Trimula Sponge Plans To Set Up 1 Lakh TPA Plant with Captive Power

319 views
Skip to first unread message

Industrial Directory Of India

unread,
Apr 5, 2012, 5:26:04 AM4/5/12
to industrialdir...@googlegroups.com

             New Projects This Week" 

                   RELEASED : ISSUE APRIL 01 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

   Trimula Sponge Plans To Set Up

 1 Lakh TPA Plant with Captive Power

                                      

Trimula Sponge Iron Private Limited   plans to set up  a

Sponge Iron Plant  having Capacity of  1,00,000 TPA along with along with a 60 MW Captive Power Plant at Devassar in Sidhi District, Madhya Pradesh.

Capacity :

1. Sponge Iron Plant : 1,00,000 TPA

2.Captive Power Plant   : 60 MW

Using (16 MW ( WHRB + 44 MW FBC).      

     

Location :  

Devassar,Sidhi District, Madhya Pradesh

 

****************************

Project History :

 

In the PHASE- I  the company has already set up Sponge Iron Plant with production capacity of 220,000 TPA and 38.5 MW Power Plant along with 84 TPH Fluidized Bed  Combustion shall be made operational.

 

In the PHASE- II  another Sponge Iron Plant with 110,000 TPA, of production shall be made operational.

 

And this is the  PHASE- III  and the final phase,  the company plans to set up a sponge iron and steel plant of 1,00,000 TPA  and along with 60 MW Power Plant  (16 MW WHRB & 44 MW Fluidized Bed Combustion).

 

Additional 2x500 MT Rolling Mill with Auxiliary will also be included.

 

*****************************

 

As 0n  APRIL 05, 2012 : The Project is in planning stage.

 

The  project is coming up on its existing 61.61 Hectares of Land. Out of  this 18.11 Hectares of Land will be developed as Green Belt.

 

IMPORTANT: As per the discussion we had last  on 30.03.2012  with  of Trimula Sponge Iron Private Limited   

the Project is under planning stage.

 

The company is now   waiting to obtain tne “NOC” from from  State Pollution Control Authority and allocation of mines.

The project work is likely to start from

July/ August,2012.

 

The Project   is Scheduled to be  Completed

in  2013 .

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Captive Power Plant : 60 MW

Using 16 MW WHRB  & 44MW FBC.      

1.Waste Heat Recovery Boiler: 2 Nos

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (FBC) Boiler: 1 No

Fuel : Coal and  Char 

Fuel Consumption :

Coal:2,85,805 TPA and Char : 5,500  TPA

 

ESP    : 1 No, Chimney – 1 No.

Stack : Height- 60 Meter,

 Total dolochar generated will be used in FBC Boiler along with coal to generate electricity. The flue-gases will be treated in high efficiency ESP and then discharged through stack into the atmosphere.

.

Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers.

 

1. DRI with auxilliary   : 1 X 350 TPD

2. SMS with auxiliary    : 6 X 15 MT

1. Rolling Mill with auxilliary   : 2 X 500 MT

2. Steam Turbine (1 No ): 44 MW   

The plant will require one no 44 MW Steam Turbine and  have uncontrolled extraction connected to one constant pressure deaerator normally working at 125DegC feed water temperature.

3. Iron Ore Crusher  

4. Coal crusher 

5. Coal/Char Preparing & Handling Plant    

 

SPONGE IRON (DRI) Unit

Coal based DRI process

The coal-based method of producing sponge iron involves reducing iron ore

(lumps/pellets) with a carbonaceous material like coal or lignite. The reduction process is carried out in a Rotary Kiln (which is inclined and rotatesat a pre-determined range of speeds) at a stipulated temperature (850oC –1050oC). The inclination & the rotary motion of the kiln ensure that the rawmaterials move from feed-end to the discharge-end of the kiln and it isduring this movement that the actual reduction of iron ore to iron takesplace. The material discharged from the kiln is taken to a rotary cooler forcooling and the cooled product, after being discharged from the cooler moveson to the next step in the production process viz. product separation and handling system.

 

At this stage the product is a mixture of sponge iron and non-magnetic

matter such as char and with the aid of magnetic separators, the final

product, sponge iron is separated and stored in bins meant for the purpose.

 

Raw Materials

Sponge Iron will be manufactured from Iron Ore (3,52,000 TPA) and coal (3,08,000 TPA) in  350 Kiln. The sponge produced will be the raw material for SMS plant and waste gases so produced will be utilized to generate power of through WHRB. Sponge Iron (3,30,000 TPA), Scrap (1,04,039 TPA), Ferro Alloys (1,380 TPA) will be used as raw material in Steel Melting Shop to produce MS billets. Billets will be manufactured by melting in induction furnace and casting in continuous casting machine. 16 MW power will be produced from Waste Heat Recovery Boiler (WHRB) and balance 44 MW will be produced from Atmospheric Fluidized Bed Combustion (AFBC) boiler. This AFBC boiler utilizes coal (2,85,805 TPA) and Char (5,500TPA).

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filters

 

Particulate emissions from the plant will be controlled within 50 mg/Nm3.

 

The plant shall be provided with Electrostatic Precipitators

having high efficiency (above 99.98%) for collection of the fly ash that would

be produced from the Process of coal combustion in Boiler Furnace.

An  Electro Static Precipitator would be provided for the cleaning / detarring of the Producer gas and the flue gases.

 

Stack of adequate height will be provided at the respective units.  Water sprinkling will be done along the haul roads to control dust arising from vehicular movement. Dry quenching of coke shall be explored.

 

Coal from the coal yard will be crushed in a Crusher and conveyed to coal storage bunkers of Boilers through a system of Conveyor Belts, Crusher and Vibrating Screens and is fed to the furnace.

 

ESP, Dust Extraction systems for Conveyor Transfer Points, Crusher and Screen house with Hoods, Bag filter and Fans will be provided.

 

De-mineralised water from the storage tank will be pumped to the boiler with the

aid of Boiler Feed Pump. The boiler feed water through an Economizer will

the Steam drum and water walls where it is heated and converted to

saturated steam.

 

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

Cooling Tower  : 1 No.

Closed cycle Cooling Tower.

DG Set : 

will be installed for stand by arrangement..

 

Air Conditioning Plant

 

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

-----------------------------------------------------------------------------

Centralized Control System

One centralized Control System will be installed  for the operation of major equipment (Boiler, STG, CW System) in the plant and other auxiliary systems (Compressors and DM plant) shall be operated from their relay based local control panels/stations.

------------------------------------------------------------------

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust    storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant :

Oxdisation Chamber, Filter, D.M. Plant, Tube Settler   

Pumps Valves, Custom Pipeline Work

 

The makeup water for the plant will  be drawn from hot water channel of Stage I & II.

 

However, water availability of 1835 m3/hr to be obtained from Bijul River.

 

Normal make up water requirement for the this  project would be about 1835 m3/hr with ash water re-circulation system in operation.

 

However, whenever ash water system needs to be operated in once thru mode, water drawal shall be of 75 cu meters per day.

 

Effluent  Treatment Plant:

The effluent generated consists of cooling tower blow down, boiler blow down, service water, D.M. Plant regeneration water and sanitary waste. Initially the acidic and alkaline effluent streams coming from cation and anion units of DM plant will be neutralized in a neutralization tank.

 

Water will then be passed through an oil separator to remove the oil content in the effluent. All these effluent streams will be mixed in holding tank along with cooling tower blow down. The treated effluent will be recycled and sent to the DRI plant & rolling mill as make-up water for cooling and the remaining treated effluent will be used for ash conditioning, dust suppression and for greenbelt development.

 

The sanitary wastewater will be treated in septic tank followed by soak pit.

.

Other Equipments :

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.         

 

18.11 Hectares of Greenbelt will be Developed  and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :

 

Trimula Sponge Iron Private Limited 

C 21, Sector 4, Devendra Nagar

Raipur –492009, Chhattisgarh, India

--------------------------------------------

Tel : + 91-771-4070604

Fax : + 91-771-4070609

------------------------------------------------

Email     : trimul...@yahoo.co.in

Website : www.trimulaspongeiron.com

 

*****************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                    Address/ Phone/ Fax

                    Contact person's Name

                    E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

            RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual  

 

 


Apr0112.jpg
Reply all
Reply to author
Forward
0 new messages