RELEASED : ISSUE MAY 12 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Shreenath Chemical Industries Plans to set up
284 Ton/Month Dyes manufacturing unit
Shreenath Chemical Industries plans to set up a
Dyes manufacturing unit having Capacity of 284 Ton/Month
at GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat..
Capacity : 284 Ton/Month
The plant will have a production capacity of:
Para Amino Azobenzene Sulphonic Acid 142 Ton/Month
Direct Orange-39 71 Ton/Month
irect Orange-34 71 Ton/Month
-------------------------------------------
Total: 284 Ton/Month
Location : GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat.
**************************************
As on May 16, 2019 : The Project is under Planning Stage .
Total site area is 5000 Sq. Meter.
An area of about 1650 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 10.05.2019 with Shreenath Chemical Industries
the Project is under Panning Stage.
The company is waiting still for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12-15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boilers Cyclone & Bag filter will be provided with 32 Meter of Stack.
Single Stage Scrubber will be also be provided.
************************
Other Equipments:
SS Reactor
Dryer
---------------------------------------------
Chilling Water plant
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
DM/R.O. plant
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG sets : 125 KVA - 1 No.
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
52.98 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 1.60 M3/Day
2.Process Water : 32.28 M3/Day
3.Boiler Make up : 9.0 M3/Day
4. Cooling Tower(make up) : ................
5. Gardening 6.6 M3/Day
6. Washings : 3.00. M3/Day
7. others : 0.50 M3/Day
---------------------------------------------------------------------------------------
Total: 52.98 M3/ Day
Details of Waste Water Discharge
1.Domestic : 1.30 M3/Day
2.Process Water : 56.89 M3/Day
3.Boiler Blow Down : 0.45 M3/Day
4. Cooling Tower(make up) : ................
5. Gardening ..............
6. Washings : 3.00. M3/Day
7. others : 0.50 M3/Day
---------------------------------------------------------------------------------------
Total: 62.14 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 70 m3/ Day
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 62.14 m3 / day of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 1650 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Shreenath Chemical Industries
Plot No. 5902/1, GIDC Industrial Estate, Ankleshwar,
Bharuch - 393002, Gujarat, India
---------------------------------------------------
Mob: 09925001901 Email: sa...@shreenath.biz Website: www.shreenath.biz
New Projects |
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
Released |
RELEASED : ISSUE MAY 12 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Glaxon Pharama LLP Plans to set up
51 Ton/Month Bulk Drug manufacturing unit
Glaxon Pharma LLP plans to set up a
Bulk Drug manufacturing unit having Capacity of 51 Ton/Month
at GIDC Ankleshwar in Bharuch District, Gujarat..
Capacity : 51 Ton/Month
The plant will have a production capacity of:
Nifedipine, Glimepiride & Other Product 50 Ton/Month
Clobetasole Butyrate 1 Ton/Month
i-------------------------------------------
Total: 51 Ton/Month
Location : GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat.
**************************************
As on May 18, 2019 : The Project is under Planning Stage .
Total site area is 4800 Sq. Meter.
An area of about 1600 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 10.05.2019 with Glaxon Pharma
the Project is under Panning Stage.
The company is waiting still for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boilers Cyclone & Bag filter will be provided .
Single Stage Scrubber will be also be provided.
************************
Other Equipments:
SS Reactor
Dryer
---------------------------------------------
Chilling Water plant
---------------------------------------------
Cooling Tower
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
DM/R.O. plant
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG sets : 500 KVA - 1 No.
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
43.30 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 1.00 M3/Day
2.Process Water : 28 M3/Day
3.Boiler Make up : 5 M3/Day
4. Cooling Tower(make up) : 5 M3/Day : ................
5. Gardening 2 M3/Day
6. Washings : 1.00. M3/Day
7. Scrubbing : 1.30 M3/Day
---------------------------------------------------------------------------------------
Total: 43.30 M3/ Day
Details of Waste Water Discharge
1.Domestic : 0.8 M3/Day
2.Process Water : 25.40 M3/Day
3.Boiler Blow Down : 1 M3/Day
4. Cooling Tower(make up) : 1 M3/Day : ................
5. Gardening 0
6. Washings : 1.00. M3/Day
7. Scrubbing : 2.00 M3/Day
---------------------------------------------------------------------------------------
Total: 32.20 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 30 m3/ Day
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 32.20 m3 / day of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 1600 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Glaxon Pharma LLP
Plot No. 3302, G.I.D.C, Ankleshwar, Bharuch - 393002, Gujarat, India,
---------------------------------------------------
Mob: 09824193241 Email: galaxy_...@yahoo.co.in
Released |
RELEASED : ISSUE MAY 19 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Cosmic Pigment & Intermediate Plans to set up
2900 Ton/Month Dyes manufacturing unit
Cosmic Pigment & Intermediates plans to set up a
Dyes manufacturing unit having Capacity of 2900 Ton/Month
at its Unit II at Lunej in Anand District, Gujarat.
Capacity : 2900 Ton/Month
=====================
Project Cost : Rs.20 Crores
Location : Unit II at Lunej in Anand District, Gujarat. .
**************************************
As on May 23, 2019 : The Project is under Planning Stage .
Total site area is 20538 Sq. Meter.
An area of about 6358 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 10.05.2019 with Cosmic Pigment & Intermediates
the Project is under Panning Stage.
The company is waiting still for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boilers Multi Cyclone Seperator & Bag filter will be provided .
Single Stage Scrubber/ Spray Dyer will be also be provided.
DG sets : 250 KVA - 2 Nos.
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
1001 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Industrial : 961 M3/Day...............
5. Gardening 20 M3/Day
---------------------------------------------------------------------------------------
Total: 1001.00 M3/ Day
Details of Waste Water Discharge
1.Domestic : 15 M3/Day
2.Industrial : 705 M3/Day
---------------------------------------------------------------------------------------
Total: 720 M3/ Day
********************************************************
Effluent Treatment Plant:
Reverse Osmosis Plant
Waste water will be treated Effluent Treatment Plant (ETP) of primary treatment, secondary & tertiary treatment facility with RO & MEE. 310 KLD of dilute stream of effluent will be treated in ETP and RO permeate @ 210 KLD will be reused in process. 490 KLD of Concentrated stream of effluent (Process: 390 KLD + RO Reject: 100 KLD) will be treated in ETP and sent to own MEE, 473 KLD MEE condensate will recycled.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 6358 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Cosmic Pigment & Intermediates
Survey No.238 Khambhat, Village Lunej, Anand - 388620, Gujarat, Indiaa,
---------------------------------------------------
Mob: 09825322742 Email: ektafar...@gmail.com
Released |
RELEASED : ISSUE MAY 19 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Ishanga Life Science Plans to set up
193 Ton/Month Pharma & Intermediate Product unit
Ishanga Life Science Pvt. Ltd. plans to set up a
Pharma & Intermediate Product manufacturing unit having Capacity of 193 Ton/Month
at Madhvas, Tal : Kalol in Panchmahal District, Gujarat.
Capacity : 193 Ton/Month
Location : Madhvas, Tal : Kalol in Panchmahal District, Gujarat. .
**************************************
As on May 24, 2019 : The Project is under Planning Stage .
Total site area is 6378 Sq. Meter.
An area of about 33% will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 15.05.2019 with Ishanga Life Science Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting still for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
DG sets : 600 KVA - 1 No.
For back up in the common areas as well as for essential services
above Two D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
222 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 20 M3/Day
2.Process Water : 85 M3/Day
3.Boiler Make up : 30 M3/Day
4. Cooling Tower(make up) : 40 M3/Day : ................
5. Gardening 10 M3/Day
6. Washings : 27. M3/Day
7. Other : 10 M3/Day
---------------------------------------------------------------------------------------
Total: 222 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 200 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 177 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan is 33 % of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Ishanga Life Science Pvt. Ltd.
Mahesh Plastic, Plot No. 701/A, GIDC Estate Halol, Panchmahals - 389350, Gujarat, India,
---------------------------------------------------
Tel: +91-2676-223702. Email: maheshpla...@gmail.com
Released |
RELEASED : ISSUE MAY 26 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Shikhara Laboratories Plans to set up
108 Ton/Month Bulk Drug & Intermediates manufacturing unit
Shikara Laboratories Pvt. Ltd. plans to set up a
Bulk Drug & Intermediates manufacturing unit having Capacity of 108 Ton/Month
at Kakirala in Guntur District, Andhra Pradesh..
Capacity : 108 Ton/Month
Location : Kakirala in Guntur District, Andhra Pradesh .
**************************************
As on May 27, 2019 : The Project is under Planning Stage .
Total site area is 48157.59 Sq. Meter(11.90 Acres).
An area of about 33% of Total Area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 15.05.2019 with Shikara Laboratoris Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project Work is likely to start in Q4 of 2019.
The Project is Scheduled to be Completed by
in 12 o 18 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
DG sets : 500 KVA - 3 Nos.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
329 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 12 M3/Day
2.Process Water : 80 M3/Day
3.Boiler Make up : 150 M3/Day
4. Cooling Tower(make up) : 40 M3/Day : ................
5. Green Belt 40 M3/Day
6. Washings : 5.00. M3/Day
7.Laboratory : 2 M3/Day
---------------------------------------------------------------------------------------
Total: 329 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 M3/Day
2.Process Water : 80 M3/Day
3.Boiler Blow Down : 10 M3/Day
4. Cooling Tower(make up) : 8 M3/Day : ................
5. Green Belt -- M3/Day
6. Washings : 4.5. M3/Day
7.Laboratory : 2 M3/Day
---------------------------------------------------------------------------------------
Total: 114.50 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 100 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 114.50 KLD effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Shikara Laboratories Pvt. Ltd.
H. No 6-2-668, Plot No.B-600, LIG, Phase-II, Vanasthalipuram Hyderabad - 500070, Telangana, India,
---------------------------------------------------
Mob: 08106110666 Email: shikha...@gmail.com
Released |
RELEASED : ISSUE MAY 26 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Shreeji Pesticides Plans to set up
26700 TPA Technical Grade Pesticides manufacturing unit
Shreeji Pesticides Pvt. Ltd. plans to set up a
Technical Grade Pesticides manufacturing unit having Capacity of 26700 TPA and Pesticides Intermediates of 4400 TPA at GIDC Dahej in Bharuch District, Gujarat.
Capacity : 26700 TPA Technical Grade Pesticide
4400 TPA Pesticides Intermediates
===================================
Project Cost : Rs.170 Crore
================================
Location : GIDC Dahej in Bharuch District, Gujarat. .
**************************************
As on May 30, 2019 : The Project is under Planning Stage .
Total site area is 100272.418 Sq. Meter(11.02 Ha).
An area of about 33% of Total Area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 21.05.2019 with Shreeji Pesticides Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project Work is likely to start in by End of 2019.
The Project is Scheduled to be Completed by
in 18 to 24 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
A Stack height of 45 Meter will be provided in order to achieve norms prescribed by statutory authority.
DG sets : 750 KVA - 4 Nos.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
1445 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 30 M3/Day
2.Process Water : 435 M3/Day
3.Boiler Make up : 480 M3/Day
4. Cooling Tower(make up) : 460 M3/Day : ................
5. Gardening 25 M3/Day
6. Washings : 15.00. M3/Day
---------------------------------------------------------------------------------------
Total: 1445 M3/ Day
Details of Waste Water Discharge
1.Domestic : 24 M3/Day
2.Process Water : 174 M3/Day
3.AFTD : 245.52 M3/Day
4. Boiler : 86 M3/Day : ................
5. Washings 15. M3/Day
---------------------------------------------------------------------------------------
Total: 544.45 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 500 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 544.45 KLD effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Shreeji Pesticides Pvt. Ltd.
Block No. 69/P, Taluk Savli, Manjusar, Vadodara - 391775, Gujarat, India,
---------------------------------------------------
Tel: +91-2667-264702.
Email: in...@shreejipesticides.com
Website : www.shreejipesticides.com
Released |
RELEASED : ISSUE JUNE 02 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Synergia Sciences Plans to set up
757.20 TPA Insecticides manufacturing unit
Synergia Sciences Pvt. Ltd. plans to set up a
Various Insecticides (for Veterinary Animal Health and Household Use) manufacturing unit having Capacity of 757.20 TPA at Village : Indrad, Taluka -Kadi, Mehsana District, Gujarat.
Capacity : 757.20 TPA Insecticides
===================================
Project Cost : Rs.43 Crore
================================
Location : Village : Indrad, Taluka -Kadi, Mehsana District, Gujarat. . .
**************************************
As on June 02, 2019 : The Project is under Planning Stage .
Total site area is 1,920 Sq. Meter.
An area of about 33% of Total Area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 24.05.2019 with Synergia Sciences Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 18 to 24 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
A Stack height of 15 Meter will be provided in order to achieve norms prescribed by statutory authority.
DG sets : 500 KVA - 1 No.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
137 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 6 M3/Day
2.Industrial Use : 124.5 M3/Day..............
5. Gardening 6.5 M3/Day
---------------------------------------------------------------------------------------
Total: 137 M3/ Day
Details of Waste Water Discharge
1.Domestic : 5 M3/Day
2.Industrial Use : 43 M3/Day..............
5. Gardening .....
---------------------------------------------------------------------------------------
Total: 48 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 50 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 50 KLD effluent (wastewater) will be generated f
Synergia Sciences Pvt. Ltd.
501, E-wing, Skypark CHSL, Next to HDFC house, Oshiwara Garden Road,
Off. S. V. Road, Goregaon, Mumbai-400104.
Maharashtra, India
---------------------------------------------------
Tel : +91-22-67304000 Fax: +91-22-67304100
Email: in...@synergiasciences.com Website: www.synergiasciences.com
Released |
RELEASED : ISSUE June 02 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Amma Life Sciences Plans to set up
108 Ton/Month Bulk Drug & Intermediates manufacturing unit
Ammma Life Sciences plans to set up a
Bulk Drug & Intermediates manufacturing unit having Capacity of 108 Ton/Month
at Minchalapadu, Kakirala Village, Durgi Mandal in Guntur District, Andhra Pradesh..
Capacity : 108 Ton/Month
Location : Minchalapadu, Kakirala Village, Durgi Mandal in Guntur District, Andhra Pradesh .
**************************************
As on June 07, 2019 : The Project is under Planning Stage .
Total site area is 57060.68 Sq. Meter(14.10 Acres).
An area of about 33% of Total Area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 03.06.2019 with Amma Life Sciences.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12 o 15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
320 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 12 M3/Day
2.Process Water : 71 M3/Day
3.Boiler Make up : 150 M3/Day
4. Cooling Tower(make up) : 40 M3/Day : ................
5. Green Belt 40 M3/Day
6. Washings : 5.00. M3/Day
7.Laboratory : 2 M3/Day
---------------------------------------------------------------------------------------
Total: 320 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 M3/Day
2.Process Water : 71 M3/Day
3.Boiler Blow Down : 10 M3/Day
4. Cooling Tower(make up) : 8 M3/Day : ................
5. Green Belt -- M3/Day
6. Washings : 4.5. M3/Day
7.Laboratory : 2 M3/Day
---------------------------------------------------------------------------------------
Total: 105.50 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 100 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 105.50 KLD effluent (wastewater) will be generated f
Ammma Life Sciences
Sy. No:557/A, Flat No:204, Sree Sai Brundavanam, Opp: Police Station,
Durgi Village & Mandal, Guntur - 522612, Andhra Pradesh, India,
---------------------------------------------------
Mob : 09052288345 Email : ammalife...@gmail.com
Released |
RELEASED : ISSUE June 16 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
New Project |
Reliance Rasayan Plans to set up
2,850 Ton/Month Bulk Drug manufacturing unit
Reliance Rasayan Pvt. Ltd. plans to set up a
Bulk Drug manufacturing unit having Capacity of 2,850 Ton/Month and R&D Products manufacturing unit
having Capacity of 200 Kgs/Month
at G.I.D.C. Naroda in Ahmedabad, Gujarat..
Capacity : 2850 Ton/Month + 200 Kgs/Month
Location : G.I.D.C. Naroda in Ahmedabad, Gujarat .
**************************************
As on June 19, 2019 : The Project is under Planning Stage .
Total site area is 57060.68 Sq. Meter(14.10 Acres).
An area of about 33% of Total Area will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 15.06.2019 with Reliance Rasayan Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed by
in 12 to 15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
Reaction Vessel will be also be provided.
DG sets : 125 KVA - 1 No.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
23.95 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 2 M3/Day
2.Process Water : 1,45 M3/Day
3.Boiler Make up : 6 M3/Day
4. Cooling Tower(make up) :9 M3/Day : ................
5. Water Treatment 2 M3/Day
6. Washings 1. M3/Day
7.Scrubber : 0.5 M3/Day
8. Green Belt : 2 M3/Day
---------------------------------------------------------------------------------------
Total: 23.95 M3/ Day
Details of Waste Water Discharge
1.Domestic :1.750 M3/Day
2.Process Water : 1,95 M3/Day
3.Boiler Blow Down : 1 M3/Day
4. Cooling Tower :3 M3/Day : ................
5. Water Treatment 2 M3/Day
6. Washings 1. M3/Day
7.Scrubber : 0.5 M3/Day
8. Green Belt : 00 M3/Day
---------------------------------------------------------------------------------------
Total: 11.20 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 20 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 11.20 KLD effluent (wastewater) will be generated f
Reliance Rasayan Pvt. Ltd.
Plot No. 15-J, Phase-III,
G.I.D.C.
Naroda, Ahmedabad - 382330, Gujarat, India,
---------------------------------------------------
Mob: 09825047354 Tel: +91-79-29701875.Email: rrpl...@gmail.com
Released |
RELEASED : ISSUE JULY 14 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
(Helpline : +91-900 7742 600/ 900 7158 600)
New Project |
BEC Chemicals Plans to set up
2,375 Ton/Month Pharmaceuticals manufacturing unit
BEC Chemicals Pvt. Ltd. plans to set up an
Active Pharmaceuticals Ingredient s and Intermediates manufacturing unit having Capacity
of 2,375 Ton/Month at GIDC Saykha In Bharuch District, Gujarat....
Capacity : 2,375 Ton/Month
========================
Project Cost : Rs.102 Crores
Location : GIDC Saykha In Bharuch District, Gujarat... .
**************************************
As on July 17, 2019 : The Project is under Planning Stage .
Total site area is 23,466 Sq. Meter.
An area of about 7744 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 12.07.2019 with BEC Chemicals Pvt. Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed
by December, 2020.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
(Fuel : LDO )
Air Polution Control: Cyclone Separator + Bag Filters
The emissions from the boilers will be passed through Cyclone Separator followed by bag filters before releasing into atmosphere
through a chimney of 32 Meter..
DG sets : 1000 KVA - 2 Nos.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
750 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 14 M3/Day
2.Process Water : 400 M3/Day
3.Boiler Make up :160 M3/Day
4. Cooling Tower(make up) :154 M3/Day : ................
5. Hot water Generator 1 M3/Day
6. Gardening : 21M3/Day
---------------------------------------------------------------------------------------
Total: 750 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 M3/Day
2.Process Water : 280 M3/Day
3.Boiler Make up :50 M3/Day
4. Cooling Tower(make up) :20 M3/Day : ................
-----------------------------------------------------------------------------------------
Total: 360 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 400 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 360 KLD effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 7744 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
BEC Chemicals Pvt. Ltd.
Plot No. 24, MIDC, Roha, Village Dhatav,Raigad - 402116, Maharashtra, India
-------------------------------------------------
Tel: +91-2194-263551.Website: www.becchemicals.com
Released |
RELEASED : ISSUE JULY 21 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600)
New Project |
R A Chem Pharma Organics Plans to set up
550 Ton/Month Pigment & Dyes manufacturing unit
R A Chem Pharma Organics Industries plans to set up an
Pigment & Dyes manufacturing unit having Capacity
of 550 Ton/Month at Village: Neja, Taluka Khambhat, in Anand District, Gujarat.....
Capacity : 550 Ton/Month
========================
Project Cost : Rs.4.5 Crores
Location : Village: Neja, Taluka Khambhat, in Anand District, Gujarat.... .
**************************************
As on July 24, 2019 : The Project is under Planning Stage .
Total site area is 8802 Sq. Meter.
An area of about 2911.15 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 12.07.2019 with R A Chem Pharma Organics Industries
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed
by within 12 Months from the date of commencement of the project.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
(Fuel :
Briquette/ Bio Coal)
DG sets : 250 KVA - 1 No.
For back up in the common areas as well as for essential services
above D.G.sets will be installed..
Water Treatment Plant:
The daily water demand of the proposed project will be around
55.5 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
(Fresh water= 49.5 KLD + Reuse water= 6 KLD).
---------------------------------------------------------------------------------------
Total: 55.5 M3/ Day
Details of Waste Water Discharge
(33.23 KL/day Industrial + 1.5 KL/day domestic) : ................
-----------------------------------------------------------------------------------------
Total: 34.87 KLD
********************************************************
Effluent Treatment Plant:
Capacity : 35 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 34.87 KLD effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 2911.15 Sq. Meter Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Ramanbhai A. Patel
R A Chem Pharma Organic Industries
Survey No. 454,Village: Neja, Taluka Khambhat, Anand - 388620, Gujarat, India
-------------------------------------------------
Mob.: 09825307794 Email : ramanp...@yahoo.in/ rapharmachemlg53@gmail,com
Released |
RELEASED : ISSUE AUGUST 11 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600)
New Project |
Popular Molecules Plans to set up
30 Ton/Month Bulk Drugs & Inermediate manufacturing unit
Popular Molecules Private Ltd. plans to set up an
Pigment & Dyes manufacturing unit having Capacity
of 30 Ton/Month at its Unit-II at APIIC Industrial Park, Gajulamandyam in Chittoor District, Andhra Pradesh....
Capacity : 30 Ton/Month
========================
Project Cost : Rs.8.0 Crores
Location : APIIC Industrial Park, Gajulamandyam in Chittoor District, Andhra Pradesh . .
**************************************
As on August 16, 2019 : The Project is under Planning Stage
The Company has purchased a sick unit by name M/S Siri Biotechnologies Limited from APSFC in auction.
Total area of the unit is 1 acre. The unit proposed to establish this unit with common infrastructure sharing with their own unit , Unit II which is about 150 meters distance from this unit on the same road.
IMPORTANT: As per the the discussion we had
on 12.08.2019 with Popular Molecules Private Ltd.
the Project is under Panning Stage.
The company is waiting for
Environmental Clearance.
The Project is Scheduled to be Completed
by within 12 Months from the date of commencement of the project.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
(Fuel :
)
61.5 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Waste Water Discharge
-----------------------------------------------------------------------------------------
Total: 36.50 KLD
********************************************************
Effluent Treatment Plant:
Capacity : 35 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 36.50 KLD effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Popular Molecules Private Ltd.
S7-1-78/1/B, 1st Floor, Anna Dorai Chowdary Street, Ameerpet, Dharamkharam Road,
Hyderabad - 500016, Telangana, India
-------------------------------------------------
Mob: 09490491902 Email: popula...@gmail.com