Avadh Sugar Plans for expansion ot its Distillery from 100 KLD to 150 KLD with Co-Gen Power Plant from 3.0 MW to 6.5 MW

717 views
Skip to first unread message

Industrial Directory Of India

unread,
Mar 11, 2019, 11:55:31 AM3/11/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE MARCH 03/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Avadh Sugar Plans for expansion ot its 

Distillery from 100 KLD to 150 KLD  

with Co-Gen Power Plant from 3.0 MW to 6.5 MW

          

Avadh Sugar & Energy Limited  plans for expansion of its  Molasses based Distillery

from 100 KLD to 150 KLD (AA/ENA/Ethanol) and   Co-Generation Power Plant from 3.0 MW to 6.5 MW  at Hargaon, Block and District Sitapur, Uttar Pradesh

 
Capacity :

Distillery     from 100  KLD to 150 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : From 3.0 MW to 6.5 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.80 Crores

 

 Location : Village Surjipara, Hargaon, Block and District Sitapur, Uttar Pradesh

                    

As on  March 11, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  50 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 06.03.2019 with Avadh Sugar & Energy Limited

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 


The Project   is Scheduled to be  Completed in

12-18 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 50 TPH - 1 No.

Fuel (as avialable)  Bagasse $ Slop 


Fuel Consumption  :  Bagasse       :  100 TPD /

                                   Slop            : 320 m3/hr/

 (Existing Boiler :30 IPH)                                  

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitatorsr

 

To control the particulate emissions from Coal  Fired boiler will be controlled by Bag Filter and emissions will be dispersed through Stack of suitable Height.  .

 

Steam generated from the boilers and will be utilized in the generation of additional 

3.5 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.


************************************************************************ 

Steam turbine 

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set :

will be  installed for emergency power Back-up during power failure.

    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

1050 KLD will be sourced from and same will be met from the Doodhganga River..

 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Avadh Sugar & Energy Limited

(Hargaon Distillery) 

P.O. Hargaon Sitapur- 261121, Uttar Pradesh, India

-----------------------------

Tel : +91-5862-256220 

Email : avadhs...@gmail.com

 

*****************************

            New Projects

                    

      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                  Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

         http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

        “NEW PROJECTS THIS WEEK”

Industrial Directory Of India

unread,
Mar 18, 2019, 9:26:57 AM3/18/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
           "New Projects This Week" 

                   RELEASED : ISSUE MARCH 10/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Shri Gang Industries & Allied Products Plans 

55 KLD Distillery & 2 MW Co-Generation Plant..

          

Shri Gang Industries And Allied Products Limited plans to set up a New 55 KLD (55 KLPD ENA & 3 KLPD TECHNICAL SPIRITS) Grain based Distillery along with a 2 MW Bagasse based Co-Generation Power Plant at UPSIDC Industrial Area, Sikandrabad in Bulandshahr District, Uttar Pradesh.
 
Capacity :

Distillery     55 KLD (55 KLPD ENA & 3 KLPD TECHNICAL SPIRITS)

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 2 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.90 Crores

 

 Location : UPSIDC Industrial Area, Sikandrabad in Bulandshahr District, Uttar Pradesh

                    

As on  March 18, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  60 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 15.03.2019 with Shri Gang Industries And Allied Products Limited

the Project  is  under Panning Stage.

 

TEnvironment Clerance is in place. 

The Project Work is likely to start by March/April, 2019. 


The Project   is Scheduled to be  Completed in

12-15 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 20 TPH - 1 No.

Steam consumption for the process and boiler de-aeration is 16.50 TPH, will be sourced from Boiler ;  

Fuel  (Fuel :Bagasse/ Coal/Rice Husk Fired)

Heat Exchanger, Air Pre-Heater/ Economiser

=============================== 

 Air Pollution Control Equipment :

Electrostatic Precipitator will be installed with the proposed boiler. Adequate boiler stack height 

will be provided.  .

 

Steam generated from the boilers and will be utilized in the generation of additional 

2 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.


************************************************************************ 

Steam turbine 

TURBINE  GENERATOR : .2 MW- 1 No.  

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set500 KVA  : 1 No. 

will be  installed for emergency power Back-up during power failure.

    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

otal requirement of water for the distillery based on Continuous fermentation, multi pressure vacuum distillation with integrated evaporation, standalone evaporation system to concentrated spent wash  

1370 KLD 

(Process : 500 m3/day+ Soft Water  : 70 m3/day + DM Water : 500 m3/day + Cooling : 300 m3/day ]  DM &  Soft water Plant)

 

 ************************************ 

Effluent Treatment Plant :

 Effluent Treatment Plant :

The proposed grain based distillery would be based on “Zero Liquid Discharge” (ZLD). Spent wash will be treated in MEE (Multiple Effect Evaporator), than the semisolid waste from MEE (Multiple Effect Evaporator) will be sent in specially designed boiler for incineration. Condensate will be treated in condensate polishing unit and will used as water in cooling tower..


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Shri Gang Industries And Allied Products Limited

F-32/3, Second Floor, Okhla Industrial Area, Phase-II, 

New Delhi - 110020, Delhi, India

-----------------------------

Tel : +91-11-42524454 

Email : secre...@shrigangindustries.com 

Website : www.shrigangindustries.com

Industrial Directory Of India

unread,
May 22, 2019, 7:59:18 AM5/22/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
           "New Projects This Week" 

                   RELEASED : ISSUE May 19/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Orange Distillery & Beverages Plans 

120 KLD Distillery & 4MW Co-Generation Plant..

================================== === =============

First info : June 2018  Update : December 2018

================================== === =============            

Shri Orange Distillery & Beverages Pvt. Ltd. plans to set up a New 120 KLD Molasses/ Grain based Distillery along with a 4 MW Bagasse based Co-Generation Power Plant at Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh. 
Capacity :

Distillery     120 KLD 

=====================

Co-Generation Power Plant  : 4 MW

=====================

Total Working Days in a year350 days

Project Cost : Rs.178.58 Crores

 

 Location : Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh. 

                    

As on  May 21, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  7.0246 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 15.05.2019 with Shri Orange Distillery & Beverages Pvt. Ltd.

the Project  is  under Panning Stage.

 

The company is waiting for Environment Clearance . 

The Project   is Scheduled to be  Completed in

18 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 20 TPH - 1 No.(Fuel : Bagasse )

Boiler        : 35 TPH - 1 No.   (Incineration Boiler)

Steam consumption for the process is 34 TPH for Molasses/ 36 TPH for Grain Based Unit will be sourced from Boiler ;  

Fuel  (Fuel :Bagasse Fired)

Heat Exchanger, Air Pre-Heater/ Economiser

=============================== 

 Air Pollution Control Equipment :

Electrostatic Precipitator will be installed with the proposed boiler. Adequate boiler stack height 

will be provided.  .

 

Steam generated from the boilers and will be utilized in the generation of additional 

4 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.


************************************************************************ 

Steam turbine 

TURBINE  GENERATOR : .4 MW- 1 No.  

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set500 KVA  : 1 No. 

will be  installed for emergency power Back-up during power failure.

    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

otal requirement of water for the distillery based on Continuous fermentation, multi pressure vacuum distillation with integrated evaporation, standalone evaporation system to concentrated spent wash  

996 m3/Day (For Molasses based Unit) and / 900 m3/Day  (For Grain based Unit)

 ************************************ 

Effluent Treatment Plant :

 Effluent Treatment Plant :

The proposed grain based distillery would be based on “Zero Liquid Discharge” (ZLD). Spent wash will be treated in MEE (Multiple Effect Evaporator), than the semisolid waste from MEE (Multiple Effect Evaporator) will be sent in specially designed boiler for incineration. Condensate will be treated in condensate polishing unit and will used as water in cooling tower..


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.

Total Effluent :

900 KLD (For Molasses based Unit) and / 816 KLD  (For Grain based Unit)  


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Shri Orange Distillery & Beverages Pvt. Ltd.  

Village: Fatehpur Roshnai, Roshnai, 

Tehsil - Akbarpur, District – Kanpur Dehat, Uttar Pradesh. India  

-----------------------------

Mob : 09670111159 Email : amit.na...@gmail.com   

Industrial Directory Of India

unread,
Jun 4, 2019, 9:56:54 AM6/4/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE JUNE 02/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Indian Potash Ltd. Plans to set a 

60 KLD Distillery and Co-Gen Power Plant of 2.5 MW 

          

Indian Potash Limited  plans for a  Molasses based Distillery of 

60 KLD to 150 KLD (AA/ENA/Ethanol) and   Co-Generation Power Plant of 2.5 MW 

at Khadda in Kushinagar District, Uttar Pradesh..
 
Capacity :

Distillery     60 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 2.5 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.103.80 Crores 

 Location :  Khadda in Kushinagar District, Uttar Pradesh.  

===============================                  

As on  June 04, 2019 : The Project is under Planning Stage. 

 

The Total Project Area   27.7240 Hectare .


Out of this about 33% of the area will be developed as Green Belt.

******************************************************** 

IMPORTANT: As per the the discussion we had

on 27.05.2019 with Indian Potash Limited

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 


The Project   is Scheduled to be  Completed in

18-24 Months from the date of commencement of the project work.

 =======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 25 TPH - 1 No.

Fuel (as available)  Bagasse & Slop 


Fuel Consumption  :  Bagasse       :  170 TPD /

                                   Slop            :     84 m3/hr                       

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitator

To control the particulate emissions from Coal  Fired boiler will be controlled by Electrostatic Precipitator and emissions will be dispersed through Stack of 60 Meter.  .

 

Steam generated from the boilers and will be utilized in the generation of additional 

2.5 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

************************************************************************ 

Steam turbine :  2.5 MW

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 DG set :

will be  installed for emergency power Back-up during power failure.    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

380 KLD will be sourced from and same will be met from Borewell..

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Industrial Use                        : 360  M3/Day..............

---------------------------------------------------------------------------------------

                       Total:  380 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 :15 M3/Day

2.Industrial Use                        : 405  M3/Day..............

---------------------------------------------------------------------------------------

                              Total:  420 M3/ Day

   ******************************************************** 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at : 

Indian Potash Limited   

Unit: Khadda, P.O. Rajabazar, Kushinagar - 274802, Uttar Pradesh, India

-----------------------------

Tel: +91-5563-285023Email: iplk...@rediffmail.com

Website: www.indianpotash.org    

=================================

H.O. Tel : +91-44-28297855, 28297869, 28297857, 28297327,  Email : ip...@potindia.com  www.indianpotash.org   

Industrial Directory Of India

unread,
Jun 11, 2019, 12:00:57 PM6/11/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE JUNE 09/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Avadh Sugar Plans for expansion ot its 

Distillery from 100 KLD to 150 KLD  

with Co-Gen Power Plant from 3.0 MW to 6.5 MW

===============================================
First Info : February 2019
===============================================            
Avadh Sugar & Energy Limited  plans for expansion of its  Molasses based Distillery

from 100 KLD to 150 KLD (AA/ENA/Ethanol) and   Co-Generation Power Plant from 3.0 MW to 6.5 MW  at Hargaon, Block and District Sitapur, Uttar Pradesh

 
Capacity :

Distillery     from 100  KLD to 150 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : From 3.0 MW to 6.5 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.80 Crores

 

 Location : Village Surjipara, Hargaon, Block and District Sitapur, Uttar Pradesh

                    

As on  June 11, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  50 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 06.06.2019 with Avadh Sugar & Energy Limited

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 

The Project Work is likely to start in H2 of 2019.

Industrial Directory Of India

unread,
Jun 27, 2019, 11:00:28 PM6/27/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE JUNE 23/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

Chhatrapati Sahakari Sakhar Karkhana Ltd. Plans to set a 

45 KLD Molasses Based Distillery  

          

Chhatrapati Sahakari Sakhar Karkhana Ltd. plans for a  Molasses based Distillery of 

45 KLD  at Sonajinagar, Sawargaon Tq. Majalgaon in Beed District, Maharashtra.  ..

 
Capacity :

Distillery     45 KLD

(AA/ENA/Ethanol) 

=====================

Total Working Days in a year330 days

Project Cost : Rs.72.73 Crores 

 Location :  Sonajinagar, Sawargaon Tq. Majalgaon in Beed District, Maharashtra.  ..

  ===============================                  

As on  June 28, 2019 : The Project is under Planning Stage. 

 

The company has 93 acres of land out of which approx. 11 acres of land is built-up area for existing sugar factory and other sub unit. Approx 5 acre is for the proposed units and ancillary units thereof such as boiler house, distillery plant, godown etc. The greenbelt area is proposed 2 acre.

******************************************************** 

IMPORTANT: As per the the discussion we had

on 24.06.2019 with Chhatrapati Sahakari Sakhar Karkhana Ltd.

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 


The Project   is Scheduled to be  Completed in

12-18 Months from the date of commencement of the project work.

 =======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 15 TPH - 1 No.

incineration boiler)  

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitator

Incineration boiler of capacity 15 TPH with 65 m stack will be used in proposed distillery unitr..

 ************************************************************************ 

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 DG set :125 KVA  : 1 No. (New)

will be  installed for emergency power Back-up during power failure.    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

410 KLD will be sourced from and same will be met from from Majalgaon dam

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Industrial Use                        :390  M3/Day..............

---------------------------------------------------------------------------------------

                       Total:  410 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 :15 M3/Day

2.Industrial Use                        : 585  M3/Day..............

---------------------------------------------------------------------------------------

                              Total:  600 M3/ Day

   ******************************************************** 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 2 Acre area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at : 

Chhatrapati Sahakari Sakhar Karkhana Ltd.  

Sonajinaga, Sawargaon, Post: Mangrul No.1 Tq. Majalgaon Beed - 143113, Maharashtra, India

-----------------------------

Tel  : +91-244-247600, Fax: +91-244-24700 Email: chhatrapati...@gmail.com

Industrial Directory Of India

unread,
Jul 1, 2019, 1:48:13 AM7/1/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE JUNE 30/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

   Naglamal Sugar Plans for expansion ot its 

Distillery from 120 KLD to 150 KLD  

and also to set up a Co-Generation Power Plant of  8.0 MW

===============================================
Naglamal Sugar Complex,  plans for expansion of its  Molasses based Distillery

from 120 KLD to 150 KLD (AA/ENA/Ethanol) and to set up a new   Co-Generation Power Plant of 8.0 MW  at village: Naglamal, Tehsil: Sadar, District: Meerut in Uttar Pradesh...

 
Capacity :

Distillery     from 120  KLD to 150 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 8.0 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.40 Crores

 

 Location : Village: Naglamal, Tehsil: Sadar, District: Meerut in Uttar Pradesh...

                    

As on  July 01, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  22.26 Ha of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 28.06.2019 with Naglamal Sugar Complex

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 

The Project Work is likely to start in H2 of 2019.


The Project   is Scheduled to be  Completed in

12-18 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 50 TPH - 1 No.

Fuel (as avialable)  Bagasse / Slop 

The total steam consumed at the project will be around 47.0 TPH 

for distillery process and rest for Co ration Power Plant

Fuel Consumption  :  Bagasse       :  180 TPD /

                                   Slop            : 432 KLD/                          

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitatorsr

 

To control the particulate emissions from Coal  Fired boiler will be controlled by Bag Filter and emissions will be dispersed through Stack of suitable Height.  .

 

Steam generated from the boilers and will be utilized in the generation of 

8.0 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.


************************************************************************ 

Steam turbine : 8.0 MW

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set : 500 KVA - 1 No. & 1000 KVA - 1 No.

will be  installed for emergency power Back-up during power failure.

    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

3375 KLD will be sourced from and same will be met from the ground water..

 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


Waste Water Generation : 1080 KLD

All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 Naglamal Sugar Complex  

(A Unit of Mawana Sugar Ltd.  Mawana Sugars Limited)

5th Floor, Kirti Mahal 19 Rajendra Place,

New Delhi - 110125, Delhi, India  

 -------------------------------------------------….

Tel  : +91-11-25739103 Fax: +91-11-25743659

Email :corp...@mawanasugars.com 

Website : www.mawanasugars.com

Industrial Directory Of India

unread,
Jul 8, 2019, 12:12:11 AM7/8/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE JULY 07/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

   Kesar Enterprises Plans for expansion of its 

Distillery from 45 KLD to 125 KLD  

and also to set up a Co-Generation Power Plant of  4.0 MW

===============================================
Kesar Enterprises Limited,  plans for expansion of its  Molasses based Distillery

from 45 KLD to 125 KLD (AA/ENA/Ethanol) and to set up a new   Co-Generation Power Plant of 4.0 MW  at Baheri in Bareilly, Uttar Pradesh....

 
Capacity :

Distillery     From 45  KLD to 125 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 4.0 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.98.50 Crores

 

 Location :  Baheri in Bareilly, Uttar Pradesh....

                    

As on  July 08, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  20.831 Ha of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 30.06.2019 with Kesar Enterprise Limited

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 

The Project   is Scheduled to be  Completed in

12-18 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 27 TPH - 1 No.

Boiler        : 12 TPH - 1 No.  

Fuel (as avialable)  Bagasse / Slop 

The total steam consumed at the project will be around 32 TPH 

for distillery process and rest for Co ration Power Plant

Fuel Consumption  :  Bagasse       :  100 TPD /

                                   Slop            : 270 KLD/                          

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitator

 

To control the particulate emissions from Coal  Fired boiler will be controlled by Electrostatic Precipitator and emissions will be dispersed through Stack of suitable Height. 63 meter stack shall be installed with 27 TPH Boiler & 45 meter stack shall be installed with 12 TPH Boiler 

Steam generated from the boilers and will be utilized in the generation of 

4.0 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.


************************************************************************ 

Steam turbine : 4.0 MW

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set : 500 KVA - 1 No. 

will be  installed for emergency power Back-up during power failure.

    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

770 m3/Day will be sourced from and same will be met from the ground water..

( Industrial : 750 m3/Day & Domestic : 20 m3/Day) 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


Waste Water Generation : 750 KLD

All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

Kesar Enterprises Limited  

Orient House, 6th  Floor, 7 Jamshedji Tata Road, Churchgate

Mumbai- 400020, India  

 -------------------------------------------------….

Tel : +91-22-22851737 Fax : +91-22-22876162

Email :  heado...@kesarindia.com  Website : www.kesarindia.com

Industrial Directory Of India

unread,
Aug 14, 2019, 5:34:03 AM8/14/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE AUGUST 04/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

   United Provinces Sugar Company Plans to set a 

110 KLD Distillery and Co-Gen Power Plant of 4.0 MW 

          

United Sugar Provinces Sugar Company Limited  plans for a  Molasses based Distillery of 

110 KLD and   Co-Generation Power Plant of 4.0 MW 

at Village Sewrahi, Tehsil Tamakuhi Raj in Kushinagar District, Uttar Pradesh.
 
Capacity :

Distillery     110 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 4.0 MW

=====================

Total Working Days in a year350 days

Project Cost : Rs.135 Crores 

 Location :  Village Sewrahi, Tehsil Tamakuhi Raj in Kushinagar District, Uttar Pradesh..  

===============================                  

As on  August 14, 2019 : The Project is under Planning Stage. 

 

The Total Project Area   12.0387 Acres (4.8720 Hectare )


Out of this about 33% of the area will be developed as Green Belt.

******************************************************** 

IMPORTANT: As per the the discussion we had

on 09.08.2019 with United Sugar Province Sugar Company Ltd.

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 


The Project   is Scheduled to be  Completed in

18-24 Months from the date of commencement of the project work.

 =======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 35 TPH - 1 No.

Fuel (as available)  Bagasse & Slop                     

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitator

To control the particulate emissions from Coal  Fired boiler will be controlled by Electrostatic Precipitator and emissions will be dispersed through Stack  .

 Steam generated from the boilers and will be utilized in the generation of additional 

4.0 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

************************************************************************ 

Steam turbine :  4.0 MW

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 DG set : 1000 KVA & 1500 KVA

will be  installed for emergency power Back-up during power failure.    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

872 m3/Day will be sourced from and same will be met from Borewell..

The water requirement for the first run for project would be 2850 m3/Day, which will be further reduced through recycling to 1978  m3/Day  . Hence, fresh water requirement is 872  m3/Day  .

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Industrial Use                        : 852  M3/Day..............

---------------------------------------------------------------------------------------

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at : 

The United Sugar Provinces Sugar Company Limited     

401/405, Jolly Bhavan No. 1, 10, New Marine Lines,

Mumbai - 400020, Maharashtra, India

 -------------------------------------------------….

Tel: +91-22-22003231/4325 Fax : +91-22-2206 0745

Email: upscl...@rediffmail.com/ upscl...@mtnl.net.in Website: www.unitedprovincessugar.com  

Industrial Directory Of India

unread,
Aug 18, 2019, 1:13:16 PM8/18/19
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

  Released
           "New Projects This Week" 

                   RELEASED : ISSUE AUGUST 11/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Orange Distillery & Beverages Plans 

120 KLD Distillery & 4MW Co-Generation Plant..

================================== === =============

First info : June 2018  Update : December 2018  & May 2019

================================== === =============            

Shri Orange Distillery & Beverages Pvt. Ltd. plans to set up a New 120 KLD Molasses/ Grain based Distillery along with a 4 MW Bagasse based Co-Generation Power Plant at Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh. 
Capacity :

Distillery     120 KLD 

=====================

Co-Generation Power Plant  : 4 MW

=====================

Total Working Days in a year350 days

Project Cost : Rs.178.58 Crores

 

 Location : Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh. 

                    

As on  August 16, 2019 : The Project is under Planning Stage. 

 

The expansion would come up in its existing  7.0246 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

********************************************************

 

IMPORTANT: As per the the discussion we had

on 12.08.2019 with Shri Orange Distillery & Beverages Pvt. Ltd.

the Project  is  under Panning Stage.

 

Project Work is yet to start . 

Industrial Directory Of India

unread,
Nov 2, 2019, 2:55:33 AM11/2/19
to industrialdir...@googlegroups.com
  Industrial Directory of India.Com 

  Released
              "New Projects This Week" 

                   RELEASED : ISSUE OCTOBER 26/19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

   (Helpline : +91-900 7158 600/ 900 7742 600)       


                     New Project 

     Rajshree Fine Chemical Industries Plans to set a 

160 KLD Distillery and Co-Gen Power Plant of 5 MW 

          

Rajshree Fine Chemicals Industries Pvt. Ltd.  plans for a  Molasses based Distillery of 

80 KLD and Grain  based Distillery of  a 80 KLD  along with a   Co-Generation Power Plant of      5 MW at Shalpur Navadiya in Shahjahanpur District, Uttar Pradesh.

 
Capacity :

Distillery     80 KLD + 80 KLD

(AA/ENA/Ethanol) 

=====================

Co-Generation Power Plant  : 5.0 MW

=====================

Total Working Days in a year330 days

Project Cost : Rs.146.59 Crores 

 Location :  Vill : Shalpur Navadiya in Shahjahanpur District, Uttar Pradesh. 

===============================                  

As on  November 02, 2019 : The Project is under Planning Stage. 

 

The Total Project Area   9.856 Hectare .


Out of this about 33% of the area will be developed as Green Belt.

******************************************************** 

IMPORTANT: As per the the discussion we had

on 24.10.2019 with Rajshree Fine Chemicals Industries Private Limited

the Project  is  under Panning Stage.

 

The company is now waiting for Environmental clearances . 


The Project   is Scheduled to be  Completed in

18-24 Months from the date of commencement of the project work.

 =======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 40 TPH - 1 No.

Fuel (as available)  Bagasse & Slop 


Fuel Consumption  :  Bagasse       :  192 TPD /

                                   Slop            :     240 KLD                       

Heat Exchanger, Air Pre-Heater/ Economiser

===============================

 Raw Materials :

  Molasses & Grain :            

===============================     

 Air Pollution Control Equipment :

Electrostatic Precipitator

To control the particulate emissions from Coal  Fired boiler will be controlled by Electrostatic Precipitator and emissions will be dispersed through Stack of 60 Meter.  .

 

Steam generated from the boilers and will be utilized in the generation of additional 

5 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

************************************************************************ 

Steam turbine :  5 MW

with Step down transformer & synchronization Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 DG set :

will be  installed for emergency power Back-up during power failure.    

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

944 m3/Day will be sourced from and same will be met from Borewell..

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Industrial Use                        : 924  M3/Day..............

---------------------------------------------------------------------------------------

                       Total:  944 m3/ Day

 Details of Waste Water Discharge

1.Domestic                                 :16 KLD

2.Industrial Use                        : 624  KLD..............

---------------------------------------------------------------------------------------

                              Total:  640 KLD

   ******************************************************** 

 ************************************ 

Effluent Treatment Plant :

 The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down. 


All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section. 


The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.


Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting. 


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at : 

Rajshree Fine Chemicals Industries Pvt. Ltd.   

11, Utkarsh Mahanagar Phase - I, Bareilly - 243006, Uttar Pradesh, India

-------------------------------------------------….

Mob: 08395833333

--------------------------------------------------------

Consultant Vapco Engineers Private Limited, A-1108, Mahaavir Icon, Plot No.89, Sector-15, CBD Belapur, Navi Mumbai, Thane 400614, Maharashtra, India  

Mob: 09136439711  Tel: +91-22-49746151. Email: sa...@vapcoengineers.com www.vapcoengineers.com 