Update : Shree Rupanadham Steel Plans Major Expansion Of Steel Plant With CPP.,.,.,.

357 views
Skip to first unread message

Industrial Directory Of India

unread,
Feb 7, 2014, 2:27:01 AM2/7/14
to industrialdir...@googlegroups.com

                  “New Projects This Week" 

                   RELEASED : ISSUE FEBRUARY 02 /14 

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

    Shree Rupanadham Steel Plans For

Major Expansion Of Steel Plant With CPP

 ====================================

                      Ref  Our Earlier Report of 

                 03.05.2011  & 12.06.2013

====================================

                                      

Shree Rupanadham Steel Private Limited  plans for Major Expansion of  its Steel Plant that  involves increasing the capacity of TMT Bars / Structural Steels / Wire Rod Unit  from 4800 TPA to 94,800 TPA and MS Billets Unit  from 33,500 TPA  to 1,23,500 TPA and  setting up a New  90,000 TPA Sponge Iron Plant and a 18 MW Captive Power Plant at Saraipalli in Raigarh District, Chhattisgarh.

 

Capacity :

Expansion

 1.TMT Bars/Structural Steels/Wire Rod Unit:   

        From 4800 TPA To 94,800 TPA

 

2. MS Billets Unit:   

       From 33,500 TPA  to 1,23,500 TPA

New Unit

 1.Sponge Iron Plant: 90,000 TPA

 2. Captive Power Plant   : 18 MW

      a. WHRB    :  6MW

      b. FBC        :  12MW

 

Location :  

Saraipalli in Raigarh District, Chhattisgarh             

 

As on  February 07, 2014 : The Project is in planning stage.

 

The  expansion of the entire unit will  come  up on  company’s  existing

27.52 Acres of Land .

 

IMPORTANT: As per the discussion we had last  on 29.01.2014  with  of Shree Rupanadham Steel Private Limited,  the Project is still under planning stage.

 

The company has already obtained the  MoEF Clearance .

 

But the project is delayed due to shortage of Power Supply.


However, the project work is expected to start by Mid of 2015.

 

The Project   is Scheduled to be  Completed in 

One & Half  year from the date of  commencement of Project work.

*****************************

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

*****************************

The Main Scope of Supply includes:

Captive Power Plant  :

1.Waste Heat Recovery Boiler:

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate 6.0 MW electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (FBC) Boiler:

Total dolochar generated will be used in AFBC Boilers along with coal to generate

12 MW electricity. The flue-gases will be treated in high efficiency ESP and then discharged through stack into the atmosphere.

.

Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers.

 

3. Turbo Generators              : 2 Nos

    .

Steel Melting Shop: 

Induction Furnace : 15 Tons -2 Nos

There will be 2 nos. of induction furnaces of 15 MT each.

Concast will be used to produce Billets.

Initially scrap & other metallics such as Sponge Iron / Pig Iron will be charged into the Induction furnace. After scrap & other metallics are fully melted, the temperature of the melt reaches above 1600oC, then DRI / Pig Iron will be continuously charged into the furnace

 

SPONGE IRON (DRI) Unit

     Rotary Kilns : 3 Nos

Refractory lined rotary kilns will be used for reduction of Pellets in solid state.

A central Burnerlocated at the discharge end will be used for initial heating of the kiln.Pellets will be continuously fed into the kiln along with coal which has dual role of fuel as well as reductant. Dolomite will be added to scavenge the sulphur from the coal.

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filters

 

The plant shall be provided with Electrostatic Precipitators

having high efficiency (above 99.98%) for collection of the fly ash that would

be produced from the Process of coal combustion in Boiler Furnace.

An  Electro Static Precipitator would be provided for the cleaning / detarring of the Producer gas and the flue gases.

 

Coal from the coal yard will be crushed in a Crusher and conveyed to coal storage bunkers of Boilers through a system of Conveyor Belts, Crusher and Vibrating Screens and is fed to the furnace.

 

ESP, Dust Extraction systems for Conveyor Transfer Points, Crusher and Screen house with Hoods, Bag filter and Fans will be provided.

 

De-mineralised water from the storage tank will be pumped to the boiler with the

aid of Boiler Feed Pump. The boiler feed water through an Economizer will

the Steam drum and water walls where it is heated and converted to

saturated steam.

 

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

Cooling Tower

DG Sets (as stand by during Power Failure)

Air Conditioning Plant


Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance      for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the       dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a           dust     storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant :

Oxdisation Chamber, Filter, D.M. Plant

Pumps Valves, Custom Pipeline Work

The proposed project requires about 835 Cum/Day of water.

This includes Make-up water for DRI, SMS, Rolling Mill, Power plant and Domestic water.

Source Of Water : Under Ground water.

Details of Water Requirement

1.Cooling water Make-up for DRI plant   :   100 M3

2.Cooling water make-up for SMS           :    100 M3

3.Cooling water make-up for Rolling Mill :      25 M3

4. POWER PLANT                                    :   *500 M3

a.      Cooling Tower Make-up  (340 M3)

b.      Boilers make-up              (140 M3)

c.      D.M. plant regeneration    ( 20M3)

5. Domestic                                            :     10M3

---------------------------------------------------------------------------------------

                                             Total  835 M3

 

* Note: Air Cooled condensers are proposed to be adopted in the power plant instead of water cooled condensers with cooling towers.

 

Details of Waste Water Generation

Boiler Blowdown, Cooling Tower Blowdown & DM Plant regeneration will be the sources of effluent generation from the power plant.

 

 The following will be the total wastewater & it’s break-up:

 

1. POWER PLANT                                    

a.      Cooling Tower Make-up              : 75 M3

b.      Boilers make-up                        : 35 M3

c.      D.M. Pant Rgeneration                   :  20 M3

5. Domestic                                                :    8 M3

---------------------------------------------------------------------------------------

                                               Total  138 M3

 

Effluent  Treatment Plant:

pH of the boiler blowdown will be between 9.5 to 10.5.
Hence a neutralization tank to be constructed for neutralizing the Boiler Blow Down. DM plant Regeneration water will be neutralized in a neutralization tank. After neutralization these two effluent streams will be mixedwith Cooling Tower blowdown in a Central Monitoring Basin (CMB).

The treated effluent will be utilized for Dust Suppression, Ash conditioning and for Green belt development. No effluent will be let out of the plant premises. Hence Zero discharge concept will be implemented. Sanitary waste water will be treated in Septic tank followed by soak pit.

 

Other Equipments :

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.                     

 

9.0 Acres of Greenbelt will be Developed (inclusive of existing) as per CPCB guidelines. 15 m  wide greenbelt will be developed along the periphery of the plant.  and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :
 

Shree Rupanadham Steel Private Limited 

Saraipalli, Raigarh 496001,

Chhattisgarh, India.

-----------------------------------------------------

Tel        : +91-7762 –232274

Email    :  rupanadh...@yahoo.com


*****************************               

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

            Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

            http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

              with all Contact Details:

              Company's Name

              Address/ Phone/ Fax

              Contact person's Name

              E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                


Feb0214.jpg
Reply all
Reply to author
Forward
0 new messages