Update : Mylan Laboratories Plans For Expansion With a NEW 5 MW Co-Gen Power

134 views
Skip to first unread message

Industrial Directory Of India

unread,
May 28, 2014, 12:35:08 AM5/28/14
to industrialdir...@googlegroups.com

                    "New Projects This Week" 

                          RELEASED : ISSUE MAY 25/14 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

Mylan Laboratories Plans For Expansion

    With a NEW 5 MW  Co-Gen Power

         ==================================== 

           Update  :   Refer our Earlier Report on

                              December 11, 2013  

   ==================================== 

                            

Mylan Laboratories Limited plans to enhance the production capacity of its Active Pharma Ingredients (API’s) manufacturing Unit from 15.51 Ton/Month to 81.52 Ton/Month along with setting up of a New Coal Based 5 MW  Co-Generation Power Plant  at Pashamylaram Village, Pattancheru Mondal in Medak District, Andhra Pradesh.

 

Capacity:

Expansion:

Active Pharma Ingredients (API’s):

From 15.51 Ton/Month to 81.52 Ton/Month

 

New Plant:

Co-Gen Power Plant  : 5 MW (Coal Based)

 

***********************             

Following Products will be manufactured after expansion :


1 .Acyclovir                               : 30 Ton/Month /    1000  Kg/day

2 Aliskiren Hemifumarate         : 0.1 Ton/Month /    3.33 Kg/day
3 Almotriptan                            : 0.1 Ton/Month /   3.33 Kg/day
4 Alprazolam                            : 0.2  Ton/Month /    6.67 Kg/day
5 Amlodipine Besilate              :1    Ton/Month  /      33.33 Kg/day
6 Armodafinil                           :0.04 Ton/Month/    1.33  Kg/day
7 Asenapine Maleate               :0.1 Ton/Month /     3.33  Kg/day
8 Atorvastatin                          : 0.01 Ton/Month/     0.33 Kg/day
9 Azelnidipine                         :0.02 Ton/Month/     0.67 Kg/day
10 Azilsartan Medomoximil     :0.02 Ton/Month/     0.67 Kg/day
11 Cetrizine                             :Ton/Month  /       33.33 Kg/day
12 Clarithromycin                    : 4  Ton/Month /     133.33  Kg/day
13 Cyclobenzaprine                : 0.11 Ton/Month/     3.67 Kg/day
14 Des Venlafaxine Fumarate  :0.03 Ton/Month/    1 Kg/day
15 Des-Loratadine                    :0.1 Ton/Month/      3.33  Kg/day
16 Dexalansoprozol                : 0.5 Ton/Month/     16.67 Kg/day
17 Dronedarone                      :0.08 Ton/Month /    2.67  Kg/day
18 Fluconazole                        :Ton/Month /        33.33 Kg/day
19 Irbesetran                            :Ton/Month/        266.67 Kg/day
20 Itraconazole                        :0.05 Ton/Month /   1.67  Kg/day
21 Labetelol                             :0.02 Ton/Month/    0.67  Kg/day
22 Lamotrigene                       : 0.25 Ton/Month/    8.33  Kg/day
23 Lansaprazole                      :Ton/Month/        33.33 Kg/day
24 Lisinopril                             : 0.01 Ton/Month/    0.33 Kg/day
25 llapprazole Sulfide              : 0.08 Ton/Month/   2.67 Kg/day
26 lloperidone                          :0.02 Ton/Month/     0.67 Kg/day
27 Loratadine                           :Ton/Month /       33.33 Kg/day
28 Losartan                               :  Ton/Month/     33.33 Kg/day
29 O-Des methyl Venlafaine      : 0.03 Ton/Month/  1 Kg/day
     Succinate
30 Omeprazole                          :0.03 Ton/Month /   1 Kg/day
31 Oxybutynim H CL                 :0.05 Ton/Month/    1.67 Kg/day
32 Paliperidone                        : 0.03 Ton/Month /  1 Kg/day
33 Perindopril Arginine             :0.03 Ton/Month/   1 Kg/day
34 Perindropil Erbumine           :0.05 Ton/Month/   1.67 Kg/day
35 Pioglitazone                         :3  Ton/Month/      100 Kg/day
36 Pitavastatin                           :0.1 Ton/Month/   3.33 Kg/day
37 Rebeprazole                         : 0.15 Ton/Month/   5 Kg/day
38 Resperidone                         :0.15 Ton/Month/    5 Kg/day
39 Rizatriptan                            :0.1 Ton/Month/    3.33 Kg/day
40 Rosuvastatin                         :0.2  Ton/Month/   6.67 Kg/day
41 Telmesetran                         :2   Ton/Month/      66.67 Kg/day
42 Temazepam                         :0.01 Ton/Month/   0.33 Kg/day
43 Terbinafine HCl                    : 0.02 Ton/Month/  0.67 Kg/day
44 Tetrabenazine                      :0.02 Ton/Month/   0.67 Kg/day
45 Valacyclovir                          :25  Ton/Month/    833.33 Kg/day
46 Zoledronic Acid                    :0.01 Ton/Month/   0.33 Kg/day
47 Zolmitriptan                          :0.1 Ton/Month/     3.33 Kg/day
48 Validation products              : 0.6 Ton/Month/    20  Kg/day

-------------------------------------------------------

         Total  :   81.52 Ton/ Month

              (2717.33 Kgs/Day)

 

Location : Pashamylaram Village, Pattancheru Mondal 

                 Medak District, Andhra Pradesh. 


**************************************

As on  May 28, 2014 : The Project is under Planning Stage .

 

The  expansion of its Active Pharma Ingredients and New Power Plant will come up 

 at its existing  Plant Area of  30.81 Acres. 

 

IMPORTANT: As per the the discussion we had

on 12.05.2014 with Mylan Laboratories Limited.    

the Project  is  under Panning Stage.

 

The company is still waiting for Environmental Clearance.


The Project Work is likely to commence 

in April, 2015.

 

The Project   is Scheduled to be  Completed by

Within 12-15 Months from the date of commencement

of Project Work..

 

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes 

Boiler        : 30 TPH  - 1 No.

                 Fuel           :  Coal 

                 Stack         :  42 Meter (Dia : 2000 mm)    

 

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash


Existing Status of Heating Equipment:

Presently the company is  operating  Two Nos. of  following Capacity Boiler: 

Boiler -I

Capacity : 8 TPH - 1 No.

Fuel   :  Coal

Stack :  Height- 30 Meters / Dia: 1500 mm 

Boiler -II

Capacity : 5 TPH - 1 No.

Fuel   :  FO

Stack :  Height- 30 Meters / Dia: 1500 mm

Note:

After Expansion proposed 30 TPH Capacity Boiler will be in operation and existing 8 TPH  & 5 TPH Capacity Boilers will remain as stand by.


 *********************************************

Air Polution Control:

There will be one nos. of flue gas stack which are the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

For Boiler Cyclone separator. &  Bag filter  will be provided with 42  Meter of Stack  for 30 TPH Coal Fired  Boiler

 

Scrubber  will  also be provided.

 


************************

Other Equipments:

SS Reactor

---------------------------------------------

Dryer             

---------------------------------------------  

 Filter Drier        

--------------------------------------------

Chilling Water plant  

---------------------------------------------

Cooling Tower           

---------------------------------------------

SOLVENT RECOVERY SYSTEM         

-------------------------------------------

DM plant                     

----------------------------------------------

Water Softener          

---------------------------------------------

Air Compressor          

----------------------------------------------

Effluent Treatment Plant 

----------------------------------------------

Pumps                       

-----------------------------------------------------

Centrifuge

----------------------------------------------

SS & HDPE Storage Tanks      

-----------------------------------------------------

Compressor

----------------------------------------------

Agitator

 

**************************

DG sets

New : 1500 KVA 3 Nos.

(Existing : 3 x 750 KVA + 1 x 1250KVA + 2 x 1500KVA )

DG sets will be used during load shut down by APTRANSCO.

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work 

Total water required shall increase from  257 m3/Day to 1175 m3/Day out of which  821 m3/Day  shall be met from APIIC and the balance shall be recycled water. 

 

Details of Water Consumption

1.Domestic                                     :  40   M3/Day

2.Process Water                             : 138    M3/Day

3.Boiler                                           : 216   M3/Day

4. Process & Utility RO rejects         : 196   M3/Day.

    to Cooling tower make-up

5. Cooling Tower                             : 106  M3/Day

6. Gardening                                    : 50   M3/Day

7. DM Plant,Softener, Purified water   : 35   M3/Day

8. Scrubber                                     :   5    M3/Day

9. Washing                                       10    M3/Day

10.Solvent recovery plant                   :10    M3/Day

11.Detoxification                               : 5    M3/Day 

12.ZLD Washings                            : 10    M3/Day 

------------------------------------------------------------------------------------

               Total:  821 m3/ Day

  *Recycled        :  354  m3/Day

 ----------------------------------------

  Total    :        1175 m3/ Day


*(Cooling Tower, Process & 

Utility RO rejects to Cooling tower make-up)


Details of Waste Water Generation

1.Domestic                                     :  40   M3/Day

2.Process Water                             : 147** M3/Day

3.Boiler                                           : 20   M3/Day 

4. Process & Utility RO rejects         : 72   M3/Day.

    to Cooling tower make-up

   & Cooling Tower                             : 

5. Gardening                                    : --- 

6. DM Plant,Softener, Purified water   : 35   M3/Day

7. Scrubber                                     :   5    M3/Day

8. Washing                                       10    M3/Day

9.Solvent recovery plant                   :10    M3/Day

10.Detoxification                               : 5    M3/Day 

11.ZLD Washings                            : 10    M3/Day 

------------------------------------------------------------------------------------

               Total:  354 m3/ Day

       Loss        :  826  m3/Day

 ----------------------------------------

  Total    :        1180 m3/ Day

** Process effluents contain soluble raw materials, byproducts, solvents etc.

 

Effluent Treatment Plant:

Effluent Generated – After Expansion (Tentative)


Total HTDS :    67 KLD

Total LTDS  : 279 KLD

---------------------------

 Total   :         346 KLD


The effluent generated from the proposed expansion  is mainly from process, washings, scrubbers, cooling towers & boiler blow downs and domestic effluent. Effluent from process, HTDS effluent sent to Stripper, Multiple Effect Evaporator followed by ATFD, Biological treatment and RO. 


LTDS effluent from process, washings, scrubbers, Solvent recovery system, DM rejects, Cooling towers, boiler

bow downs, detoxification effluent, ZLD washings and domestic effluents shall be sent to

Biological treatment system followed by RO. The treated effluent shall be reused for cooling towers.

 

 Solid wastes are generated from the process shall be sent to TSDF/ Cement Industries for Co-incineration. Stripper distillate shall send to TSDF/ Cement Industries for Coincineration.

Evaporation salts from MEE and ATFD and ETP Sludge shall be sent to TSDF.


Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 

Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Mylan Laboratories Limited   

Plot No 564/A/22, Road No 92, 

Jubilee Hills

Hyderabad — 500034 , Andhra Pradesh, India

-------------------------------------------------….

Tel             : +91- 40- 30866666 / 23550543 

Fax           : +91- 40-30866699  

Email        :      mylan...@mylan.in

Website   :      www.mylan.in

**************************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                     Contact person's Name

                     E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

 



May2514.jpg
Reply all
Reply to author
Forward
0 new messages