Sri Krishna Pharmaceuticals Plans
For a 2545 Ton/ Month Bulk Drugs Unit
Sri Krishna Pharmaceuticals Limited plans to set up a New Unit to produce Bulk Drugs & Intermediates having Capacity of 2545 Ton/ Month at Chincholi Village, Taluka : Mohol in Solapur District, Maharashtra.
Capacity : 2545 Ton/ Month
Following Products will be manufactured in the proposed plant :
Location : Chincholi Village, Taluka : Mohol
**************************************
As on May 15, 2014 : The Project is under Planning Stage .
Total site area is 25 Acres.
Out of this 33% has been demarcated for Green belt development.
IMPORTANT: As per the discussion we had on 24.04.2014 with
Sri Krishna Pharmaceuticals Limited the Project is under Panning Stage now.
The company is waiting for Environmental Clearance.
The Project is Scheduled to be Completed in 12-15 Months
From the date of commencement of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Boiler : 15 TPH - 2 Nos.Boiler : *10 TPH - 1 No.
Fuel : Coal
Thermic Fluid Heater
Capacity : 2 Lakh Kcal
Fuel : HSD
Heat Exchangers, Air Pre-heater/Economiser).
Air Polution Control:
There will be flue gas stacks for Boilers which is the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
Coal will be used as a fuel in Boilers (both 15 TPH & 10 TPH).
The flue gases generated will be passed through pollution control equipment (Cyclone Dust Collector) and goes out through stacks of appropriate height and design. Velocity will be maintained. These will help in dispersion of flue gas and will avoid any down wash.
Other Equipments:
S.S Reactor : 7.0 KL
---------------------------------------------
S.S Reactor : 8.0 KL
---------------------------------------------
S.S Reactor : 4.0 KL
---------------------------------------------
Reactor ( FRP) : 10.0 KL
Qty : 1 No.
---------------------------------------------
S.S Reactor : 9.0 KL
Octagonal Blender : 1.5 KL(SS)
---------------------------------------------
Miller : SS : 100 KG/H
Qty : 2 Nos.
---------------------------------------------
Weighing Machine(SS)
Qty : 4 Nos.
--------------------------------------------
--------------------------------------------
Air Compressor
--------------------------------------------
Chilling plant & pump :
Qty : 1 No
---------------------------------------------
Vacuum jet
Qty : 4 Nos.
-----------------------------------------------
Drum Lifter : 1 Ton
---------------------------------------------
Pipe line :
---------------------------------------------
Fire Hydrant : 1 set
---------------------------------------------
DG sets :
1000 KVA - 1 No.
Fuel : HSD ( 500 lit/hr.)
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The total water requirement will be 1690 m3/Day,
Details of Water Consumption ( During Dry Season)
1.Domestic : 50 M3/Day
2. Process : 678.23 M3/Day
3. Cooling Tower & Boiler : 711.60 M3/Day
4. MEE & ATFD : 210 M3/Day
---------------------------------------------------------------------------------------
Total: 1688.83 m3/ Day
Details of Waste Water Generation ( During Dry Season)
1.Domestic : 30 M3/Day
2. Process : 706.84 M3/Day
3. Cooling Tower & Boiler : 71 M3/Day
4. MEE & ATFD : 210 M3/Day
---------------------------------------------------------------------------------------
Total: 1017.84 m3/ Day
Details of Water Consumption ( During Wet Season)
1.Domestic : 50 M3/Day
2. Process : 678.23 M3/Day
3. Cooling Tower & Boiler : 711.60 M3/Day
4. MEE & ATFD : 210 M3/Day
---------------------------------------------------------------------------------------
Total: 1649.83 m3/ Day
Details of Waste Water Generation ( During Wet Season)
1.Domestic : 30 M3/Day
2. Process : 706.84 M3/Day
3. Cooling Tower & Boiler : 71 M3/Day
4. MEE & ATFD : 210 M3/Day
---------------------------------------------------------------------------------------
Total: 1017.84 m3/ Day
It is proposed to re-use treated water to the maximum extent. This ensures the lesser
requirement of fresh water. Also it is proposed rain water harvesting structures at the site to
re-charge the ground water resources.
Effluent Treatment Plant:
Capacity : 1000 KLD
The plant will include MEE & RO to treat and recycle / reuse the effluents discharged from the manufacturing processes and also for treatment of sewage generated from the toilets in well-designed septic tank followed by soak pit.
The treated water from the ETP shall be recycled and reused for cooling water make up, process use wherever feasible and gardening purpose inside the premises
*************************
Other Equipments:
Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine, Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Sri Krishna Pharmaceuticals Ltd.
Plot No. C-4 Industrial Area, Uppal
Hyderabad- 500 039, Andhra Pradesh, India
-------------------------------------------------….
Tel : + 91-40-27204471-72, 27201101 (4 lines)
Fax : + 91-40-27204470/ 27203645
Email : r...@srikrishnapharma.comWebsite : www.srikrishnapharma.com
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”