Anothe Unit : Triveni Engineering Plans To Set Up 80 KLD Molasses Base Distillery

402 views
Skip to first unread message

Industrial Directory Of India

unread,
Jul 21, 2013, 11:36:33 AM7/21/13
to industrialdir...@googlegroups.com
            “New Projects This Week" 

                   RELEASED : ISSUE JULY 21 /13

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

   

  Triveni Engineering Plans To Set Up

   80 KLD Molasses Base Distillery

                                      

Triveni Engineering & Industries Limited  plans to set

up  80 KLD Molasses based Distillery near existing distillery at Bhikki Bilaspur Village, 

Tehsil & District Muzaffarnagar, Uttar Pradesh.



[Important Note  :

  Please refer our Report on July 15,2013:

  "Triveni Engineering & Industries Limited  plans to set up  a  80 KLD Molasses based Distillery in the premises - adjacent to its Existing Sugar Unit at Sabitgarh Village, Post Karora, Tehsil Khurja, Bulandshahar District, Uttar Predesh." 


The company is putting up another Plant of same capacity (80 KLD) 

at Bhikki Bilaspur Village in Muzaffarnagar District , Uttar Pradesh.]


 

Capacity :

 

Distillery                   : 80 KLD

(by Multi pressure Distillation & fermentation process)

 

Electricity (Power) – 2.5 MW

Shall be generated through a backpressure type TG set.

 

Location :  Bhikki Bilaspur Village,

                 Tehsil & District Muzaffarnagar

                  Uttar Pradesh

                    

As on  JULY 21, 2013 : The Project is  under Planning Stage.

 

The distillery unit  will come up  near existing distillery.

IMPORTANT: As per the discussion we had on 08.07.2013 with Triveni Engineering & Industries Limited  the Project is under Panning Stage now.

 

The company is waiting for Environmental clearances.

 

The Project   is Scheduled to be  Completed

in  12 – 18 Months from the date of the commencement of the project work.

 

*****************************

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently. 

 

*****************************

The Main Scope of Supply includes:

Boiler     : 30 TPH     

Fuel          : Baggase /Biogas

 

Heat Exchanger, Air Pre- Heater/ Economiser.

 

Fermentation plant

Distillation plant

Evaporation plant

Molasses storage tanks

Alcohol storage tanks

Spent wash storage tanks 

 

Air Cooled Condenser

Power plant stack

Fuel system

Cooling Tower

Bottling Plant

Dryer

Multiple Effect Evaporators

Conveyors

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

To control the particulate emissions from the

Baggase Fired boiler will be controlled by ESP/Bag Filter/ high efficiency wet scrubber and emissions will be dispersed through Stack of Suitable Height.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

The condensed steam will return to the steam boiler as condensate and will again be boiled as steam. 

 

DG set : A  DG sets may be  installed for emergency

                      power   Back-up during power failure    

----------------------------------------------------------------

Water Treatment Plant

Iron Filter, ACF, DM Plant etc. 

Pumps Valves, Custom Pipeline Work.

 

Water requirement of about 840 m3/Day will be met

from the ground water source.

 

(A) Process                  : 820 m3/Day

(B) Domestic purpose    : 20m3/Day

-----------------------------------------

                 Total   : 840 m3/Day 

 

Effluent Treatment Plant

Total Effluent generation- 800 m3/Day

 (@ 10 KL/KL of product) Which shall be concentrated

through evaporation in proposed Multi - Effect Evaporation System

and then biocomposted to achieve zero discharge.

 

Multiple Effect Evaporator and Composted with pressmud to achieve zero discharge.  The spent wash will be stored in the lagoon of 30 days storage capacity and will be constructed as per the CPCB guidelines.

 

 Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area 

and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.    

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Triveni Engineering & Industries Limited 

15-16, 8th Floor, Express Trade Towers

Sector 16A, Noida – 201301, Uttar Pradesh, India.

--------------------------------------

Tel : + 91- 120-4308000

Fax : +91- 120-4311010/11

Website : www.trivenigroup.com

------------------------------------------------------               

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

        Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                    Address/ Phone/ Fax

                    Contact person's Name

                    E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

  

Jul2113.jpg
Reply all
Reply to author
Forward
0 new messages