Jai Bhole Cement Plans to Set Up 2.5 MTPA Cement Plant With 72 MW CPP.....

350 views
Skip to first unread message

Industrial Directory Of India

unread,
Nov 22, 2012, 12:11:49 PM11/22/12
to industrialdir...@googlegroups.com
                “New Projects This Week" 

                   RELEASED : ISSUE NOVEMBER 18 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

     

    Jai Bhole Cement Plans to Set Up

2.5 MTPA Cement Plant With 72 MW CPP

    =================================

 

Jai Bhole Cement Combine Private Limited  plans to set up a Greenfield Integrated Cement Plant comprising of  

2.5 MTPA of Cement (Blended) Grinding Unit , 2.0 MTPA of Clinker  Unit along with  Coal based Captive Power plant of 72 MWWHRB Power plant of 10 MW and  

2 x 6 MW  DG SET at Velabai Village, Wani  Taluka in Yavatmal District, Maharashtra.

 

Capacity :

Cement Plant                : 2.5 MTPA 

Clinker                          : 2.0 MTPA 

 

Captive  Power Plant    

  1. Coal Based                    72 MW  

  2. WHRB                           10 MW

 

DG SET                  : 2X6 MW  

 


Location :  Velabai Village, Wani Taluka,

                   Yavatmal District, Maharashtra

                 

                   

As 0n  November 22, 2012 :  The  Project is  under  planning    stage.

 

The project is coming up on about 100.81 Ha of single crop

agriculture land.


Out of this  35% of the area will be developed as Green Belt.

IMPORTANT: As per the discussion we had on 19.11.2012 with  Jai Bhole Cement Combine Private Limited  the project is under planning stage.

 

****************************************

Please Note :

Earlier last year, on October 12, 2011, the company had signed an  MoU with Maharashtra Government to set up this Integrated  Greenfield cement plant and expected cost of the project is Rs.1,501.97 crore.

 

****************************************

 

The company is now  waiting for Environmental  Clarence.

 

The Project   is Scheduled to be  Completed in Two & Half Years from the date of commencement of the project work.

 

So, this is the RIGHT TIME to contact  and Follow Up Contractor  at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

*****************************

The Main Scope of Supply includes:

Captive Power Plant : 72 MW + 10 MW

(WHRB: 10 MW + AFBC  : 72 MW)      

1.Waste Heat Recovery Boiler: 

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate 10 MW electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (FBC) Boiler:      

It will be based on FBC Boiler Technology where Mixture of Coal and Middlings of Coal washery shall be used as fuel  in AFBC Boiler to  generate 72 MW electricity. The flue-gases will be treated in high efficiency ESP and then discharged through stack into the atmosphere.


Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers.

 

Rotary Klin: Rotary kiln with multistage preheater and 

precalcinator fo Clinkerisation of the raw meal.

 

Kiln will be provided with Bag house, ESP for Cooler and Bag filters for Coal mill and Cement will be provided.

 

Fuel Requirement :

 

  1. Coal             :  1100 TPD For captive Power plant

                            1100 TPD For Cement Plant

 

  1. HSD / LDO  :  2500 Litre for Kiln Light Up • 10 Litre / Hr for 

                            Emergency Power

 

Manufacturing Process :

The manufacturing process involves crushing of limestone, grinding of raw materials, homogenization of raw meal, pyroprocessing, clinker making, clinker storage, and cooling, cement making and blending with fly ash, packing and dispatch.

 

Limestone, Iron ore, Gypsum and Coal will be the raw material used during the manufacturing of cement and in power plant.

 Limestone will be sourced from from adjacent Captive Mines..

 Indian Coal will be sourced from Coal India Ltd and Imported coal will be sourced from either Indonesia/South Africa.

 

 

The Total Minerals required for cement plant are:

 

  1. Limestone             :  3.0 MTPA
  2. Bauxite/Laterite  :  0.04  MTPA
  3. Coal : 0.72 MTPA  
  4. Flyash : 0.7 MTPA sourced from CPP and nearest Thermal Power Plants
  5. Gypsum : 0.10 MTPA sourced from Corromondal Fertilizer, Vizag located about 850 km

 

Power required for the proposed plant will be sourced from captive power plant (72 MW)

 

The clinker manufacturing involves

Raw Material Preparation

Raw Meal Preparation

Clinkerisation and

Cement Packing & Storage..

 

Dry process will be used for cement production.

Vertical Roller Mill will be provided for Drying and Grinding the raw materials.

Bended raw material will be fed to Pyro-Processing section (kiln) and heated at 14500C for clinker formation.  Clinker will be cooled and ground at closed circuit ball mills.

 

In Captive Power Plant, chemical energy of coal will be converted to heat energy for steam generation which will be used to cement mechanical energy in a turbine to electrical energy.


Air Slides
Screw Conveyor

Crusher

Air Blasters

Clinker Grinder Unit

Grate Coolers

Vertical Roller

Ball Mills

High Efficiency Separators.

Transformer bays


Cement Storage Silo

Packing Machine/Packing Plant

 

Air Polution Control Equipment:

Electrostatic Precipitators (ESP) will be provided to cement mill and Power plant.  

The major pollutants expected from the power plant will be PM, SO2 and NOx. ESPs to cooler and CPP, bag house to kiln/raw mill and coal mill and bag filters to cement mill and packing plants will be provided to control the SPM emissions below 50 mg/m3. 

Effective pollution control measures will  be provided to control the emissions from the Cement Plant & Boiler:

• Reverse Air bag house (RABH) shall

be provided for Kiln/Raw Mill.

• Bag House shall be provided to  Cement Grinding Section.

• Low NOX burners to reduce NOX  generation.

• Highly efficient ESP’s to arrest dust

 Fugitive emissions from Limestone handling, coal handling, clinker hopper, storage silos, weight feeders, grinding mills and packing machines will be controlled by providing covered sheds for storage of raw materials, fully covered conveyors for transportation of materials, etc. 

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

All transfer points also will have Bag Filters. The emissions from all the Pollution Control Equipment will be restricted to less than 50 mg/nm3

 

DG Set : . 2 X 6 MW  

DG sets   will be installed for stand by arrangement..

Silencer (Acoustic enclosures) to be provided to D.G.

 

Cooling Tower

Compressors

Air Conditioning Plant

Pumps

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust storage bin through a Pneumatic Conveying system. 


Water Treatment Plant

Sand Filter, Iron Filter, ACF, DM Plant,Tube Settlers etc.

Pumps Valves, Custom Pipeline Work 

Water requirement will be 3500 m3/Day for both cement plant and power plant. 

 

Source of Water: The water requirement will be met

from from nearby River..  

 

Effluent Treatment Plant

No industrial wastewater will be generated from the cement plant.

Wastewater will be generated from captive power plant, which will be treated in ETP.

 

The waste generated during the construction phase will be segregated into non-biodegradable and biodegradable wastes and managed accordingly. The non-biodegradable wastes are further classified into metal scraps, plastics and combustibles, which will be sold and/or disposed appropriately. During operation phase of the proposed project, the municipal waste generation will be handled scientifically

 

All the treated wastewater will be used for Ash conditioning, dust suppression, green belt development. Oil & grease will be removed and treated in a neutralization pit. The dust collected from the various air pollution control measures like bag houses/filters, ESPs etc. will be totally recycled in the process for cement manufacturing. Fly ash will be pneumatically transported to the cement plant to be used in the cement manufacturing.

 

Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Cement Grouting Pumps, Air Pollution Control Equipments, Gear Boxes,  Cooling Tower, Blowers, E.O.T.Cranes, Hydraulic Equipments, Complete Laboratory Equipments, Water line Valve, Pump, Storage Tank, Vessels, Pipeline etc. etc. 

Fire fighting System as per TAC norms. 

Green Belt Development plan in 35 % area and a scheme for Rainwater Harvesting have to be put in place.. 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed, Substation-Control Panel- Electrical Work,Elevators, Plumbing Work, Structural Steel Fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Rotary Klin, Air Slides, Air Blasters, Heat Exchanger, Clinker Grinder Unit, Grate Coolers, High Efficiency Separators, Cement Grouting Pumps, Air Pollution Control  Equipments, Gear Boxes,  Water Treatment Plant,  Effluent Treatment Plant , Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. etc.   may  Contact for Specified Enquiry at :

 

Jai Bhole Cement Combine Private Limited
Prop : ZAWAR GROUP
B/105, Kalpataru Plaza, 224, Bhavani Peth
Pune - 411042, Maharashtra, India
--------------------------------------------
Tel : + 91-20-26386856/ 26386857
Fax :+ 91-20- 26388520
----------------------------------------------
Email      : jaib...@zawar.co.in/ con...@zawar.co.in

Website : www.zawar.co.in

 

*****************************

               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                   http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:
                 Company's Name
                      Address/ Phone/ Fax
                      Contact person's Name

                      E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

 

Nov1812.jpg
Reply all
Reply to author
Forward
0 new messages