Swaraj India Agro Plans For Sugar, Distillery & Co-Gen Power Plant

2,390 views
Skip to first unread message

Industrial Directory Of India

unread,
Jun 4, 2014, 1:34:47 AM6/4/14
to industrialdir...@googlegroups.com
            “New Projects This Week" 

                   RELEASED : ISSUE JUNE 01 /14 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

 

     Swaraj India Agro Plans For

 Sugar, Distillery & Co-Gen Power Plant


Swaraj India Agro Limited  plans for  a New  Sugar Plant having Capacity of  4400 TCD, a Molasses Based Distillery  having Capacity of  60 KLPD along with a Bagasse Based   Co-generation Power Plant of  22.5 MW at Upalve Village, Taluka: Phaltan in Satara District, Maharashtra.

Capacity:

Sugar Plant               4400 TCD

Distillery                   : 60 KLPD

 Co-Gen Power Plant : 22.5 MW

Co-Gen Power 19.5 MW + Back Pressure Steam 3 MW = 22.5 MW) 

 

Location : 

Upalve Village, Taluka: Phaltan 

Satara District, Maharashtra

 

As on  June 04, 2014The  Project is in planning stage.

 

Total site area is  63 Acres.

An area of about  33% of the total project area will be developed with green belt.

 

IMPORTANT: As per the discussion we had on 21.05.2014 with   

Swaraj India Agro Limited  the Project is in planning stage.

         

The company is waiting for Environmental clearances . 

 

 

The Project  is Scheduled to be  Completed in Two years from the date of commencement of project work.

 

*****************************

The Main Scope of Supply includes:

Boiler : 30 TPH  - 1 No.

Fuel : Bagasse  : During Cane crushing season :  1,62,355 Ton (160 Days)                                                                                                                                                                            During Off-Season season      :     42,926 Ton (55 Days)


Note : Concentrated spent wash (120 KL/Day) will be used in 30 TPH Slop Fired Boiler for steam generation and 

it will be used for processing in distillery & power generation of 3 MW.

 

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 

Air Pollution Control Equipment :

The sources of emissions from the proposed  sugar & cogen plant

shall be boiler of 30 TPH (1 No.) based .

 

 Adequate air pollution control equipment in the form of Electro static

Precipitator shall be provided for the proposed boilers of 30 TPH capacity (01 Nos.).

 

 In this regard State-of-the-art ESP’s will be installed to boiler to bring down the SPM to < 50 mg/Nm3.


Unloading areas will be provided with water sprinklers to prevent the fugitive dust. All conveyors will be completely covered with GI sheets. Ash will be stored in silo and sold directly to brick & Cement manufacturer

 

 

Steam Turbine  : 20 MW

 

Coal handling system

Ash handling system

Ash handling system collecting ash from furnace, Combustion chamber ,Economiser, air heater and wet scrubber shall be transported by

Belt Conveyors to a Silo to be provided.

Turbo Alternator :

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

 

Manufacturing Process : Sugar Plant

 

The process of manufacturing process:

 

1. Extraction of juice (Crushing)

2. Clarification of juice

3. Concentration of juice (juice to syrup) by evaporation

4. Boiling of Syrup to grain (crystallization)

5. Separation of crystals from mother liquor (Centrifuging)

 

Cane receiving

Sugarcane Weighment

 

Sugarcane Unloading:  The cart cane will be manually unloaded directly to the cane carrier.

The cane from the trucks and tractor- trailers will be unloaded with the help of cane un-loader crane. The cane will be unloaded on to the feeder table.

 

Sugarcane Conveying:

The cane from the feeder table will be  then dumped to the main cane carrier, which conveys the cane to the cane preparatory devices.

Electronic devices, depending on the cane-crushing

rate control the speed of the cane carrier, and level in the cane carrier etc.

 

Sugarcane preparation:

The sugar cane will be passed through the cane preparatory devices called leveller, cutter and fibriser where in the cane is cut into small pieces to expose the juice cells for extraction. The preparatory index is about 85-90 %.

 

Milling:

The prepared cane will then be passing through the milling tandem having

4 mills of three rollers  and necessary feeding device.

 The mills will be  running  at about 4.5 to 6.0 RPM driven through hydraulic motors or DC variable speed drives.

 

The mills loaded hydraulically extract juice from the cane and is subjected for the extraction of juice aided by maceration water and compound imbibition.

 

 The cane will be conveyed between mills with the help of rake type mechanical Conveyors.

 

Screens then will  filter the extracted juice and filtered juice is pumped for further processing.

The fibrous residue after juice extraction known as bagasse will be withdrawn from the last mill and conveyed through drag type steel conveyors to boiler for steam generation. Surplus bagasse will be withdrawn from the conveyor and stored for reuse when necessary.

The bagasse conveyor also has return conveyor to feed the stored bagasse.

 

DISTILLERYAlcohol Manufacturing  Process

1. Dilution - Preparation of molasses for fermentation

2. Fermentation - Production of alcohol from fermentable

    sugars in molasses solution

3. Distillation - Product Recover

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

Cooling Tower

Storage Tanks

 within the distillery premises.

 

DG set

One Additial Dg Set will be installed for stand by arrangement..

Silencer (Acoustic enclosures) to be provided to D.G.)

 

Clarifier :

Vacuum Filter

Injection pumps

Sugar Receiving Gross Hopper

Sugar Belt Conveyor

Fluidised Bed Sugar Dryer.

Bottling Plant

Dryer

Multiple Effect Evaporators

Centrifugal Machines

CO2 Recovery Plant (In future)

Water storage tanks

Piping works

Weigh bridge

Air compressor

 

Water Treatment Plant, Effluent Treatment Plant,

Oxidisation Chamber,Filter, R.O. / D.M. Plant.

Pumps Valves, Custom Pipeline Work

---------------------------------------------

 

Water consumption

 1. Sugar Plant 

        100 m3/day Season : 160 days)


2. Co-Gen Power Plant

     1310 m3/day Season : 160 days)

      1595 m3/day Off-Season: 55days)

     

3. Distillery

       720 m3/day Total  : 270 days)

                                                     

Total water will be Sourced from  Banganga Dam (Kuravali Village) in Satara District, Maharashtra.


***************************** 

Effluent Treatment System and Scheme

Capacity : 400 m3/Day

Industrial wastewater system from Cogeneration unit

shall be separated into two systems.

 

1.Plant Drain System

2. Neutralization and Chemical Drain system


Effluent from power plant such as boiler blow down, DM Plant, CT blow down will be treated in Effluent treatment Plant (ETP) having capacity 400 m3/day.

 

The plant drain system is collecting / shall collect and treat the wastewater from the floors, area wash downs, drainage from the turbine and boiler areas as well as equipment drains. Drains, which potentially could contain oil and grease, are / shall be routed to an oil/water separating system. The system   shall divert oil or grease removed to a separate collection drum. The waste oil and grease collected shall be disposed of as via and approved waste oil scavenger service for recycling or disposal.

The neutralization and chemical drain system is collecting / shall collect & neutralize

regeneration waste from the boiler feed water blow down, if found necessary. It shall also collect and treat as it is and caustic waste from the de-mineralized water production plant and bulk chemical storage area drains, chemical feed area drains, along with wash down water collected from these areas.


The neutralization tank is / shall be sized from one and one half times the nominal volume of the demineralised regeneration waste of one demineralised train. The neutralization basin is / shall be internally coated with the computable with the acid and caustic waste.

 

A neutralization and chemical drain system is / shall be operated on automatic batch wise basis. After the neutralization tank reaches specified level, wastewater shall be neutralized by an automatic pH control system.

 

The wastewater generated from the Distillery plant will be segregated as process effluent and non process effluent to adopt separate treatment schemes. 


Spent wash will be generated as process wastewater from the distillation column. The other wastewater from the plant include, cooling tower blow down, water treatment plant regeneration, floor washings and domestic wastewater.


Treated waste water will be used for gardening, dust suppression system, irrigation, manure making

process etc. to achieve zero effluent discharge. Bagasse based ash will be sold to brick & cement manufacturer.

Generated spent wash after following multistage evaporation process, incinerated in furnace (slope fire boiler) to achieve zero discharge.

 

Other Equipment

 

Material Handling Equipment : Conveyor, Hydraulic Equipment 

DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials.

Straight Line Steam Tunnel

Pneumatic Piston Filler

Pressure Filler

Storage Tank, Hoses,Cables

Ventilation & Exhaust System                  

Complete Laboratory Equipments

 Fire fighting System as per TAC norms,

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33%  area and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery plant.   may  Contact for Specified Enquiry at :

Swaraj India Agro Limited

A/p. Nimbhore, Tal- Phaltan

Satara- 415523 Maharashtra, India 

————————————————————————————.

Tel : + 91-2166- 262064/262164

Fax :+ 91-2166- 262164

Email      : in...@swarajindia.co.in/purc...@swarajindia.co.in

Website : www.swarajindia.co.in

 

*****************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

              http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                     Contact person's Name

                     E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

 

Jun0114.jpg
Reply all
Reply to author
Forward
0 new messages