Update : Almelo Chemicals Plans for 708 Ton/Year Pharmaceutical Unit

119 views
Skip to first unread message

Industrial Directory Of India

unread,
Sep 2, 2014, 10:30:29 AM9/2/14
to industrialdir...@googlegroups.com
     Industrial Directory of India.Com 

       Released
               "New Projects This Week" 
                   RELEASED : ISSUE AUGUST 31 /14 
              Comprising  of  Total  82 New Project Enquiries 
  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
           Visit http://industrialdirectoryofindia.com/FAQ
    (Helpline : +91-900 7158 600) 
                      Project Update

                                                           

       Almelo Chemicals  Plans for

708 Ton/Year Pharmaceutical Unit 

---------------------------------------------

          (Update : Ref Our Earlier Report on 04.03.2014 )    

Almelo Chemicals Pvt. Ltd.  plans to set up a New Unit to produce 
Bulk Drug & its Intermediates  having Capacity of 
   708 Ton/Year at Shabashpally Village, Shivampet Mandal in Medak District, Telangana.
 

Capacity :  708 Ton/Year                 

The plant will be established to manufacture 70 Products on campaign basis

( any 9 Products will be manufactured at a time ) with a Total Production Capacity of  708 Ton/Year .

The plant will be set up along with an In-House R&D facility .

 
Location Shabashpally Village, Shivampet Mandal 
                   Medak District, Telangana
                

 **************************************

As on  September 02, 2014 : The Project is under Planning Stage. 

Total site area is  23.06 Acres.

An area of about  7.6 Acres( 33.01% )  of land  will be developed with green belt . 

IMPORTANT: As per the the discussion we had

on 21.08.2014 with  Almelo Chemicals Pvt. Ltd..  

the Project  is  under Panning Stage.

The company is still waiting for Environmental Clearance. 

The Project  is Scheduled to be  Completed

in  12 Months from the date of commencement of the project. 

-------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address to obtain
 the detailed Enquiry of each product  in time and to submit your quotation subsequently. 

**************************

The Main Scope of Supply includes

1. Boiler       : 5 TPH  - 2 Nos.

         Fuel           :  Coal     
         Stack         :  Height : 30 Meter / Dia : 600 mm

2. Boiler       : 3 TPH  - 1 No.

         Fuel           :  Coal     
         Stack         :  Height : 30 Meter / Dia : 400 mm

 Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Polution Control:

There will be one no of flue gas stack and one process gas stack which

are the main emission source from the plant for each Boiler.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority. 

For Boiler Multi Cone Cyclone &  Bag filter  will be provided with 

30 Meter of Stack for 5 TPH Boiler (2 Nos) and 3 TPH Boiler (1 No) 

Process Emission:

Scrubber : Gases emission will be scrubbed   in Two Stages with Water and Caustic solution, based on the characteristics of the gases. 

Solvent Management for Effective Recovery: 

Reactor will be connected to Chilled Brine Condenser System

Solvent Storage will be provided with breather valves to avoid losses

 ************************

Other Equipments:

SS Reactor                

---------------------------------------------

Dryer             

---------------------------------------------
HCl Fume Scrubber    

--------------------------------------------

Chilling Water plant  

---------------------------------------------

Filter Drier        

-----------------------------------------------

Cooling Tower (3000 TR)            

---------------------------------------------

SOLVENT RECOVERY SYSTEM         

-------------------------------------------

DM/R.O. plant                    

----------------------------------------------

Water Softener          

---------------------------------------------

Air Compressor          

----------------------------------------------

Effluent Treatment Plant 

----------------------------------------------

Pumps                       

-----------------------------------------------------

Centrifuge

----------------------------------------------

SS & HDPE Storage Tanks      

-----------------------------------------------------

Compressor

---------------------------------------------- 

**************************

DG sets :  350 KVA -  2 Nos.      

                               250 KVA -  1 No.  

For back up in the common areas as well as for essential services
above Three D.G.sets will be installed.
 
***********************************************

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work 

The total  Water demand for this project has been estimated as 398 m3/Day.

258 m3/Day  shall be drawn from bore well and the balance 140 m3/Day shall be

recycled water.

 Details of Water Consumption ( Input)

1.Domestic                       :   13  m3/Day
2.Process Water                  80 m3/Day
3.Boiler                             :    63  m3/Day ( 20% Make up)
4. Scrubber                      :    8  m3/Day
5. Cooling   Tower             : 40  m3/Day ( Recy : 140 m3/Day)
6. Washing-                      8  m3/Day
7. Gardening                  :    40 m3/Day 
     8. QC & R & D                :     3 m3/Day  
      9 D.M. Generation        :       3 m3/Day 

---------------------------------------------------------------------------------------
          Total:  398 m3/ Day
     (Fresh :  258 m3/ Day + Recycled : 140 m3/ Day)

 
 Details of Waste Water Generation (Output)

1.Domestic                       :   10  m3/Day ( Loss : 3 m3/Day)
2.Process Water                  85 m3/Day ( Evaporation/Loss: - 5 m3/Day)
3.Boiler (Blow Down)    :       11  m3/Day ( Evaporation/Loss:52 m3/Day)
4. Scrubber                      :    8  m3/Day
5. Cooling Tower (bleed)    15  m3/Day ( Evaporation/Loss:165 m3/Day)
6. Washing-                       8  m3/Day
7. Gardening                  :    -----   (Loss : 40m3/Day)
     8. QC & R & D                :     3 m3/Day  
     9 D.M. Generation        :        3 m3/Day 

---------------------------------------------------------------------------------------
          Total:  398 m3/ Day
     (Effluent for Recycle :  143 m3/ Day + Loss : 255 m3/ Day)

 

Effluent Treatment Plant:

Capacity : 150 m3/ Day

Reverse Osmosis Plant

 

About 143 m3 / day of Effluent (Waste Water) will be  generated

from process and utilities.


The effluent generated  is mainly from process, washings, scrubbers, cooling towers & boiler blow downs and domestic effluent

 The treated wastewater will be reused for flushing and green belt  development.

 The treatment scheme shall be designed to treat the wastewater and reuse  the treated water for Gardening and flushing. 

The industrial effluent is proposed to be treated in the proposed ETP with Zero Liquid  Disposal (ZLD) System.

The process effluent (High Pollution Stream) will be taken to neutralization tank and  treated with suitable chemicals to bring down pH to neutral condition. Then, the effluent  will be fed to solvent stripper followed by Multiple-Effect Evaporator (MEE) and ATFD.

The solvent will be stripped initially and collected in a receiver, then the remaining effluent is further concentrated from 4% to 40% in MEE, and further concentrated into  salts with 6-8% moisture in ATFD. 

The MEE condensate will be routed through proposed  biological effluents treatment plant to further treat any residual COD. The low polluting  stream wastewater will be mixed with condensate of High polluting stream and treated in the biological treatment system.

The treated water will be used for Cooling Tower, Flushing and Gardening. 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work. 

Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms. 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipment  Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  : 

 Almelo Chemicals Pvt. Ltd.  

Plot Nos. A-38 & 39, Road No.7, IDA Kukatpally

Hyderabad - 500 037, Telangana, India

-------------------------------------------------….

Tel  : + 91- 40-27612627

Fax : + 91-40- 27611881

Email      :  in...@almelochem.com

Website  : www.almelochem.com

            New Projects
 
               **************************************           

          FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES
                   Visit : http://industrialdirectoryofindia.com/FAQ
      GET NEW PROJECTS INFORMATIONS  ONLINE   
                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.                

                 with all Contact Details:

                      Company's Name

                     Address/ Phone/ Fax

                     Contact person's Name

                     E-mail Id

 We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  . 

Visit : http://www.industrialdirectoryofindia.com/registration 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Aug3114.jpg
Reply all
Reply to author
Forward
0 new messages