New Project Update |
Aceto Chem Plans to set up
Pesticide intermediates and specialty chemicals
in its Existing Unit
Capacity : From 600.08 Ton/Month to 2387.90 Ton/Month
Location : Unit – II, GIDC Estate, Pandesara Surat, Gujarat.
**************************************
As on March 12, 2019 : The Project is under Planning Stage .
Total site area is 1750 Sq. Meter.
An area of about 500 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 08.03.2019 with Aceto Chem Pvt. Ltd.
the Project is under Panning Stage.
The company is still waiting for Environment Clearances.
The Project is Scheduled to be Completed by
in 12-15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
************************
Other Equipments:
SS Reactor
Dryer
---------------------------------------------
Chilling Water plant
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
Cooling Tower
----------------------------------------------
DM/R.O. plant
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG sets : 250 KVA - 1 No.
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
140 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 10 M3/Day
2.Process Water : 45 M3/Day
3.Boiler Make up : 40 M3/Day
4. Cooling Tower(make up) : 20 M3/Day
5. Washings : 5. M3/Day
6. Scrubbing system : 10 M3/Day
---------------------------------------------------------------------------------------
Total: 140 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 M3/Day
2.Process Water : 41 M3/Day
3.Boiler Blow Down : 4. M3/Day
4. Cooling Tower(Blow Down) : 2 M3/Day
5. Washings : 4. M3/Day
6. Scrubbing system : 9 M3/Day
---------------------------------------------------------------------------------------
Total: 70 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 100 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 70 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 17864.94 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Aceto Chem Pvt. Ltd. (Unit-II)
Plot No. 274/3/1, GIDC Estate,
Pandesara, Surat -394 221, Gujarat, India
---------------------------------------------------
Tel : +91-261 –2890998/88
Email : r...@acetochemindia.com
Website : www.acetochemindia.com
New Projects |
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
Released |
RELEASED : ISSUE MARCH 10 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project Update |
Dyna Glycols Plans for Expansion
of its synthetic organic chemicals manufacturing unit
Capacity : 1,200 TPM to 3,000 TPM
Project Cost : Rs.7.52 Crores
Location : Sector 4, Kandla Special Economic Zone, Gandhidham in Kutch District, Gujarat.
**************************************
As on March 14, 2019 : The Project is under Planning Stage .
Total site area is 15930 Sq. Meter.
An area of about 5256.90 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 11.03.2019 with Dyna Glycols Private Limited..
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12-15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
Boiler – Coal shall be used as fuel Emission through chimney shall be as per norms. Cyclone dust collector followed by bag filtershall be installed as APCM. DG Set- HSD shall be used. Stack shall be provided and emission shall be within norms.. .
DG sets : 320 KVA - 1 No.
[Existing 125 KVA - 1 No.]
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
129 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 18.50 m3/day
2.Process Water : 27 m3/day
3.Boiler Make up : 15.50 m3/day
4. Cooling Tower(make up) :30 m3/day
5. Washings : 20 m3/Day
6. Garding : 18 m3/Day
---------------------------------------------------------------------------------------
Total: 129 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 M3/Day
2.Process Water : 2.5 M3/Day
3. Cooling Tower(Blow Down) :3 m3/day
5. Washings : 18. M3/Day
---------------------------------------------------------------------------------------
Total: 33.50 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 50 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 33.50 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 5256.90 Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Dyna Glycols Private Limited
Shivam Chambers, 106//108, 1st Floor, S.V. Road, Goregaon (W), Mumbai – 400 062, Maharashtra, India
---------------------------------------------------
Tel : +91-22-2676 4099/ 2676 4172 /73 Fax : +91-22-2676 4054
Email : rajee...@gmail.com
-------------------------------------------------
Consultant: Environment And Research Labs Private Limited, Registered 215, Royal Arcade, Char Rasta, Vapi - 396195, Gujarat. India
Tel: +91-260-2433966. Email: resp...@uerl.in Website: www.uerl.in
Released |
RELEASED : ISSUE MAY 09 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project Update |
Prasol Chemicals Plans for Expansion
of its synthetic organic chemicals manufacturing unit
Capacity Expansion :From 57,094 TPM to 148,400 TPM
Project Cost : Rs.50 Crores
Location : Khalapur in Raigad District, Maharashtra. .
**************************************
As on June 09, 2019 : The Project is under Planning Stage .
Total site area is 68,644 Sq. Meter.
An area of about 33% will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 03.06.2019 with Prasol Chemicals Private Limited..
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers yet to be appointed..
The Project is Scheduled to be Completed by
in 12-18 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Thermic Fluid Heater : 1 No.
(Fuel : Furnace Oil )
Air Polution Control:
Boiler – Coal shall be used as fuel Emission through chimney shall be as per norms. Mechanical dust collector followed by bag filtershall be installed as APCM. DG Set- HSD shall be used. Stack shall be provided and emission shall be within norms.. .
DG sets : 625 KVA - 1 No.
[Existing 250 KVA - 1 No. & 380 - 1 No]
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
1140 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 35 m3/day
2.Process Water : 63 m3/day
3.Boiler Make up & Cooling : 1024 m3/day
4. Gardening : 18 m3/Day
---------------------------------------------------------------------------------------
Total: 1140 M3/ Day
Details of Waste Water Discharge
1.Domestic : 27 M3/Day
2.Industrial : 364 M3/Day
---------------------------------------------------------------------------------------
Total: 391 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 400 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 391 KLD of effluent (wastewater) will be generated f
Prasol Chemicals Private Limited.
Plot No. A-17/2/3, T.T.C. Industrial Area, Khairne M.I.D.C., Thane Belapur Road, Navi Mumbai - 400710, Maharashtra, India
---------------------------------------------------
Tel : +91-22 61952500 Email: inq...@prasolchem.com Website : www.prasolchem.com
-
Released |
RELEASED : ISSUE JUNE 09 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project Update |
Aceto Chem Plans to set up
Pesticide intermediates and specialty chemicals
in its Existing Unit
Capacity : From 600.08 Ton/Month to 2387.90 Ton/Month
Location : Unit – II, GIDC Estate, Pandesara Surat, Gujarat.
**************************************
As on June 13, 2019 : The Project is under Planning Stage .
Total site area is 1750 Sq. Meter.
An area of about 500 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 10.06.2019 with Aceto Chem Pvt. Ltd.
Released |
RELEASED : ISSUE JUNE 16 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project |
Banstag Life Sciences Plans to set up
Chemical & API Manufacturing Unit
Capacity : 76.20 Ton/Day
Location : Ilage Malakpur, Tehsil Derabassi, District S.A.S. Nagar, Punjab..
**************************************
As on June 16, 2019 : The Project is under Planning Stage .
Total site area is 2.8 Acre.
An area of about 33% will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 12.06.2019 with Banstag Life Sciences Pvt. Ltd.
the Project is under Panning Stage.
The company is going to obtain Environment Clearances shortly.
Equipment has not yet been procured.
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures ( Multi Cyclone + Bag Filter+Water Scrubber ) will be provided in order to achieve norms prescribed by statutory authority.
************************
Other Equipments:
SS Reactor
Dryer
---------------------------------------------
Chilling Water plant : 45 TR
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
Cooling Tower -1000 TR & 500 TR
----------------------------------------------
DM/R.O. plant : 4m3/Hr
----------------------------------------------
Air Handling Plant : 20 TR
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG sets : 320 KVA, 150 KVA & 125 - 1 No. each
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
49.2 m3/Day.,
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
********************************************************
Effluent Treatment Plant:
Capacity : 20 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 18 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan 33% of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Banstag Life Sciences Pvt. Ltd.
Village-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, Punjab, India
---------------------------------------------------
Tel : +91-172-2543036
Released |
RELEASED : ISSUE JUNE 16 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project Update |
Vivanta Laboratories Plans for Expansion
Specialty chemicals manufacturing unit
Capacity : 20 TPM to 766 TPM
Project Cost : Rs.15.0 Crores
Location : Rangareddyguda village, Rajapur Mandal, Mahabubnagar District, Telangana
**************************************
As on June 21st, 2019 : The Project is under Planning Stage .
It will squire additional land of 9.575 acres in addition to existing 4.35 acres of land; total land area after expansion is 13.925 acres..
An area of about 33% will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 19.06.2019 with Vivanta Laboratories Pvt. Ltd...
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber
Thermic Fluid Heater : 2 Lac/Kcal : 1 No. (Fuel : Gas ) ..
Air Polution Control:
DG sets : 500 KVA - 2 Nos. ( Existing : 125 KVA - 1 No)
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
325.10 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 10 m3/day
2.Process Water : 72.10 m3/day
3.Boiler Make up : 60 m3/day
4. Cooling Tower(make up) :150 m3/day
5. Washings : 3 m3/Day
6. Gardening : 11 m3/Day
7. Scrubber : 3 m3/Day
8. DM Rejects : 15 m3/Day
9. OC & R&D : 1 m3/Day
---------------------------------------------------------------------------------------
Total: 325.10 M3/ Day
Details of Waste Water Discharge
1.Domestic : 9 m3/day
2.Process Water : 73,50 m3/day
3.Boiler Blow Down : 6 m3/day
4. Cooling Tower(make up) :22 m3/day
5. Washings : 3 m3/Day
6. Gardening : --------
7. Scrubber : 3 m3/Day
8. DM Rejects : 15 m3/Day
9. OC & R&D : 1 m3/Day
---------------------------------------------------------------------------------------
Total: 132.50 M3/ Day
-
********************************************************
Effluent Treatment Plant:
Capacity : 150 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 132.50 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Vivanta Laboratories Pvt Ltd.
8-3-229/D/97/4, 401, jubilee Hill Country, Road No. 11, jubilee hills, Hyderabad - 500 045, Telangana, India
---------------------------------------------------
Tel : +91-40-23540931.
Email: vivan...@gmail.com Website : www.vivantalabs.com
Released |
RELEASED : ISSUE JUNE 23 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project Update |
Creative Carbon Plans for
Resins and Laminated Sheets manufacturing unit
Capacity : Resin : 3157 Ton/Month & P.F.Moulding Powder(200 TPM)
Laminated Sheet : 800 Ton/Month ( 4 Lac pieces )
Location : Village : Kanera, Taluka : Kheda, District : Kheda, Gujarat.. ..
**************************************
As on June 26th, 2019 : The Project is under Planning Stage .
Total site area is 8,903 Sq. Meter.
An area of
50
Sq. Meter. has been allotted for storage of Hazardous Wastes
An area of about 33% will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 19.06.2019 with Creative Carbons Pvt. Ltd...
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Wet Scrubber
Thermic Fluid Heater : 12 Lac/Kcal : 1 No. (Fuel : Coal ) ..
Air Polution Control:
************************
Other Equipments:
SS Reactor
Dryer
Reaction Vassels(7KL: 5Nos,2KL: 5 Nos,1KL: 5Nos)
---------------------------------------------
Chilling Water plant
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
Cooling Tower
----------------------------------------------
DM/R.O. plant
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG set : 250 KVA - 1 No.
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
30.70 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 2.70 m3/day
2.Process Water : ................
3.Boiler Make up : 24 m3/day
4. Cooling Tower(make up) :1 m3/day
5. Washings : 1 m3/Day
6. Gardening : 2 m3/Day
---------------------------------------------------------------------------------------
Total: 30.70 M3/ Day
Details of Waste Water Discharge
1.Domestic : 2.70 m3/day
2.Process Water : 32.31 m3/day.
3.Boiler Make up : 1 m3/day
4. Cooling Tower : 0.500 m3/day
5. Washings : 1 m3/Day
6. Gardening : ..............
---------------------------------------------------------------------------------------
Total: 37.510 M3/ Day
-
********************************************************
Effluent Treatment Plant:
Capacity : 50 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 37.510 KLD of effluent (wastewater) will be generated f
Creative Carbons Pvt. Ltd.
207 - 208 Gagandeep Tower, Kocharab, Paldi,
Ahmedabad - 380006, Gujarat, India..
-------------------------------------------------
Tel : +91-79-26585065 Fax :+91-79-26585067
Email : creativ...@gmail.com Website : www.steelplantconsumable.com
Released |
RELEASED : ISSUE JULY 21 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project |
Prolife Chemopharma for Expansion
Synthetic Organic chemicals manufacturing unit
Capacity : 90 TPM to 270 TPM
Location :
GIDC Industrial Estate, Ankleshwar in Bharuch District, Gujarat... .
**************************************
As on July 26, 2019 : The Project is under Planning Stage .
Expansion will come up in its Existing Land of 3894.02 Sq.Meter.
An area of about 1285 Sq.Meter. will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 19.07.2019 with Prolife Chemopharma Pvt.Ltd...
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber
Thermic Fluid Heater : 2 Lac/Kcal : 1 No. ( Fuel : Agro Waste/ Briquette )
Air Pollution Control : Cyclone Separator + Bag Filters
The emissions from the boilers will be passed through Cyclone Separator followed by bag filters before releasing into atmosphere through a chimney .. .
DG sets : 400 KVA - 1 No.
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
46.4 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 4.25 m3/day
2.Process Water : 13.70 m3/day
3.Boiler Make up : 11.80 m3/day
4. Cooling Tower(make up) :3.70 m3/day
5. Washings : 6.5 m3/Day
6. Gardening : 4.05 m3/Day
7. Scrubber : 2.4 m3/Day
---------------------------------------------------------------------------------------
Total: 46.4 M3/ Day
Details of Waste Water Discharge
1.Domestic : 3.6 m3/day
2.Process Water : 16.75 m3/day
3.Boiler Make up : 2.54 m3/day
4. Cooling Tower(make up) :1.21 m3/day
5. Washings : 6.5 m3/Day
6. Gardening : ...........
7. Scrubber : 1.20 m3/Day
-------------------------------------------------------------------------------------
Total: 31.80 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 50 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 31.08 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 1285 Sq.Meter. of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Prolife Chemopharma Pvt. Ltd.
Plot No. 5729 & 5730, GIDC, Industrial Estate Ankleshwar,Bharuch - 393001, Gujarat, Indias
---------------------------------------------
Mob: 09879613000 Email: atrichemo...@gmail.com
Released |
RELEASED : ISSUE JULY 28 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project |
Chemcrux Enterprises Ltd. for Expansion
Synthetic Organic chemicals manufacturing unit
Capacity : 488.33 TPM to 1,015 TPM
Location : GIDC Ankleshwar in Bharuch District, Gujarat.. .
**************************************
As on August 02, 2019 : The Project is under Planning Stage .
Expansion will come up in its Existing Land of 6144 Sq.Meter.
An area of about 1000 Sq.Meter.(16.27 %) will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 24.07.2019 with Chemcrux Enterprises Pvt.Ltd...
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber
Air Pollution Control :
The emissions from the boilers will be passed through a chimney of 12 Meter.. .
DG sets : 800 KVA - 1 No. ( Existing : 250 KVA)
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
232 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 10 m3/day
2.Process Water : 160 m3/day
3.Boiler Make up : 24 m3/day
4. Cooling Tower(make up) :20 m3/day
5. Washings : 10 m3/Day
6. Gardening : 5 m3/Day
7. Scrubber : 3 m3/Day
---------------------------------------------------------------------------------------
Total: 232 M3/ Day
Details of Waste Water Discharge
1.Domestic : 8 m3/day
2.Process Water : 145 m3/day
3.Boiler : 6 m3/day
4. Cooling Tower :5 m3/day
5. Washings : 10 m3/Day
6. Gardening : ...........
7. Scrubber : 4.3 m3/Day
-------------------------------------------------------------------------------------
Total: 178.3 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 200 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 178.3 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 1000 Sq.Meter. of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Chemcrux Enterprises Limited
Plot No.: 4712-14, GIDC Road South-10, GIDC Ankleshwar, Bharuch - 393002, Gujarat, India
-------------------------------------------------
Tel: +91-2646-239737/221427 Fax: +91-2646-251469. Website: www.chemcrux.com
Released |
RELEASED : ISSUE AUGUST 11 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project |
Aero Agro Chemicals Industries plans for Expansion
Pesticides and Pesticides Specific Intermediates manufacturing unit
Capacity : 898 TPM to 6,716 TPM
Location : GIDC Estate, Panoli in Bharuch District, Gujarat.. .
**************************************
As on August 12, 2019 : The Project is under Planning Stage .
Expansion will come up in its Existing Land of 20,880 Sq.Meter.
An area of about 6,900 Sq.Meter.(33 %) will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 07.08.2019 with Aero Agro Chemical Industries Ltd....
the Project is under Panning Stage.
The company is waiting for Environment Clearances.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber
Boiler – Coal / Agro Waste shall be used as fuel. Emission through chimney shall be as per norms. Cyclone dust collector followed by bag filtershall be installed as APCM. DG Set- HSD shall be used. Stack shall be provided and emission shall be within norms...
Hot Air Generator : 2 Nos. (Fuel : Caol / Agro Waste)
DG sets : 200 KVA - 1 No.-New ( Existing : 200 KVA)
For back up in the common areas as well as for essential services
Water Treatment Plant:
The daily water demand of the proposed project will be around
349.70 m3/Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Details of Water Consumption
1.Domestic : 10 m3/day
2.Process Water : 263.70 m3/day
3.Boiler Make up : 25 m3/day
4. Cooling Tower(make up) :45 m3/day
5. Washings : 1 m3/Day
6. Gardening : 5 m3/Day
---------------------------------------------------------------------------------------
Total: 349.70 M3/ Day
Details of Waste Water Discharge
1.Domestic : 10 m3/day
2.Process Water : 263.07 m3/day
3.Boiler : 12 m3/day
4. Cooling Tower :15 m3/day
5. Washings : 1 m3/Day
6. Gardening : ...........
-------------------------------------------------------------------------------------
Total: 301.57 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 300 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 301.57 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 6.900 Sq.Meter. of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Aero Agro Chemicals Industries Ltd.
GIDC Estate, Panoli, Ankleshwar, Bharuch - 394116, Gujarat, India
-----------------------------------------
Mob: 09824345991 Email: aero...@yahoo.com / enq...@aacil.com
Website : www.aacil.com
Released |
RELEASED : ISSUE SEPTEMBER 01 /19
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact
person/E-mail
(Published Every Week
:Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7742 600/ 900 7158 600 )
New Project |
Centaur Pharmaceuticals plans for Expansion
Synthetic Organic chemicals manufacturing unit
================================
Capacity : 33,180 Kg/ Year to 1,00,000 Kg/Year
=====================
Project Cost : Rs.90.50 Crores
Location : Chikhloli MIDC, Ambernath (West) in Thane District, Maharashtra,... .. .
**************************************
As on September 04, 2019 : The Project is under Planning Stage .
Expansion will come up in its Existing Land of 8,435 Sq.Meter.
An area of about 33%. will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 21.08.2019 with Centaur Pharmaceuticals Pvt. Ltd. ..
the Project is under Panning Stage.
As of 4th September, 2019, the company environmental clearance is in place.
Civil contractor and equipment suppliers have not yet been appointed..
The Project is Scheduled to be Completed by
in 24 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber
Air Pollution Control :
to reduce the particulate emissions into atmosphere. Water Scrubber & Alkali Scrubber for Process Reactor; .
DG sets : 1000 KVA - 1 No. ( Existing : 350 KVA)
For back up in the common areas as well as for essential services
Water Treatment Plant:
Existing Requirement = 129 m3/ Day.
Proposed additional requirement = 278 m3/ Day
-------------------------------------------
Total (post expansion) = 407 m3/ Day
The source of water supply for the project will be from Bore well and water tankers.
************************************************************************
Domestic + trade effluent (post expansion)= 100 KLD
Sewerage System :
The company to revamp its existing ETP after segregation of effluents based on their total dissolved solids (TDS) and Chemical Oxygen Demand (COD) content, Effluents containing high TDS, COD and Low TDS and COD will be segregated and treated separately. Effluents will be to reduce the COD load on biological treatment. Similarly high TDS effluent streams are difficult to treat in biological ETP.
It is classified into two categories: High TDS and COD stream & Low TDS and COD stream.
********************************************************
Effluent Treatment Plant:
Capacity :100 KLD
Reverse Osmosis Plant
The company shall adopt and follow an environmental management plan for abatement
of pollution and overall enhancement of the quality of environment in and around the
unit.
About 100 KLD of effluent (wastewater) will be generated f
rom process and utilities.
The Company will have a full pledged Effluent Treatment Plant (ETP) to treat
the effluent as per the norms.
Part of the treated effluent would be recycled and used for the process.
Part of treated effluent is sent for forced evaporation for final treatment.
The residuecollected from forced evaporation and solid waste would be stored in HDPE
drums/Bags and disposed to TSDF facility.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD : Collection > Equalization & neutralization >
Stripper > MEE > ATFD > TSDF
MEE Condensate will be Reused
HTDS/HCOD : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
Other Equipments:
Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine, Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33% of area and a scheme for Rainwater Harvesting have to be put in place..
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Centaur Phgrmaceuticals private Limited
Centaur House. Near Grand Hyatt, Shanti Nagar, Vakola,
Santacruz (E), Mumbai - 400 055, Maharashtra, India
------------------------------------
Tel : +91-22-66499100 Fax : +91-22-66499112
Email : cen...@centaurlab.com Website : www.centaurpharma.com