New Project |
Avadh Sugar Plans for expansion ot its
Avadh Sugar & Energy Limited plans for expansion of its Molasses based Distilleryfrom 100 KLD to 150 KLD (AA/ENA/Ethanol) and Co-Generation Power Plant from 3.0 MW to 6.5 MW at Hargaon, Block and District Sitapur, Uttar Pradesh
Distillery : from 100 KLD to 150 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : From 3.0 MW to 6.5 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.80 Crores
Location : Village Surjipara, Hargaon, Block and District Sitapur, Uttar Pradesh
As on March 11, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 50 Acres of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 06.03.2019 with Avadh Sugar & Energy Limited
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
12-18 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 50 TPH - 1 No.
Fuel (as avialable) : Bagasse $ Slop
Fuel Consumption : Bagasse : 100 TPD /
Slop : 320 m3/hr/
(Existing Boiler :30 IPH)
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitatorsr
To control the particulate emissions from Coal Fired boiler will be controlled by Bag Filter and emissions will be dispersed through Stack of suitable Height. .
Steam generated from the boilers and will be utilized in the generation of additional
3.5 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set :
will be installed
for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
1050 KLD will be sourced from and same will be met from the Doodhganga River..
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Avadh Sugar & Energy Limited
(Hargaon Distillery)
P.O. Hargaon Sitapur- 261121, Uttar Pradesh, India
-----------------------------
Tel : +91-5862-256220
Email : avadhs...@gmail.com
*****************************
New Projects |
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”Released |
RELEASED : ISSUE MARCH 10/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Shri Gang Industries & Allied Products Plans
55 KLD Distillery & 2 MW Co-Generation Plant..
Shri Gang Industries And Allied Products Limited plans to set up a New 55 KLD (55 KLPD ENA & 3 KLPD TECHNICAL SPIRITS) Grain based Distillery along with a 2 MW Bagasse based Co-Generation Power Plant at UPSIDC Industrial Area, Sikandrabad in Bulandshahr District, Uttar Pradesh.
Distillery : 55 KLD (55 KLPD ENA & 3 KLPD TECHNICAL SPIRITS)
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 2 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.90 Crores
Location : UPSIDC Industrial Area, Sikandrabad in Bulandshahr District, Uttar Pradesh
As on March 18, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 60 Acres of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 15.03.2019 with Shri Gang Industries And Allied Products Limited
the Project is under Panning Stage.
TEnvironment Clerance is in place.
The Project Work is likely to start by March/April, 2019.
The Project is
Scheduled to be Completed in
12-15 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 20 TPH - 1 No.
Steam consumption for the process and boiler de-aeration is 16.50 TPH, will be sourced from Boiler ;
Fuel (Fuel :Bagasse/ Coal/Rice Husk Fired)
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator will be installed with the proposed boiler. Adequate boiler stack height
will be provided. .
Steam generated from the boilers and will be utilized in the generation of additional
2 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine
TURBINE GENERATOR : .2 MW- 1 No.
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set : 500 KVA : 1 No.
will be installed
for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
otal requirement of water for the distillery based on Continuous fermentation, multi pressure vacuum distillation with integrated evaporation, standalone evaporation system to concentrated spent wash
1370 KLD
(Process : 500 m3/day+ Soft Water : 70 m3/day + DM Water : 500 m3/day + Cooling : 300 m3/day ] DM & Soft water Plant)
************************************
Effluent Treatment Plant :
Effluent Treatment Plant :
The proposed grain based distillery would be based on “Zero Liquid Discharge” (ZLD). Spent wash will be treated in MEE (Multiple Effect Evaporator), than the semisolid waste from MEE (Multiple Effect Evaporator) will be sent in specially designed boiler for incineration. Condensate will be treated in condensate polishing unit and will used as water in cooling tower..
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
F-32/3, Second Floor, Okhla Industrial Area, Phase-II,
New Delhi - 110020, Delhi, India
-----------------------------
Tel : +91-11-42524454
Email : secre...@shrigangindustries.com
Website : www.shrigangindustries.com
Released |
RELEASED : ISSUE May 19/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Orange Distillery & Beverages Plans
120 KLD Distillery & 4MW Co-Generation Plant..
================================== === =============
First info : June 2018 Update : December 2018
================================== === =============
Shri Orange Distillery & Beverages Pvt. Ltd. plans to set up a New 120 KLD Molasses/ Grain based Distillery along with a 4 MW Bagasse based Co-Generation Power Plant at Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh.
Distillery : 120 KLD
=====================
Co-Generation Power Plant : 4 MW
=====================
Total Working Days in a year : 350 days
Project Cost : Rs.178.58 Crores
Location : Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh.
As on May 21, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 7.0246 Acres of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 15.05.2019 with Shri Orange Distillery & Beverages Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting for Environment Clearance .
The Project is
Scheduled to be Completed in
18 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 20 TPH - 1 No.(Fuel : Bagasse )
Boiler : 35 TPH - 1 No. (Incineration Boiler)
Steam consumption for the process is 34 TPH for Molasses/ 36 TPH for Grain Based Unit , will be sourced from Boiler ;
Fuel (Fuel :Bagasse Fired)
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator will be installed with the proposed boiler. Adequate boiler stack height
will be provided. .
Steam generated from the boilers and will be utilized in the generation of additional
4 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine
TURBINE GENERATOR : .4 MW- 1 No.
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set : 500 KVA : 1 No.
will be installed
for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
otal requirement of water for the distillery based on Continuous fermentation, multi pressure vacuum distillation with integrated evaporation, standalone evaporation system to concentrated spent wash
996 m3/Day (For Molasses based Unit) and / 900 m3/Day (For Grain based Unit)
************************************
Effluent Treatment Plant :
Effluent Treatment Plant :
The proposed grain based distillery would be based on “Zero Liquid Discharge” (ZLD). Spent wash will be treated in MEE (Multiple Effect Evaporator), than the semisolid waste from MEE (Multiple Effect Evaporator) will be sent in specially designed boiler for incineration. Condensate will be treated in condensate polishing unit and will used as water in cooling tower..
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
Total Effluent :
900 KLD (For Molasses based Unit) and / 816 KLD (For Grain based Unit)
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Village: Fatehpur Roshnai, Roshnai,
Tehsil - Akbarpur, District – Kanpur Dehat, Uttar Pradesh. India
-----------------------------
Mob : 09670111159 Email : amit.na...@gmail.com
Released |
RELEASED : ISSUE JUNE 02/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Indian Potash Ltd. Plans to set a
Indian Potash Limited plans for a Molasses based Distillery of60 KLD to 150 KLD (AA/ENA/Ethanol) and Co-Generation Power Plant of 2.5 MW
at Khadda in Kushinagar District, Uttar Pradesh..
Distillery : 60 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 2.5 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.103.80 Crores
Location : Khadda in Kushinagar District, Uttar Pradesh.
===============================
As on June 04, 2019 : The Project is under Planning Stage.
The Total Project Area 27.7240 Hectare .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 27.05.2019 with Indian Potash Limited
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
18-24 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 25 TPH - 1 No.
Fuel (as available) : Bagasse & Slop
Fuel Consumption : Bagasse : 170 TPD /
Slop : 84 m3/hr
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator
To control the particulate
emissions from Coal Fired boiler will be controlled by Electrostatic Precipitator and
emissions will be dispersed through Stack of 60 Meter. .
Steam generated from the boilers and will be utilized in the generation of additional
2.5 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine : 2.5 MW
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set :
will be installed for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
380 KLD will be sourced from and same will be met from Borewell..
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Industrial Use : 360 M3/Day..............
---------------------------------------------------------------------------------------
Total: 380 M3/ Day
Details of Waste Water Discharge
1.Domestic :15 M3/Day
2.Industrial Use : 405 M3/Day..............
---------------------------------------------------------------------------------------
Total: 420 M3/ Day
********************************************************
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Unit: Khadda, P.O. Rajabazar, Kushinagar - 274802, Uttar Pradesh, India
-----------------------------
Tel: +91-5563-285023. Email: iplk...@rediffmail.com
Website:
www.indianpotash.org
=================================
H.O. Tel : +91-44-28297855, 28297869, 28297857, 28297327, Email : ip...@potindia.com www.indianpotash.org
Released |
RELEASED : ISSUE JUNE 09/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Avadh Sugar Plans for expansion ot its
Avadh Sugar & Energy Limited plans for expansion of its Molasses based Distilleryfrom 100 KLD to 150 KLD (AA/ENA/Ethanol) and Co-Generation Power Plant from 3.0 MW to 6.5 MW at Hargaon, Block and District Sitapur, Uttar Pradesh
Distillery : from 100 KLD to 150 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : From 3.0 MW to 6.5 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.80 Crores
Location : Village Surjipara, Hargaon, Block and District Sitapur, Uttar Pradesh
As on June 11, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 50 Acres of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 06.06.2019 with Avadh Sugar & Energy Limited
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project Work is likely to start in H2 of 2019.
Released |
RELEASED : ISSUE JUNE 23/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Chhatrapati Sahakari Sakhar Karkhana Ltd. Plans to set a
Chhatrapati Sahakari Sakhar Karkhana Ltd. plans for a Molasses based Distillery of45 KLD at Sonajinagar, Sawargaon Tq. Majalgaon in Beed District, Maharashtra. ..
Distillery : 45 KLD
(AA/ENA/Ethanol)
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.72.73 Crores
Location : Sonajinagar, Sawargaon Tq. Majalgaon in Beed District, Maharashtra. ..
===============================
As on June 28, 2019 : The Project is under Planning Stage.
The company has 93 acres of land out of which approx. 11 acres of land is built-up area for existing sugar factory and other sub unit. Approx 5 acre is for the proposed units and ancillary units thereof such as boiler house, distillery plant, godown etc. The greenbelt area is proposed 2 acre.
********************************************************
IMPORTANT: As per the the discussion we had
on 24.06.2019 with Chhatrapati Sahakari Sakhar Karkhana Ltd.
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
12-18 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 15 TPH - 1 No.
( incineration boiler)
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator
Incineration boiler of capacity 15 TPH with 65 m stack will be used in proposed distillery unitr..
************************************************************************
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set :125 KVA : 1 No. (New)
will be installed for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
410 KLD will be sourced from and same will be met from from Majalgaon dam
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Industrial Use :390 M3/Day..............
---------------------------------------------------------------------------------------
Total: 410 M3/ Day
Details of Waste Water Discharge
1.Domestic :15 M3/Day
2.Industrial Use : 585 M3/Day..............
---------------------------------------------------------------------------------------
Total: 600 M3/ Day
********************************************************
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 2 Acre area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Sonajinaga, Sawargaon, Post: Mangrul No.1 Tq. Majalgaon Beed - 143113, Maharashtra, India
-----------------------------
Tel : +91-244-247600, Fax: +91-244-24700 Email: chhatrapati...@gmail.com
Released |
RELEASED : ISSUE JUNE 30/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Naglamal Sugar Plans for expansion ot its
Naglamal Sugar Complex, plans for expansion of its Molasses based Distilleryfrom 120 KLD to 150 KLD (AA/ENA/Ethanol) and to set up a new Co-Generation Power Plant of 8.0 MW at village: Naglamal, Tehsil: Sadar, District: Meerut in Uttar Pradesh...
Distillery : from 120 KLD to 150 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 8.0 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.40 Crores
Location : Village: Naglamal, Tehsil: Sadar, District: Meerut in Uttar Pradesh...
As on July 01, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 22.26 Ha of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 28.06.2019 with Naglamal Sugar Complex
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project Work is likely to start in H2 of 2019.
The Project is
Scheduled to be Completed in
12-18 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 50 TPH - 1 No.
Fuel (as avialable) : Bagasse / Slop
The total steam consumed at the project will be around 47.0 TPH
for distillery process and rest for Co ration Power Plant
Fuel Consumption : Bagasse : 180 TPD /
Slop : 432 KLD/
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitatorsr
To control the particulate emissions from Coal Fired boiler will be controlled by Bag Filter and emissions will be dispersed through Stack of suitable Height. .
Steam generated from the boilers and will be utilized in the generation of
8.0 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine : 8.0 MW
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set : 500 KVA - 1 No. & 1000 KVA - 1 No.
will be installed
for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
3375 KLD will be sourced from and same will be met from the ground water..
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
Waste Water Generation : 1080 KLD
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Naglamal Sugar Complex
(A Unit of Mawana Sugar Ltd. Mawana Sugars Limited)
5th Floor, Kirti Mahal 19 Rajendra Place,
New Delhi - 110125, Delhi, India
-------------------------------------------------….
Tel : +91-11-25739103 Fax: +91-11-25743659
Email :corp...@mawanasugars.com
Website : www.mawanasugars.com.
Released |
RELEASED : ISSUE JULY 07/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Kesar Enterprises Plans for expansion of its
Kesar Enterprises Limited, plans for expansion of its Molasses based Distilleryfrom 45 KLD to 125 KLD (AA/ENA/Ethanol) and to set up a new Co-Generation Power Plant of 4.0 MW at Baheri in Bareilly, Uttar Pradesh....
Distillery : From 45 KLD to 125 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 4.0 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.98.50 Crores
Location : Baheri in Bareilly, Uttar Pradesh....
As on July 08, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 20.831 Ha of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 30.06.2019 with Kesar Enterprise Limited
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
12-18 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 27 TPH - 1 No.
Boiler : 12 TPH - 1 No.
Fuel (as avialable) : Bagasse / Slop
The total steam consumed at the project will be around 32 TPH
for distillery process and rest for Co ration Power Plant
Fuel Consumption : Bagasse : 100 TPD /
Slop : 270 KLD/
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator
To control the particulate emissions from Coal Fired boiler will be controlled by Electrostatic Precipitator and emissions will be dispersed through Stack of suitable Height. 63 meter stack shall be installed with 27 TPH Boiler & 45 meter stack shall be installed with 12 TPH Boiler
Steam generated from the boilers and will be utilized in the generation of
4.0 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine : 4.0 MW
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set : 500 KVA - 1 No.
will be installed
for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
770 m3/Day will be sourced from and same will be met from the ground water..
( Industrial : 750 m3/Day & Domestic : 20 m3/Day)
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
Waste Water Generation : 750 KLD
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
Kesar Enterprises Limited
Orient House, 6th Floor, 7 Jamshedji Tata Road, Churchgate
Mumbai- 400020, India
-------------------------------------------------….
Tel : +91-22-22851737 Fax : +91-22-22876162
Email : heado...@kesarindia.com Website : www.kesarindia.com.
Released |
RELEASED : ISSUE AUGUST 04/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
United Provinces Sugar Company Plans to set a
United Sugar Provinces Sugar Company Limited plans for a Molasses based Distillery of110 KLD and Co-Generation Power Plant of 4.0 MW
at Village Sewrahi, Tehsil Tamakuhi Raj in Kushinagar District, Uttar Pradesh.
Distillery : 110 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 4.0 MW
=====================
Total Working Days in a year : 350 days
Project Cost : Rs.135 Crores
Location : Village Sewrahi, Tehsil Tamakuhi Raj in Kushinagar District, Uttar Pradesh..
===============================
As on August 14, 2019 : The Project is under Planning Stage.
The Total Project Area 12.0387 Acres (4.8720 Hectare )
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 09.08.2019 with United Sugar Province Sugar Company Ltd.
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
18-24 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 35 TPH - 1 No.
Fuel (as available) : Bagasse & Slop
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator
To control the particulate
emissions from Coal Fired boiler will be controlled by Electrostatic Precipitator and
emissions will be dispersed through Stack .
Steam generated from the boilers and will be utilized in the generation of additional
4.0 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine : 4.0 MW
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set : 1000 KVA & 1500 KVA
will be installed for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
872 m3/Day will be sourced from and same will be met from Borewell..
The water requirement for the first run for project would be 2850 m3/Day, which will be further reduced through recycling to 1978
m3/Day . Hence, fresh water requirement is 872
m3/Day .
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Industrial Use : 852 M3/Day..............
---------------------------------------------------------------------------------------
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
401/405, Jolly Bhavan No. 1, 10, New Marine Lines,
Mumbai - 400020, Maharashtra, India
-------------------------------------------------….
Tel: +91-22-22003231/4325 Fax : +91-22-2206 0745
Email:
upscl...@rediffmail.com/ upscl...@mtnl.net.in Website:
www.unitedprovincessugar.com
Released |
RELEASED : ISSUE AUGUST 11/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Orange Distillery & Beverages Plans
120 KLD Distillery & 4MW Co-Generation Plant..
================================== === =============
First info : June 2018 Update : December 2018 & May 2019
================================== === =============
Shri Orange Distillery & Beverages Pvt. Ltd. plans to set up a New 120 KLD Molasses/ Grain based Distillery along with a 4 MW Bagasse based Co-Generation Power Plant at Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh.
Distillery : 120 KLD
=====================
Co-Generation Power Plant : 4 MW
=====================
Total Working Days in a year : 350 days
Project Cost : Rs.178.58 Crores
Location : Fatehpur Roshni, Rania, Tehsil : Akbarpur, Dist : Kanpur Dehat, Uttar Pradesh.
As on August 16, 2019 : The Project is under Planning Stage.
The expansion would come up in its existing 7.0246 Acres of Land .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 12.08.2019 with Shri Orange Distillery & Beverages Pvt. Ltd.
the Project is under Panning Stage.
Project Work is yet to start .
Released |
RELEASED : ISSUE OCTOBER 26/19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600/ 900 7742 600)
New Project |
Rajshree Fine Chemical Industries Plans to set a
Rajshree Fine Chemicals Industries Pvt. Ltd. plans for a Molasses based Distillery of80 KLD and a Grain based Distillery of a 80 KLD along with a Co-Generation Power Plant of 5 MW at Shalpur Navadiya in Shahjahanpur District, Uttar Pradesh.
Distillery : 80 KLD + 80 KLD
(AA/ENA/Ethanol)
=====================
Co-Generation Power Plant : 5.0 MW
=====================
Total Working Days in a year : 330 days
Project Cost : Rs.146.59 Crores
Location : Vill : Shalpur Navadiya in Shahjahanpur District, Uttar Pradesh.
===============================
As on November 02, 2019 : The Project is under Planning Stage.
The Total Project Area 9.856 Hectare .
Out of this about 33% of the area will be developed as Green Belt.
********************************************************
IMPORTANT: As per the the discussion we had
on 24.10.2019 with Rajshree Fine Chemicals Industries Private Limited
the Project is under Panning Stage.
The company is now waiting for Environmental clearances .
The Project is
Scheduled to be Completed in
18-24 Months from the date of commencement of the project work.
=======================================
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : 40 TPH - 1 No.
Fuel (as available) : Bagasse & Slop
Fuel Consumption : Bagasse : 192 TPD /
Slop : 240 KLD
Heat Exchanger, Air Pre-Heater/ Economiser
===============================
Raw Materials :
Molasses & Grain :
===============================
Air Pollution Control Equipment :
Electrostatic Precipitator
To control the particulate
emissions from Coal Fired boiler will be controlled by Electrostatic Precipitator and
emissions will be dispersed through Stack of 60 Meter. .
Steam generated from the boilers and will be utilized in the generation of additional
5 MW Power and will also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they will Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be fed to the boiler furnace for burning the fuel.
************************************************************************
Steam turbine : 5 MW
with Step down transformer & synchronization Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Pumps
*************************************
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water consumption.
All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.
DG set :
will be installed for emergency power Back-up during power failure.
Water Treatment Plant
Oxidisation Chamber, Pressure Sand Filter / IRF, DM Plant,
Tube Settler
Pumps Valves, Custom Pipeline Work.
Total water requirement for the above project will be
944 m3/Day will be sourced from and same will be met from Borewell..
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Industrial Use : 924 M3/Day..............
---------------------------------------------------------------------------------------
Total: 944 m3/ Day
Details of Waste Water Discharge
1.Domestic :16 KLD
2.Industrial Use : 624 KLD..............
---------------------------------------------------------------------------------------
Total: 640 KLD
********************************************************
************************************
Effluent Treatment Plant :
The Boiler blow down & DM Plant & Softener regeneration water will be treated in a neutralization tank and after treatment it will be mixed with CT Blow down.
All these treated effluent streams will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for greenbelt development/dust suppression / ash conditioning. The scrubbed water from CO2 Scrubber will be consumed in the Fermentation section.
The effluent will be used for greenbelt development within the plant premises after ensuring the compliance with CPCB/SPCB standards.
Spent wash from molasses based distillery will be treated in biomethanisation, concentrated in Multiple Effect Evaporators (MEE) followed by Bio-composting.
*************************************
Other Equipments:
Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes,
DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments etc
Fire Fighting System shall be as per the TAC Norms and cover all areas where alcohol is produced, handled and stored.
Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant may Contact for Specified Enquiry at :
11, Utkarsh Mahanagar Phase - I, Bareilly - 243006, Uttar Pradesh, India
-------------------------------------------------….
Mob: 08395833333
--------------------------------------------------------
Consultant : Vapco Engineers Private Limited, A-1108, Mahaavir Icon, Plot No.89, Sector-15, CBD Belapur, Navi Mumbai, Thane 400614, Maharashtra, India
Mob: 09136439711 Tel: +91-22-49746151. Email: sa...@vapcoengineers.com www.vapcoengineers.com