Astec Lifescience Plans For Expansion Of its Pharmaceutical Unit

121 views
Skip to first unread message

Industrial Directory Of India

unread,
Dec 30, 2015, 1:22:32 AM12/30/15
to industrialdir...@googlegroups.com
   Industrial Directory of India.Com 

    Released
                 "New Projects This Week" 

                   RELEASED : ISSUE DECEMBER 27 /15 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

(Helpline : +91-900 7158 600/ 900 7742 600)  

                     New Project 

                                                  

       Astec Lifescience Plans For

Expansion Of its Agro-Chemical Unit

==================================== 
                          Refer our Weekly  Project Report 
                                       20.12.2015
===================================     

Astec Lifescience Ltd.  plans to expand the production capacity of its Pesticides and Chemical intermediates manufacturing Unit from 219 Ton/Month to 880.94 Ton/Month (that includes expansion of existing manufacturing capacity and manufacturing of new products) at Mahad MIDC in Raigad District, Maharashtra.


 

Capacity Expansion :  

 

Pesticides and Chemical intermediates

From 219 Ton/Month to 880.94 Ton/Month       

It includes expansion of existing manufacturing capacity and manufacturing of new products.   

Location : Mahad MIDC, Raigad District

                 Maharashtra

 

**************************************

As on  December 29, 2015 : The Project is under Planning Stage .

 

The expansion will come up on its existing Factory Area :13950 sq. meter of Area.


Existing Green Belt Area: 3500 sq. meter.

Proposed Green Belt Area: 1100 sq. meter.

Total Green Belt Area: 4600 sq. meter.

(33% of plot area)

  

IMPORTANT: As per the the discussion we had

on 08.12.2015 with Astec Lifescience Ltd.  

the Project  is  under Panning Stage.

 

The company is  waiting for Environmental Clearance.


The Project   is Scheduled to be  Completed 

in 12 - 18 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time 

and to submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

1. Boiler : 5 TPH  - 1 No.

Fuel   :  Coal       

Stack :  Height- 50 Meters

2. Boiler : 1 TPH  - 2 Nos.

Fuel   :  FO      

Stack :  Height- 25 Meters

3.Thermic Fluid Heater 

Capacity : 6.0 Lakh K.Cal/Hr - 1 No.

Fuel   :  FO 

4.Thermic Fluid Heater 

Capacity : 2.0 Lakh K.Cal/Hr - 1 No.

Fuel   :  FO 

  

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Polution Control:

Cyclone &  Bag filter

Cyclone & Bag filter will be used as APCM. 

 

************************

Existing Status of Heating Equipment:

Presently the company is  operating  the Boilers of  following Capacity: 

1.Boiler 

Capacity : 6 TPH - 1 No.

Fuel   :  Coal      

Stack :  Height- 50 Meters

2.Boiler
Capacity : 2.5 TPH - 1 No.

Fuel   :  Coal      

Stack :  Height- 30 Meters

3.Boiler
Capacity : 850 Kg/hr - 1 No.

Fuel   :  FO      

Stack :  Height- 25 Meters

Note : 2.5 TPH Boiler will be replaced by New boiler with capacity of 5 TPH.

************************

Other Equipments:

Reaction Vessel

Dryer

---------------------------------------------

Chilling Water plant

---------------------------------------------

Scrubbers(single stage)         

-----------------------------------------------

Cooling Tower           

----------------------------------------------

DM/R.O. plant          

---------------------------------------------

Air Compressor              

----------------------------------------------

Effluent Treatment Plant   

----------------------------------------------

Solvents Pumps (SS/PP)                         

----------------------------------------------

HDPE Storage Tanks             

-----------------------------------------------------

MS/SS Solvent Storage Tanks

-----------------------------------------------------

Weighing Balance 

----------------------------------------------

Fire Hydrant System 

 

**************************

DG set (new) :  Proposed - Capacity : 500 KVA  

DG set (existing)  :  250 KVA -  1 No. & 125 KVA -  2 Nos.                                           

           

All existing DG Sets will be replaced by New DG of capacity 500 KVA..

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The Total Water requirement after expansion  will be 915 m3/Day.

Out of this Fresh Water :  747.9 m3/Day

(Present Consumption : 203.5 m3/Day

 

************************************************************************

 

Details of Water Consumption

1.Domestic                                 : 17   M3/Day

2.Process Water                        :  140  M3/Day

3.Boiler & Cooling Tower             :  735  M3/Day

4. Gardening                                23   M3/Day

---------------------------------------------------------------------------------------

                       Total:    915 M3/ Day

Recycled Water : - 167.1 m3/ Day 

(150+13.6+3.5)

---------------------------------------------------------------------------------------         :

 Fresh Water    :  747.9 M3/ Day


Details of Waste Water Discharge

1.Domestic                                 : 13.6   M3/Day

2.Process Water                        :  114  M3/Day

3.Boiler & Cooling Tower             :  43  M3/Day

4. Gardening                                -----

---------------------------------------------------------------------------------------

                              Total:  170.6 M3/ Day

 

  ********************************************************

Waste Water Treatment Plant:

Trade effluent generated from the expansion project will be 157 m3/Day

High TDS will be treat in MEE followed by ATFD and Low TDS will be treat in ETP plant consisting primary, secondary and tertiary treatment with RO unit for permeate will be recycled and effect zero liquid discharge (ZLD). 

The sewage generated due to domestic activities will be treated in STP of 157 m3/Day capacity and treated water will be reused for gardening. 


Effluent Treatment Plant:

Capacity : 250 m3/ Day


ETP is designed to treat 214 m3 / day of effluent. The treatment to the stream 

is in the following sequence.


Physico-Chemical Treatment:

The treatment include the following

1) Oil and Grease trap

2) Equalization cum neutralization tank

3) Acid/Alkali dosing

4) Effluent transfer pump

5) Flash mixture

6) Primary Settling tank

7) Bioreactor –I

8) Secondary settling Tank –I

9) Bioreactor –II

10) Secondary Settling Tank –II 

11) Sludge Drying bed


BIOLOGICAL TREATMENT

The biological treatment, (Activated Sludge Treatment) consists of following units;

1) Secondary clarifier tank-1

2) Secondary clarifier tank-2

 

************************************************************************

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Astec Lifescience Ltd.  

Elite Square, 7th Floor, 274, Perin Nariman Street

Fort,  Mumbai - 400001, Maharashtra, India

-------------------------------------------------

Tel              : +91-22- 61205600/ 22618212

Fax             : +91-22- 22618289

Email          :   in...@astecls.com 

Website      :   www.astecls.com


**************************************   

            New Projects

 **************************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

       



Dec2715.jpg
Reply all
Reply to author
Forward
0 new messages