N.V. Distilleries Plans to Set Up 120 KLD Distillery with CPP

813 views
Skip to first unread message

Industrial Directory Of India

unread,
Aug 21, 2012, 12:19:29 PM8/21/12
to industrialdir...@googlegroups.com

             “New Projects This Week" 

                   RELEASED : ISSUE AUGUST 19 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

   

     N.V. Distilleries Plans to Set  Up

      120 KLD  Distillery with  CPP

                                      

NV Distilleries & Breweries (North East) Pvt. Ltd. 

(a subsidiary of NV Group)  plans to set  up  a 120 KLPD Grain based Distillery along along with and 11 MW Captive Plant at Village Chilam & Udham Bigha, Tehsil :Sherghati, District: Gaya, Bihar.

 

This plant will produce ENA (Extra Neutral Alcohol), RS (Rectified Spirit) & Ethanol.

 

Capacity :

Distillery                   : 120 KLD

Captive Power Plant : 11 MW

Bottling Plant

 

By Product

DDGS(Distilleries Dried Grain with Solubles)

 

CO2 Recovery Plant:

CO2 will be recovered in CO2 recovery plant and will be given to Bottling Plant.

 

 

Location : Village: Chilam & Udham Bigha,

                Tehsil: Sherghati, District: Gaya,Bihar

                    

As 0n  August 21, 2012 : The Project is  under Planning Stage.

 

Total plot area is 25.313 ha.

 

6.01 ha land  will be required for project.

 Greenbelt will be developed in 2.0 ha of the area.

 

IMPORTANT: As per the discussion we had on 16.08.2012 with NV Distilleries & Breweries (North East) Pvt. Ltd.   the Project is under Panning Stage now.

 

The project work is yet to start.

 

The Project   is Scheduled to be  Completed in One Year from the date of the commencement of Project Work,ie. Latest by March, 2014 .

 So, this is the RIGHT TIME to contact  and Follow Up at following address obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

-----------------------------------------------------------

The Main Scope of Supply includes:

Boiler        : 75 TPH

Fuel                       : Rice Husk/ Coal

 

Heat Exchanger, Air Pre- Heater/ Economiser

 

Raw Material :

Grains (maize, corn, sorghum grain, broken rice and starch based gains) will be used as raw materials.

 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

 

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

To control the particulate emissions from the Rice Husk and Coal  Fired boiler will be controlled by ESP/Bag Filter and emissions will be dispersed through Stack of Suitable Height.

 

Steam generated from the boiler will be utilized in the generation of

 11 MW Power and wil also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

After Air Pre Heaters flue gases will pass through an Electro Static Precipitator where the Dust Particles will be  collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 50 ug/Nm3 through a Chimney of prescribed height.

The dust will be  collected from the bottom of the ESP.

 

High pressure superheated steam from boiler will pass through a Steam Turbine and at the lower pressure will go to the condenser.

The part of the steam will be extracted from the extraction points provided on the turbine, which will be used for distillery.

 

The condensed steam will return to the steam boiler as condensate and will again be boiled as steam.

 

While passing through the turbine, the high pressure and temperature steam will rotate the turbine rotor and an Electric Alternator mounted on the same shaft.

 

Electric power will be generated by the alternator. This electric power generated will be consumed in house i.e. for running the distillery and utilities like boilers auxiliaries etc. and surplus power will be exported to the state grid.

To control the particulate emissions from the Rice Husk and Coal  Fired boiler will be controlled by ESP/Bag House and emissions will be dispersed through Stack of Suitable Height.

 

DG set : DG sets (3 Nos) will be  installed for emergency power 

                      Back-up during power failure:

 

 DG sets :   1250 KVA -  2 Nos *( Stack Height : 8 mt. Each)

                   500 KVA -    1 No  *( Stack Height : 7 mt.)

                                                *Above Roof Level

                         Fuel : HSD

Pollution Control by Adequate stack height/ Acoustic

----------------------------------------------------------------

 

Water Treatment Plant

(Oxidisation Chamber, , IRF, Activated Carbon Filter, DM Plant,

 R.O. Plant etc.)

 

Pumps Valves, Custom Pipeline Work

 

The fresh water requirement of the proposed project is estimated as

1680 m3/day.

Water will be sourced from Ground Water as well as the Recycle Water.

  

Effluent Treatment Plant

Spent wash will be restricted to 6 KL/KL of alcohol production.

Spent wash will be passed through decanter and then thin slop from decanter will be dried in Multi-Effect evaporator (MEE) followed by dryer upto 90% solids w/w to form DDGS and sold to outside parties.

 

Non-process effluent like DM Plant regeneration water and boiler blow down will be neutralized in neutralization tanks and mixed with cooling tower blow down and used for green belt development. No effluent will be discharged outside the premises and Zero discharge will be adopted.

 

Domestic effluent will be treated in septic tank followed by soak pit. A spent wash storage lagoons (5 days capacity) will be provided.   

Fly ash generated (47520 TPA by coal or 25344 TPA) will be managed safely in brick manufacturers/cement plants.  DWGS will be sold as cattle feed. Waste oil will be sold to authorized recyclers/re-processors.

 

 Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in  2.0 ha and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :


NV Distilleries & Breweries (North East) Pvt. Ltd.
10th Floor, Vandana Building,

11, Tolstoy Marg,

New Delhi- 110001, India

---------------------------------------

 Tel:  +91-11-43107000

 Fax: +91-11-43107070/ 43107071

--------------------------------------------

 Website: www.nvgroup.co.in

 -------------------------------------------------------------------------              

        

FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

     Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

                  http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

             with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online


 

Aug1912.jpg
Reply all
Reply to author
Forward
0 new messages