,2012 .

 

The Project   is Scheduled to be  Completed in
18 months from the date of commencement, ie,

June, 2013.

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler    : 18 TPH   For Distillery Plant

(Spent Wash Fired Boiler)

(Incineration Boiler with 1.5 MW Turbo Generator)

Fuel :  479 Tons/ Day of Spent wash will be generated from Molasses based alchohol or 450 Tons/ Day from Malt Spirit will be  evaporated and concentrated spent wash will be burnt as  fuel in the boiler.

------------------------------------

Boiler    : 140 TPH For Co-Generation Plant

Fuel             : Bagasse/ Imported Coal

Quantity      : 1560 Ton/Day / 576 Ton/Day

Stack Height   : 89 Meter

 

Heat Exchanger, Air Pre- Heater/ Economiser

--------------------------------------------

Raw Materials :

Cane  Molasses /Maize  :   192 Tonnes/ Day.

Nutrients                            :   120 Kgs/ Day.

Antifoam Oil                      :   100 Kgs/ Day.

Sulphuric Acid                    :   100 Kgs/ Day.

--------------------------------------------

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

 

To control the particulate emissions from

Bagasse/ Imported Coal

will be controlled by ESP and emissions will be dispersed through Stack Height  of 
89 Meters.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

After Air Pre Heaters flue gases will pass through an Electro Static Precipitator where the Dust Particles will be  collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 50 mg/Nm3 through a Chimney of prescribed height.

The dust will be  collected from the bottom of the ESP.

 

High pressure superheated steam from boiler will pass through a Steam Turbine and at the lower pressure will go to the condenser.

The part of the steam will be extracted from the extraction points provided on the turbine, which will be used for distillery.

 

The condensed steam will return to the steam boiler as condensate and will again be boiled as steam.

 

While passing through the turbine, the high pressure and temperature steam will rotate the turbine rotor and an Electric Alternator mounted on the same shaft.

 

Electric power will be generated by the alternator. This electric power generated will be consumed in house i.e. for running the distillery and utilities like boilers auxiliaries etc. and surplus power will be exported to the state grid.

 

Manufacturing Process  Of Distillery

includes :

Fermentation plant

(Fermentor:12 Meter Height of Stack Co2 Scrubber)

Distillation plant

Evaporation plant

Molasses storage tanks

Alcohol storage tanks

Spent wash storage tanks 

------------------------------------------------------

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

 

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

-----------------------------------------------------------

DG set : 500 KVA  (1 No.) will be  installed for emergency power Back-up during power failure:

Stack : 13 Meters height of Stack with suitable acoustic

                   measures to be provided.

--------------------------------------------------------------

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work

 

WATER BALANCE FOR DISTILLERY PLANT

-----------------------------------------------------------

Raw Water : 450 M3/Day  + *Recycle Water : 450 M3/Day

DM Plant , Cooling Tower, Fermentation

 

Water Use :

    a.     DM Plant Make Up      :  100  m3/Day

   b.    Fermentation            :  410   m3/Day

   c.    Cooling Tower           :  377   m3/Day  

   d.    Domestic                  :     5   m3/Day

  e.    Wastage                 :        8  m3/Day

   ---------------------------------------------------------------------------------------

                                Total  900 m3/ Day

*Recycle Water : From Process Plant

 

WATER BALANCE FOR CO-GEN  PLANT

-----------------------------------------------------------

                        Raw Water : 900 M3/Day 

R.O. Plant

Capacity  :  240 M3/Day

 

Water Use :

    a.     R.O. Plant               :  410   m3/Day

       ( Boiler Make Up :  254 M3 + Regen & Rinset : 67 M3

       + Reject : 89 M3 =  410 m3/Day)

   2.    Cooling Tower       :  480m 3/Day

   3.    Wastage             :     10   m3/Day

   ---------------------------------------------------------------------------------------

                                Total  900 m3/ Day

 

WATER BALANCE FOR CO-GEN  PLANT

               (During Off Season)

-----------------------------------------------------------

                        Raw Water : 2400 M3/Day 

 

Water Use :

    a.     R.O. Plant               :   96   m3/Day

       ( Boiler Make Up :  36 M3 + Regen & Rinset : 39 M3

       + Reject : 21 M3 =  96 m3/Day)

   2.    Cooling Tower       :  2294 m3/Day

   3.    Wastage                 :     10   m3/Day

   ---------------------------------------------------------------------------------------

                                Total  2400 m3/ Day

 

 

Effluent Treatment Plant

 

WASTE  WATER REGENERATION & TREATMENT

-----------------------------------------------------------------

During  On Season

Boiler Make Up, Cooling Water Bleed Off,

R.O. & D.M Rejection  : 240M3/ Day

Sewage                       :  10M3/ Day          

During  off Season

Boiler Make Up, Cooling Water Bleed Off,

R.O. & D.M Rejection:  326M3/ Day

Sewage                       :  10M3/ Day          

 

The Raw Effluent will be collected  in a Collection Tank after passing through the Screen Chamber.

From this collection Tank Raw Effluent to be pumped to the Mixing Tank for netrilizing pH by addition of lime.

From this tank  to be passed to the Anaerobic by Two Stage  Aerobic and Clarifier.

 

 Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area 

and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Coromandel Sugars Limited

(An associate company of  India Cements Group)

Makavalli, K.R. PET.

Mandya District- 571 426, Karnataka. India

----------------------------------------------------------------

Tel  : +91- 8230 -260434

Fax : +91- 8230 -260456

Email : c...@indiacements.co.in

 

*****************************            

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

              

     Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  

http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

               with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

   

  