Abhijeet New India Plans to Set Up 4.5 MTPA Cement Plant With 46 MW CPP

682 views
Skip to first unread message

Industrial Directory Of India

unread,
Mar 21, 2012, 3:46:14 AM3/21/12
to industrialdir...@googlegroups.com

              “New Projects This Week" 

                   RELEASED : ISSUE MARCH 18 /12 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600)

 
  Abhijeet New India Plans to Set Up  

4.5 MTPA Cement Plant With 46 MW CPP

 

Abhijeet New India Cement Private Limited   plans to set up a Greenfield Integrated Cement Plant comprising of 3.5 MTPA of Clinker, 4.5 MTPA of Blended Cement  Plant along with  Captive Power Plant :  WHRB Power plant of 10 MW and Coal based Power plant of
36 MW  at t Villages Dewara and Karkarghat, Taluk Rajura, Chandrapur District, Maharashtra.

 

Capacity :

Bleded Cement Plant   : 4.5 MTPA 

Clinker                          : 3.5 MTPA 

 

The plant will  manufacture both Ordinary Portland Cement and Portland Pozzolona Cement.

 

Captive  Power Plant    

  1. Coal Based                    :  36 MW  

  2. WHRB                            :  10 MW  

 

Location :  Villages Dewara and Karkarghat,Taluk Rajura, 

                     Chandrapur District, Maharashtra.

                    

As 0n  March 21, 2012 :  The  Project is  under  planning stage.

 

The project is coming up on about 250 Acres of land.

Out of this 33% of the area will be developed as Green Belt

IMPORTANT: As per the discussion we had on 09.03.2012 with  Abhijeet New India Cement Private Limited the project is under planning stage.

 

The company is waiting for necessary  clearance from State  Pollution Control Board  to  start the Project Work.

 

The Project   is Scheduled to be  Completed in Two & Half Years from the date of commencement of the project, latest  By December,2014 (tentatively) .

 

So, this is the RIGHT TIME to contact  and Follow Up Contractor  at following address obtain the detailed Enquiry of each product  in time and to submit your quotation subsequently.

 

*****************************

The Main Scope of Supply includes:

Captive Power Plant : 46 MW

(WHRB: 10 MW + AFBC  : 36 MW)      

1.Waste Heat Recovery Boiler: 

The hot flue gases from DRI kilns will pass through waste heat recovery Boilers to recover the heat and to generate 10 MW electricity. The gases after heat recovery will pass through ESPs and then discharged through chimneys into the atmosphere for effective dispersion of emissions into the atmosphere.

2.Fluidized Bed Combustion (FBC) Boiler:      

It will be based on FBC Boiler Technology where Mixture of Coal and Middlings of Coal washery shall be used as fuel  in AFBC Boiler o generate 36 MW electricity. The flue-gases will be treated in high efficiency ESP and then discharged through stack into the atmosphere.

 

.

Heat Exchangers, Air Pre-heater/Economiser) to be included both type of Boilers.

 

Rotary Klin: Rotary kiln with multistage preheater and 

precalcinator fo Clinkerisation of the raw meal.

 

Kiln will be provided with Bag house, ESP for Cooler and Bag filters for Coal mill and Cement will be provided.

 

Manufacturing Process :

The manufacturing process involves crushing of limestone, grinding of raw materials, homogenization of raw meal, pyroprocessing, clinker making, clinker storage, and cooling, cement making and blending with fly ash, packing and dispatch.

 

The major raw materials for the unit are Limestone, Coal, Bauxite, Gypsum, and Fly ash. The storage will be in Covered Sheds for all the Raw Material.

 

The clinker manufacturing involves

Raw Material Preparation

 Raw Meal Preparation

Clinkerisation and

Cement Packing & Storage..

 

Dry process will be used for cement production.

Vertical Roller Mill will be provided for Drying and Grinding the raw materials.

Bended raw material will be fed to Pyro-Processing section (kiln) and heated at 14500C for clinker formation.  Clinker will be cooled and ground at closed circuit ball mills.

 

In Captive Power Plant, chemical energy of coal will be converted to heat energy for steam generation which will be used to cement mechanical energy in a turbine to electrical energy.

 

In Lime Stone Mines Crusher will be provided with Water Spray on the Hopper and at material transfer points.

Air Slides

Air Blasters

Clinker Grinder Unit

Grate Coolers

Vertical Roller

Ball Mills

High Efficiency Separators.

Cement Storage Silo

Packing Machine

 

Air Polution Control Equipment:

Electrostatic Precipitators (ESP) will be provided to cement mill and power plant. 

During transportation of mineral from mine to cement plant site, water will be

sprinkled on haul roads. Wet drilling will be done during dust suppression.

Water Spray will be done to control dust generated during loading, transportation,unloading and crushing etc. 

The key emissions generated from Plant process & Limestone mining (i.e.

drilling, blasting, loading, haulage and other transport activities during mine

operation) are particulate matter, Oxides of Nitrogen (NOX) and Sulphur dioxide

(SO2). High efficiency ESP/bag house will be installed with boilers, cooler, kiln,

coal mill and cement mill to meet the PM (Particulate Matter) emission level of

less than the prescribed limit. Fugitive emission shall be controlled by proper

covered storage facilities for raw material & product. Proper water sprinkling shall be carried out at the mine site & material transfer points.

De-mineralised water from the storage tank will be pumped to the boiler with the

aid of Boiler Feed Pump. The boiler feed water through an Economizer will

the Steam drum and water walls where it is heated and converted to

saturated steam.

 

The steam from the main steam header will be  taken to the

Turbo–Generators. After rotating the turbinethe exhaust steam is

condensed in the Air Cooled Condensers and the

condensed water is pumped to the De-Aerator and fed back to the boilers.

 

All transfer points also will have Bag Filters. The emissions from all the Pollution Control Equipment will be restricted to less than 50 mg/nm3

 

DG Set : . 2 Nos.

DG sets   will be installed for stand by arrangement..

Silencer (Acoustic enclosures) to be provided to D.G.

 

Cooling Tower

Compressors

Air Conditioning Plant

Pumps

Material Handling Equipment

Conveyor

Crusher

Vibrating Screens

Pneumatic Conveying system

 

Other Systems

  • Fuel handling system
  • Ash handling system
  • Air Cooled Condenser
  • Fuel system

 

The following air pollution control systems/ measures are proposed in the Plant

1. All Conveyors will be completely covered with G.I. sheets to control fugitive  

    dust.

2. All bins will be totally packed and covered so that there will not be any chance   

    for dust leakage.

3. All the Dust Prone Points Material Handling systems to be connected with

    de-dusting system with bag filters.

4. All Discharge Points and Feed points, wherever the possibility of dust 

    generation is   there a de-dusting suction point will be provided to collect the dust.

5. The collected Dust from the Bag house of Steel Melting to be taken to a dust storage bin through a Pneumatic Conveying system.

 

Water Treatment Plant

Sand Filter, Iron Filter, ACF, DM Plant,Tube Settlers etc.

Pumps Valves, Custom Pipeline Work. 

Water requirement will be 3,500 m3/day for both Cement Plant and Power plant. 

 

Source of Water: The water requirement will be met

from Bhendara Dam which is 5-6 km from the plant site.

 

Effluent Treatment Plant

Entire wastewater will be treated and reused within the plant premises. No wastewater shall be discharged outside the plant premises.

Water will be mostly used as makeup for equipment cooling purpose.

No wastewater is generated from cement plant.

Wastewater generated from captive Power Plant shall be collected in Central Monitoring Basin and reused for dust suppression.

Domestic wastewater shall be taken to STP for treatment and the treated water shall be used for greenbelt development.

 

Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Cement Grouting Pumps, Air Pollution Control Equipments, Gear Boxes,  Cooling Tower, Blowers, E.O.T.Cranes, Hydraulic Equipments, Complete Laboratory Equipments, Water line Valve, Pump, Storage Tank, Vessels, Pipeline etc. etc.

 

Fire fighting System as per TAC norms. 

Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place. 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed, Substation-Control Panel- Electrical Work,Elevators, Plumbing Work, Structural Steel Fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Material Handling Equipment – Conveyors, Screen, Crushers, Feeders, Rotary Klin, Air Slides, Air Blasters, Heat Exchanger, Clinker Grinder Unit, Grate Coolers, High Efficiency Separators, Cement Grouting Pumps, Air Pollution Control  Equipments, Gear Boxes,  Water Treatment Plant,  Effluent Treatment Plant , Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. etc.   may  Contact for Specified Enquiry at :

 

Abhijeet New India Cement Private Limited
Prop : Abhijeet Group
Landmark Building, Level 5,Wardha Road
Ramdaspeth,Nagpur-440010, Maharashtra, India

--------------------------------------------

Tel  : + 91-712-3011400/ 401 / 402

Fax : + 91-712-663 9416

------------------------------------------

Email     : con...@abhijeet.in

Website : www.abhijeet.in

 

*****************************

               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                 

                   http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------

         

             RELEASED ANNUAL ISSUE :

      “NEW PROJECTS THIS WEEK”

Over 2250 Nos Projects Enquries Online

                Visit : http://industrialdirectoryofindia.com/annual

 


Mar1812.jpg
Reply all
Reply to author
Forward
0 new messages