Shreenath Chemical Industries Plans to set up 284 Ton/Month Dyes manufacturing unit.................

138 views
Skip to first unread message

Industrial Directory Of India

unread,
May 16, 2019, 12:27:39 PM5/16/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 12 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Shreenath Chemical Industries Plans to set up

 284 Ton/Month Dyes manufacturing unit

 ====================================        

 Shreenath Chemical Industries  plans to set  up a 

Dyes manufacturing unit having Capacity of 284 Ton/Month

at GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat..

 Capacity :  284 Ton/Month                 

The plant will have a production capacity of:

 

Para Amino Azobenzene Sulphonic Acid           142   Ton/Month                    

Direct Orange-39                                                   71   Ton/Month        

irect Orange-34                                                     71   Ton/Month   

-------------------------------------------

Total:              284  Ton/Month                          

 

Location : GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat.

 

**************************************

As on  May 16, 2019 : The Project is under Planning Stage .

 

Total site area is  5000 Sq. Meter.

An area of about  1650 Sq. Meter   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 10.05.2019 with Shreenath Chemical Industries  

the Project  is  under Panning Stage.

 

The company is waiting still for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12-15 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 1 TPH  - 1 No.

Fuel   :  Bio Coal      

Heat Exchangers, Air Pre-heater/Economiser)

Hot Air Generator : 1 Lac/Kcal  - 1 No.

Fuel   :  Bio Coal     

Wet Scrubber for arresting fly ash

 

Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

For Boilers Cyclone &  Bag filter  will be provided with 32 Meter of Stack. 

 

Single Stage Scrubber  will be also be provided.

 

************************

Other Equipments:

SS Reactor

Dryer

---------------------------------------------

Chilling Water plant

---------------------------------------------

Scrubbers(single stage)         

-----------------------------------------------

DM/R.O. plant          

---------------------------------------------

Air Compressor              

----------------------------------------------

Effluent Treatment Plant   

----------------------------------------------

Solvents Pumps (SS/PP)                         

----------------------------------------------

HDPE Storage Tanks             

-----------------------------------------------------

MS/SS Solvent Storage Tanks

-----------------------------------------------------

Weighing Balance 

----------------------------------------------

Fire Hydrant System 

 

**************************

DG sets :  125 KVA1 No.

                                 

For back up in the common areas as well as for essential services

above Two D.G.sets will be installed..

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

52.98 m3/Day.,

 

The source of water supply for the project will be from  Bore well and water tankers.

 

************************************************************************

 

Details of Water Consumption

1.Domestic                                 : 1.60  M3/Day

2.Process Water                        :  32.28  M3/Day

3.Boiler Make up                         : 9.0  M3/Day

4. Cooling  Tower(make up)       : ................

5. Gardening                                  6.6  M3/Day

6. Washings                                :  3.00. M3/Day

7. others                                      :  0.50   M3/Day

---------------------------------------------------------------------------------------

                       Total:  52.98 M3/ Day

 

Details of Waste Water Discharge

1.Domestic                                 : 1.30  M3/Day

2.Process Water                        :  56.89  M3/Day

3.Boiler Blow Down                        : 0.45  M3/Day

4. Cooling  Tower(make up)       : ................

5. Gardening                                 ..............

6. Washings                                :  3.00. M3/Day

7. others                                      :  0.50   M3/Day

---------------------------------------------------------------------------------------

                              Total:  62.14 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 70 m3/ Day

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 62.14 m3 / day of effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 


The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.


FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused


HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.


LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in  1650 Sq. Meter   of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Shreenath Chemical Industries  

Plot No. 5902/1, GIDC Industrial Estate, Ankleshwar, 

Bharuch - 393002, Gujarat, India

---------------------------------------------------

Mob: 09925001901 Email: sa...@shreenath.biz  Website: www.shreenath.biz


            New Projects

 

**************************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------


Industrial Directory Of India

unread,
May 18, 2019, 4:16:21 AM5/18/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 12 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Glaxon Pharama LLP Plans to set up

 51 Ton/Month Bulk Drug manufacturing unit

 ====================================        

 Glaxon Pharma LLP  plans to set  up a 

Bulk Drug manufacturing unit having Capacity of 51 Ton/Month

at GIDC Ankleshwar in Bharuch District, Gujarat..

 Capacity :  51 Ton/Month                 

The plant will have a production capacity of:

Nifedipine, Glimepiride &  Other Product                      50   Ton/Month                    

Clobetasole Butyrate                                               1  Ton/Month        

i-------------------------------------------

Total:              51  Ton/Month                          

 

Location : GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat.

 

**************************************

As on  May 18, 2019 : The Project is under Planning Stage .

 

Total site area is  4800 Sq. Meter.

An area of about  1600 Sq. Meter   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 10.05.2019 with Glaxon Pharma  

the Project  is  under Panning Stage.

 

The company is waiting still for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 1.5 TPH  - 1 No.

Fuel   :  Briquette      

Heat Exchangers, Air Pre-heater/Economiser)

Thermic Fluid Heater : 2 Lac/Kcal  - 1 No.

Fuel   :  Briquette     

Wet Scrubber for arresting fly ash

 

Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

For Boilers Cyclone &  Bag filter  will be provided

 

Single Stage Scrubber  will be also be provided.

 

************************

Other Equipments:

SS Reactor

Dryer

---------------------------------------------

Chilling Water plant

---------------------------------------------

Cooling Tower  

---------------------------------------------  

Scrubbers(single stage)         

-----------------------------------------------

DM/R.O. plant          

---------------------------------------------

Air Compressor              

----------------------------------------------

Effluent Treatment Plant   

----------------------------------------------

Solvents Pumps (SS/PP)                         

----------------------------------------------

HDPE Storage Tanks             

-----------------------------------------------------

MS/SS Solvent Storage Tanks

-----------------------------------------------------

Weighing Balance 

----------------------------------------------

Fire Hydrant System 

 

**************************

DG sets :  500 KVA1 No.

                                 

For back up in the common areas as well as for essential services

above Two D.G.sets will be installed..

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

43.30 m3/Day.,

 

The source of water supply for the project will be from  Bore well and water tankers.

 

************************************************************************

 

Details of Water Consumption

1.Domestic                                 : 1.00  M3/Day

2.Process Water                        :  28  M3/Day

3.Boiler Make up                         : 5  M3/Day

4. Cooling  Tower(make up)    : 5  M3/Day   : ................

5. Gardening                               2  M3/Day

6. Washings                                :  1.00. M3/Day

7. Scrubbing                               :  1.30   M3/Day

---------------------------------------------------------------------------------------

                       Total:  43.30 M3/ Day

 

Details of Waste Water Discharge

1.Domestic                                 : 0.8  M3/Day

2.Process Water                        :  25.40  M3/Day

3.Boiler Blow Down                    : 1  M3/Day

4. Cooling  Tower(make up)    : 1  M3/Day   : ................

5. Gardening                               0

6. Washings                                :  1.00. M3/Day

7. Scrubbing                               :  2.00   M3/Day

---------------------------------------------------------------------------------------

                              Total:  32.20 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 30 m3/ Day

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 32.20 m3 / day of effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 


The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.


FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused


HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.


LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in  1600 Sq. Meter   of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Glaxon Pharma LLP  

Plot No. 3302, G.I.D.C, Ankleshwar, Bharuch - 393002, Gujarat, India,

---------------------------------------------------

Mob: 09824193241 Email: galaxy_...@yahoo.co.in

Industrial Directory Of India

unread,
May 23, 2019, 12:18:38 PM5/23/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 19 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Cosmic Pigment & Intermediate Plans to set up

 2900 Ton/Month Dyes manufacturing unit

 ==================================== 
                                 First Info :   January 2019
=======================================================       

 Cosmic Pigment & Intermediates  plans to set  up a 

Dyes manufacturing unit having Capacity of 2900 Ton/Month

at its Unit  II at Lunej in Anand District, Gujarat.

 Capacity :  2900 Ton/Month 

=====================

Project Cost : Rs.20 Crores 

 

Location :   Unit  II at Lunej in Anand District, Gujarat.  .

 

**************************************

As on  May 23, 2019 : The Project is under Planning Stage .

 

Total site area is  20538 Sq. Meter.

An area of about  6358 Sq. Meter   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 10.05.2019 with Cosmic Pigment & Intermediates  

the Project  is  under Panning Stage.

 

The company is waiting still for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 5 TPH  - 1 No.

Fuel   :  Briquette      

Heat Exchangers, Air Pre-heater/Economiser)

Thermic Fluid Heater : 2 Lac/Kcal  - 1 No.

Fuel   :  Briquette     

Hot Air Generator : 2 Lac/Kcal  - 1 No.

Fuel   :  PNG 

Wet Scrubber for arresting fly ash

 

Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

For Boilers Multi Cyclone Seperator &  Bag filter  will be provided

 

Single Stage Scrubber/ Spray Dyer  will be also be provided.

DG sets :  250 KVA2 Nos.

                                 

For back up in the common areas as well as for essential services

above Two D.G.sets will be installed..

 

Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

1001 m3/Day.,

 

The source of water supply for the project will be from  Bore well and water tankers.

 

************************************************************************

 

Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Industrial                               :  961  M3/Day...............

5. Gardening                            20  M3/Day

---------------------------------------------------------------------------------------

                       Total:  1001.00 M3/ Day

 

Details of Waste Water Discharge

1.Domestic                                 : 15 M3/Day

2.Industrial                                :  705  M3/Day

---------------------------------------------------------------------------------------

                              Total:  720 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Reverse Osmosis Plant

 Waste water will be treated Effluent Treatment Plant (ETP) of primary treatment, secondary & tertiary treatment facility with RO & MEE. 310 KLD of dilute stream of effluent will be treated in ETP and RO permeate @ 210 KLD will be reused in process. 490 KLD of Concentrated stream of effluent (Process: 390 KLD + RO Reject: 100 KLD) will be treated in ETP and sent to own MEE, 473 KLD MEE condensate will recycled.


FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused


HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.


LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in   6358    Sq. Meter   of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Cosmic Pigment & Intermediates   

Survey No.238 Khambhat, Village Lunej, Anand - 388620, Gujarat, Indiaa,

---------------------------------------------------

Mob: 09825322742 Email: ektafar...@gmail.com

Industrial Directory Of India

unread,
May 24, 2019, 12:35:34 PM5/24/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 19 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Ishanga Life Science Plans to set up

 193 Ton/Month Pharma & Intermediate Product unit

 ====================================        

 Ishanga Life Science Pvt. Ltd.  plans to set  up a 

Pharma & Intermediate Product manufacturing unit having Capacity of 193 Ton/Month

at Madhvas, Tal : Kalol in Panchmahal District, Gujarat.

 Capacity :  193 Ton/Month    

 

Location :  Madhvas, Tal : Kalol in Panchmahal District, Gujarat.  .

 

**************************************

As on  May 24, 2019 : The Project is under Planning Stage .

 

Total site area is  6378 Sq. Meter.

An area of about  33%   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 15.05.2019 with Ishanga Life Science Pvt. Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting still for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 3 TPH  - 1 No.

Fuel   :  Coal ( in case of Non availability  of Bio-Coal)= 7 MT/Day - at 40% of Load     

Heat Exchangers, Air Pre-heater/Economiser)

DG sets :  600 KVA1 No.

                                 

For back up in the common areas as well as for essential services

above Two D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

222 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers.

 ************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Process Water                        :  85  M3/Day

3.Boiler Make up                         : 30  M3/Day

4. Cooling  Tower(make up)    : 40  M3/Day   : ................

5. Gardening                               10  M3/Day

6. Washings                                : 27. M3/Day

7. Other                               :         10  M3/Day

---------------------------------------------------------------------------------------

                       Total:  222 M3/ Day

    ********************************************************

Effluent Treatment Plant:

Capacity : 200 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 177 KLD of effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 


The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused


HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.


LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 Green Belt Development plan is  33 %   of  area and a scheme for Rainwater Harvesting have to be put in place.                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Ishanga Life Science Pvt. Ltd.  

Mahesh Plastic, Plot No. 701/A, GIDC Estate Halol, Panchmahals - 389350, Gujarat, India,

---------------------------------------------------

Tel: +91-2676-223702. Email: maheshpla...@gmail.com

Industrial Directory Of India

unread,
May 27, 2019, 8:49:57 AM5/27/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 26 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Shikhara Laboratories Plans to set up

 108 Ton/Month Bulk Drug & Intermediates manufacturing unit

 ====================================        

 Shikara Laboratories Pvt. Ltd.   plans to set  up a 

Bulk Drug & Intermediates manufacturing unit having Capacity of 108 Ton/Month

at Kakirala in Guntur District, Andhra Pradesh..

 Capacity :  108 Ton/Month     

 

Location :  Kakirala in Guntur District, Andhra Pradesh  .

 

**************************************

As on  May 27, 2019 : The Project is under Planning Stage .

 

Total site area is  48157.59 Sq. Meter(11.90 Acres).

An area of about  33% of Total Area   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 15.05.2019 with Shikara Laboratoris Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project Work is likely to start in Q4 of 2019.


The Project   is Scheduled to be  Completed by

in 12 o 18 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 6 TPH  - 2 Nos. (1 W + 1S)

Fuel   :  Coal /Briquette/ Fire Woods      

Heat Exchangers, Air Pre-heater/Economiser)

DG sets :  500 KVA3 Nos.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

329 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 12  M3/Day

2.Process Water                        : 80  M3/Day

3.Boiler Make up                         : 150  M3/Day

4. Cooling  Tower(make up)    : 40  M3/Day   : ................

5. Green Belt                              40  M3/Day

6. Washings                                :  5.00. M3/Day

7.Laboratory                               :  2   M3/Day

---------------------------------------------------------------------------------------

                       Total:  329 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 : 10  M3/Day

2.Process Water                        : 80  M3/Day

3.Boiler Blow Down                    : 10  M3/Day

4. Cooling  Tower(make up)    : 8  M3/Day   : ................

5. Green Belt                             --  M3/Day

6. Washings                                :  4.5. M3/Day

7.Laboratory                               :  2   M3/Day

---------------------------------------------------------------------------------------

                              Total:  114.50 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 100 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 114.50 KLD effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 

The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused

HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.

LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in  33%   of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Shikara Laboratories Pvt. Ltd.  

H. No 6-2-668, Plot No.B-600, LIG, Phase-II, Vanasthalipuram Hyderabad - 500070, Telangana, India,

---------------------------------------------------

Mob: 08106110666 Email: shikha...@gmail.com

Industrial Directory Of India

unread,
May 30, 2019, 10:32:25 PM5/30/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 26 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Shreeji Pesticides Plans to set up

 26700 TPA Technical Grade Pesticides manufacturing unit

 ====================================        

 Shreeji Pesticides Pvt. Ltd.   plans to set  up a 

Technical Grade Pesticides manufacturing unit having Capacity of 26700 TPA and  Pesticides Intermediates of 4400 TPA at GIDC Dahej in Bharuch District, Gujarat.

 Capacity :  26700 TPA  Technical Grade Pesticide

                         4400 TPA      Pesticides    Intermediates  

===================================

Project Cost :   Rs.170 Crore

================================

 Location :   GIDC Dahej in Bharuch District, Gujarat.    .

 

**************************************

As on  May 30, 2019 : The Project is under Planning Stage .

 

Total site area is  100272.418 Sq. Meter(11.02 Ha).

An area of about  33% of Total Area   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 21.05.2019 with Shreeji Pesticides Pvt. Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project Work is likely to start in by End of 2019.


The Project   is Scheduled to be  Completed by

in 18 to 24 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 15 TPH  - 3 Nos. 

Fuel   :  NG      

Thermic Fluid Heater : 1 No. -  Fuel   :  NG   

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

A Stack height of  45 Meter  will be provided in order to achieve norms prescribed by statutory authority.

DG sets :  750 KVA4 Nos.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

1445 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 30  M3/Day

2.Process Water                        : 435  M3/Day

3.Boiler Make up                         : 480  M3/Day

4. Cooling  Tower(make up)    : 460  M3/Day   : ................

5. Gardening                             25  M3/Day

6. Washings                                :  15.00. M3/Day

---------------------------------------------------------------------------------------

                       Total:  1445 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 : 24  M3/Day

2.Process Water                        : 174  M3/Day

3.AFTD                                     : 245.52 M3/Day

4. Boiler                                 : 86  M3/Day   : ................

5. Washings                                15. M3/Day

---------------------------------------------------------------------------------------

                              Total:  544.45 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 500 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 544.45 KLD effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 

The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused

HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.

LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in  33%   of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Shreeji Pesticides Pvt. Ltd.  

Block No. 69/P, Taluk Savli, Manjusar, Vadodara - 391775, Gujarat, India,

---------------------------------------------------

Tel: +91-2667-264702

Email: in...@shreejipesticides.com 

Website : www.shreejipesticides.com

Industrial Directory Of India

unread,
Jun 2, 2019, 9:19:10 AM6/2/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE JUNE 02 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Synergia Sciences Plans to set up

 757.20 TPA Insecticides manufacturing unit

 ====================================        

 Synergia Sciences Pvt. Ltd.   plans to set  up a 

Various Insecticides (for Veterinary Animal Health and  Household Use) manufacturing unit having Capacity of 757.20 TPA at Village : Indrad, Taluka -Kadi, Mehsana District, Gujarat.

 Capacity :  757.20 TPA  Insecticides

                         ===================================

Project Cost :   Rs.43 Crore

================================

 Location :    Village : Indrad, Taluka -Kadi, Mehsana District, Gujarat.  .    .

 

**************************************

As on  June 02, 2019 : The Project is under Planning Stage .

 

Total site area is  1,920 Sq. Meter.

An area of about  33% of Total Area   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 24.05.2019 with Synergia Sciences Pvt. Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 18 to 24 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 2 TPH  - 1 No. 

Fuel   :  Agro Waste / Coal      

Thermic Fluid Heater : 1 Lac/Kcal  - 1 No.

Fuel   :  Agro Waste / Coal  

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

A Stack height of  15 Meter  will be provided in order to achieve norms prescribed by statutory authority.

DG sets :  500 KVA1 No.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

137 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 6  M3/Day

2.Industrial Use                        : 124.5  M3/Day..............

5. Gardening                               6.5  M3/Day

---------------------------------------------------------------------------------------

                       Total:  137 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 : 5  M3/Day

2.Industrial Use                        : 43  M3/Day..............

5. Gardening                              .....

---------------------------------------------------------------------------------------

                              Total:  48 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 50 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 50 KLD effluent (wastewater) will be  generated f

 Synergia Sciences Pvt. Ltd.    

501, E-wing, Skypark CHSL, Next to HDFC house, Oshiwara Garden Road,

Off. S. V. Road, Goregaon, Mumbai-400104. Maharashtra, India 

---------------------------------------------------

Tel : +91-22-67304000    Fax: +91-22-67304100

Email: in...@synergiasciences.com Website: www.synergiasciences.com    

Industrial Directory Of India

unread,
Jun 7, 2019, 1:05:19 PM6/7/19
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE June 02 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Amma Life Sciences Plans to set up

 108 Ton/Month Bulk Drug & Intermediates manufacturing unit

 ====================================        

 Ammma Life Sciences  plans to set  up a 

Bulk Drug & Intermediates manufacturing unit having Capacity of 108 Ton/Month

at Minchalapadu, Kakirala Village, Durgi Mandal in Guntur District, Andhra Pradesh..

 Capacity :  108 Ton/Month     

 

Location :   Minchalapadu, Kakirala Village, Durgi Mandal in Guntur District, Andhra Pradesh  .

 

**************************************

As on  June 07, 2019 : The Project is under Planning Stage .

 

Total site area is  57060.68 Sq. Meter(14.10 Acres).

An area of about  33% of Total Area   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 03.06.2019 with Amma Life Sciences.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 o 15 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 6 TPH  - 2 Nos. (1 No will be opearational)

320 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 12  M3/Day

2.Process Water                        : 71  M3/Day

3.Boiler Make up                         : 150  M3/Day

4. Cooling  Tower(make up)    : 40  M3/Day   : ................

5. Green Belt                              40  M3/Day

6. Washings                                :  5.00. M3/Day

7.Laboratory                               :  2   M3/Day

---------------------------------------------------------------------------------------

                       Total:  320 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 : 10  M3/Day

2.Process Water                        : 71  M3/Day

3.Boiler Blow Down                    : 10  M3/Day

4. Cooling  Tower(make up)    : 8  M3/Day   : ................

5. Green Belt                             --  M3/Day

6. Washings                                :  4.5. M3/Day

7.Laboratory                               :  2   M3/Day

---------------------------------------------------------------------------------------

                              Total:  105.50 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 100 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 105.50 KLD effluent (wastewater) will be  generated f

Ammma Life Sciences    

Sy. No:557/A, Flat No:204, Sree Sai Brundavanam, Opp: Police Station,

 Durgi Village & Mandal, Guntur - 522612, Andhra Pradesh, India,

---------------------------------------------------

Mob : 09052288345 Email : ammalife...@gmail.com

Industrial Directory Of India

unread,
Jun 19, 2019, 11:07:20 AM6/19/19
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE June 16 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Reliance Rasayan Plans to set up

 2,850 Ton/Month Bulk Drug  manufacturing unit

 ====================================        

 Reliance Rasayan Pvt. Ltd.  plans to set  up a 

Bulk Drug manufacturing unit having Capacity of 2,850 Ton/Month and R&D  Products manufacturing unit 

having Capacity of 200 Kgs/Month

at G.I.D.C. Naroda in Ahmedabad, Gujarat..

Capacity :  2850 Ton/Month  + 200 Kgs/Month   

 

Location :    G.I.D.C. Naroda in Ahmedabad, Gujarat  .

 

**************************************

As on  June 19, 2019 : The Project is under Planning Stage .

 

Total site area is  57060.68 Sq. Meter(14.10 Acres).

An area of about  33% of Total Area   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 15.06.2019 with Reliance Rasayan Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 to 15 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 2 TPH  - 1 No. 

Fuel   :  Natural Gas      

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 

Reaction Vessel  will be also be provided. 

DG sets :  125 KVA1 No.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

23.95 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 2  M3/Day

2.Process Water                        : 1,45  M3/Day

3.Boiler Make up                         : 6  M3/Day

4. Cooling  Tower(make up)    :9  M3/Day   : ................

5. Water Treatment                   2  M3/Day

6. Washings                                 1. M3/Day

7.Scrubber                               :  0.5   M3/Day

8. Green Belt                             :  2 M3/Day

---------------------------------------------------------------------------------------

                       Total:  23.95 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 :1.750  M3/Day

2.Process Water                        : 1,95  M3/Day

3.Boiler Blow Down                  : 1  M3/Day

4. Cooling  Tower                   :3  M3/Day   : ................

5. Water Treatment                   2  M3/Day

6. Washings                                 1. M3/Day

7.Scrubber                               :  0.5   M3/Day

8. Green Belt                             :  00 M3/Day

---------------------------------------------------------------------------------------

                              Total:  11.20 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 20 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 11.20 KLD effluent (wastewater) will be  generated f

Reliance Rasayan Pvt. Ltd.     

Plot No. 15-J, Phase-III,

G.I.D.C. Naroda, Ahmedabad - 382330, Gujarat, India,

---------------------------------------------------

Mob: 09825047354 Tel: +91-79-29701875.Email:  rrpl...@gmail.com 

Industrial Directory Of India

unread,
Jul 17, 2019, 2:35:22 AM7/17/19
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE JULY 14 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7742 600/ 900 7158 600) 

                     New Project

 BEC Chemicals Plans to set up

 2,375 Ton/Month Pharmaceuticals  manufacturing unit

 ====================================        

 BEC Chemicals Pvt. Ltd.  plans to set  up an 

Active Pharmaceuticals Ingredient s and Intermediates manufacturing unit having Capacity 

of 2,375 Ton/Month at GIDC Saykha In Bharuch District, Gujarat....

Capacity :  2,375 Ton/Month 

========================  

 Project Cost : Rs.102 Crores

Location :    GIDC Saykha In Bharuch District, Gujarat...  .

 

**************************************

As on  July 17, 2019 : The Project is under Planning Stage .

 

Total site area is  23,466 Sq. Meter.

An area of about  7744  Sq. Meter    will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 12.07.2019 with BEC Chemicals Pvt. Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed 

by December, 2020.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 10 TPH  - 1 No. 

Fuel   :  Coal      

Heat Exchangers, Air Pre-heater/Economiser)

Thermic Fluid Heater : 2 Lac/Kcal : 1 No. 

(Fuel :  LDO )

   

Wet Scrubber for arresting fly ash

 Air Polution Control: Cyclone Separator + Bag Filters

The emissions from the boilers will be passed through Cyclone Separator followed by bag filters before releasing into atmosphere

through a chimney of 32 Meter..

DG sets :  1000 KVA2 Nos.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

750 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

1.Domestic                                 : 14  M3/Day

2.Process Water                        : 400  M3/Day

3.Boiler Make up                         :160  M3/Day

4. Cooling  Tower(make up)    :154  M3/Day   : ................

5. Hot water Generator               1 M3/Day

6. Gardening                              :  21M3/Day

---------------------------------------------------------------------------------------

                       Total:  750 M3/ Day

 Details of Waste Water Discharge

1.Domestic                                 : 10  M3/Day

2.Process Water                        : 280  M3/Day

3.Boiler Make up                         :50  M3/Day

4. Cooling  Tower(make up)    :20  M3/Day   : ................

-----------------------------------------------------------------------------------------

                              Total:  360 M3/ Day

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 400 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 360 KLD effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 

The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused

HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.

LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in   7744  Sq. Meter     of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

BEC Chemicals Pvt. Ltd.     

Plot No. 24, MIDC, Roha, Village Dhatav,Raigad - 402116, Maharashtra, India 

-------------------------------------------------

Tel: +91-2194-263551.Website: www.becchemicals.com    

Industrial Directory Of India

unread,
Jul 25, 2019, 1:44:59 AM7/25/19
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE JULY 21 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7742 600/ 900 7158 600) 

                     New Project

 R A Chem Pharma Organics Plans to set up

 550 Ton/Month Pigment & Dyes manufacturing unit

 ====================================        

 R A Chem Pharma Organics Industries  plans to set  up an 

Pigment & Dyes manufacturing unit having Capacity 

of 550 Ton/Month at Village: Neja, Taluka Khambhat, in Anand District, Gujarat.....

Capacity :  550 Ton/Month 

========================  

 Project Cost : Rs.4.5 Crores

Location :    Village: Neja, Taluka Khambhat, in Anand District, Gujarat....  . 

**************************************

As on  July 24, 2019 : The Project is under Planning Stage .

 

Total site area is  8802 Sq. Meter.

An area of about  2911.15 Sq. Meter    will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 12.07.2019 with  R A Chem Pharma Organics Industries    

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed 

by within 12 Months from the date of commencement of the project.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 2 TPH  - 1 No. 

Fuel   :  Briquette/ Bio Coal     

Heat Exchangers, Air Pre-heater/Economiser)

Thermic Fluid Heater : 10 Lac/Kcal : 1 No. 

(Fuel :  

Briquette/ Bio Coal

 )

   

DG sets :  250 KVA1 No.

                               

For back up in the common areas as well as for essential services

above D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

55.5 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Water Consumption

(Fresh water= 49.5 KLD + Reuse water= 6 KLD).

---------------------------------------------------------------------------------------

                       Total:  55.5 M3/ Day

 

Details of Waste Water Discharge

(33.23 KL/day Industrial + 1.5 KL/day domestic)   : ................

-----------------------------------------------------------------------------------------

                              Total:  34.87 KLD

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 35 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 34.87 KLD effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 

The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused

HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.

LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan in    2911.15 Sq. Meter   Meter     of  area and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Ramanbhai A. Patel

R A Chem Pharma Organic Industries  

Survey No. 454,Village: Neja, Taluka Khambhat, Anand - 388620, Gujarat, India 

-------------------------------------------------

Mob.: 09825307794  Email : ramanp...@yahoo.in/ rapharmachemlg53@gmail,com   

Industrial Directory Of India

unread,
Aug 16, 2019, 11:53:18 AM8/16/19
to industrialdir...@googlegroups.com
Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE AUGUST 11 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7742 600/ 900 7158 600) 

                     New Project

 Popular Molecules Plans to set up

 30 Ton/Month Bulk Drugs & Inermediate manufacturing unit

 ====================================        

 Popular Molecules Private Ltd.  plans to set  up an 

Pigment & Dyes manufacturing unit having Capacity 

of 30 Ton/Month at its Unit-II at APIIC Industrial Park, Gajulamandyam in Chittoor District, Andhra Pradesh....

Capacity :  30 Ton/Month 

========================  

 Project Cost : Rs.8.0 Crores

Location :     APIIC Industrial Park, Gajulamandyam in Chittoor District, Andhra Pradesh  .  . 

**************************************

As on  August 16, 2019 : The Project is under Planning Stage 

The Company has purchased a sick unit by name M/S Siri Biotechnologies Limited from APSFC in auction.

 

Total area of the unit is 1 acre. The unit proposed to establish this unit with common infrastructure sharing with their own unit , Unit II which is about 150 meters distance from this unit on the same road.

  

IMPORTANT: As per the the discussion we had

on 12.08.2019 with  Popular Molecules Private Ltd.    

the Project  is  under Panning Stage.

 

The company is waiting  for Environmental Clearance.


The Project   is Scheduled to be  Completed 

by within 12 Months from the date of commencement of the project.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 2 TPH  - 1 No. Fuel   : Coal    

Boiler : 1 TPH  - 1 No. Fuel   :  Coal    

Heat Exchangers, Air Pre-heater/Economiser)

Thermic Fluid Heater : 2 Lac/Kcal : 1 No. 

(Fuel :  

HSD

 )

   

61.5 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers. 

************************************************************************

 Details of Waste Water Discharge

-----------------------------------------------------------------------------------------

                              Total:  36.50 KLD

 

  ********************************************************

Effluent Treatment Plant:

Capacity : 35 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 36.50 KLD effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 

The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused

HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.

LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 

Green Belt Development plan and a scheme for Rainwater Harvesting have to be put in place.

                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Popular Molecules Private Ltd.  

S7-1-78/1/B, 1st Floor, Anna Dorai Chowdary Street, Ameerpet, Dharamkharam Road, 

Hyderabad - 500016, Telangana, India

-------------------------------------------------

Mob: 09490491902 Email: popula...@gmail.com   

Reply all
Reply to author
Forward
0 new messages