Arjun Pulp & Paper Is Setting Up 6 MW Co-Generation Power Plant

580 views
Skip to first unread message

Industrial Directory Of India

unread,
Jun 28, 2011, 6:21:22 AM6/28/11
to industrialdir...@googlegroups.com

                   “New Projects This Week" 

                   RELEASED : ISSUE JUNE 26/11 

              Comprising  of  Total  60 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit : http://industrialdirectoryofindia.com/FAQ

      (Helpline : +91-900 7158 600)

 

    Arjun Pulp & Paper Setting Up

  6 MW Co-Generation Power Plant 

                                      

Arjun Pulp and Paper (India) Private Limited plans to set up   setting up  a 6 MW Co-Generation Power Plant at its upcoming

29,500 TPA  Greenfied Paper  Mill Complex in Tirunelveli District,

Tamilnadu.

 

Capacity :

Power Plant  : 6 MW                                            

 

Location :  

Thuvarasi Village,Tirunelveli District, Tamilnadu.

                   

As 0n  June 28, 2011 : The Project is  under Planning Stage.

 

The unit would come up on about 5 Acres of Land .

 

IMPORTANT: As per the discussion we had on 24.06.2011 with

Arjun Pulp and Paper (India) Private Limited, the Project is under Panning Stage now. 

 

The company is waiting for the clearance from State Pollution Control

Authority.

The project work is likely to start from August/ September 2011.

 

The Project   is Scheduled to be  Completed

by December 2012

 

So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : 40 TPH (AFBC)

Fuel             : Imported Coal, lignite, Saw dust,

                             DOB & Wood chips 


Fuel Requirement : 11 TPH or 264 Tons/Day

Stack Height   : 65 M

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Fuel system

 

Air Pollution Control Equipment :

High Efficiency Electro Static Precipitators (ESP)

 

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.


Total Ash Generation will be

Fly Ash      : 17.88 TPD

Bed Ash     : 2.24 TPD

 

Dust Suppression System like fog type and water spray system will be installed in the material unloading areas like fog type and water spray system will be installed in the material unloading areas.

 

Power Evacuation:

Power will be evacuated to its in-house used after stepped down

11 kV and 433 volts

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

Water sprinkler & Bag filter at transfer points.

 

Cooling Tower

Cooling Pond

DG Set

Compressors

 

Water Treatment Plant

Filters, Pressure Sand Filter, IRF, DM Plant,Tube Settler 

Pumps Valves, Custom Pipeline Work

 

The project will source its entire water requirement from Thamirabarani River.

The total daily fresh water requirement of the proposed co-generation plant is

about 780 m3/ Day.

 

The project will not extract groundwater and hence there will be no impact on ground water.

(Use of Air Cooled Condenser reduces the water consumption)

 

Waste Water & Effluent Treatment Plant:

The wastewater generated in the plant area will be treated in the ETP plant and will be recycled / reused in the plant process.

 Total Waste Water generation will be : 239 m3/ Day.

 Under normal operation of the plant, no wastewater will be discharged out side plant premises. The storm water in the project area will be collected through storm water drains and shall be suitably diverted to rainwater harvesting pits and the overflow from the RWH pits will be diverted to nearby nalla.

Hence, impact on the water quality is not envisaged.

 The waste water, which will be generated from the Co-Gen plant will be:

Boiler Blowdown

Auxiliary Cooling Water Blowdown

D.M. Plant Regeneration Waste

Domestic Sewage

 

The wastewater will be generated from DM plant and cooling towers in the powerplant. Additionally, domestic wastewater from canteen and employees wash area will also be generated. The following measures to minimize the impacts and conservation of fresh water are to be installed :

 

Recycling of complete wastewater generated in cooling tower into ash handling and disposal;

Recycling the entire wastewater from DM plant and boiler after treat it in papermill ETP;

Provision of septic tank to treat domestic sewage from plant;

Utilization of treated wastewater for greenbelt development;

Suitable rainwater harvesting structures to be constructed.

 

Other Equipments :

Material Handling Equipment : Conveyor, Screen, Crushers, Hydraulic Equipment/Cranes.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG Set, Air Compressor. Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Pressure Filler, Storage Tank, Cooling Tower/ Plant,

 

Air Conditioning Plant,

Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms.

 Green Belt Development & Rain water harvesting

Green Belt Development plan in 1.66 Acres area Rain water harvesting pits will be constructed to harvest the roof top water in consultation with State Ground Water Board.

 The company will  develop wide greenbelt around the project premises. In the

proposed greenbelt, trees will be planted in an area of 0.72-ha (1.66 Acres)  land with a density of 2000 trees/ha. Every year 500 number of trees will be planted and

absolute greenbelt will be developed over a period 3 years.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Power Plant   may  Contact for Specified Enquiry at :


Arjun Pulp and Paper (India) Private Limited

Prop : Arjun Group

Robert V Chandran Tower, II Floor

No.149, Velachery Tambaram High Road

Pallikaranai, Chennai 600 100.

----------------------------------------------------------------

Tel  : +91- 44- 30453045

Fax : +91- 44 -30453000

Email      :  acl.ma...@arjunchemicals.com

Website :  www.arjunchemicals.com

-----------------------------------------------------------------------------

Contact Person: P. Subbiah, Site Manager

 

 ***********************************   

        FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

          Visit : http://industrialdirectoryofindia.com/FAQ

    GET NEW PROJECTS INFORMATIONS  ONLINE                     

        http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 


Jun2611.jpg
Reply all
Reply to author
Forward
0 new messages