RELEASED : ISSUE NOVEMBER 24/13
Comprising of Total 81 New Project Enquiries
with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail
(Published Every Week :Electronic Issue)
http://www.industrialdirectoryofindia.com/download
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158 600)
SVR Laboratories Plans For Expansion
Of its Bulk Drug Unit to 2167.66 Kgs/Day
SVR Laboratories Private Limited plans for expansion of the
production capacity of its Bulk Drug & Intermediates manufacturing
Unit from Existing capacity of 33.34 Kgs/Day to 2167.66 Kgs/Day
at Dothigudem Village, Pochampally Mandal in Nalgonda District, Andhra Pradesh.
Following Products will be manufactured after expansion :
Bulk Drugs
**************************************
As on November 28, 2013 : The Project is under Planning Stage .
Existing Land is 2.0 Acres.
After expansion : 6.0 Acres.
An area of about 33% of land will bedeveloped with Green Belt.
IMPORTANT: As per the discussion we had on 18.11.2013 with
SVR Laboratories Private Limited the Project is under Panning Stage.
The company is waiting for Environmental Clearance.
Note :
The infrastructure will be designed to manufacture all the 30 Products under Expansion Plan -
in Worst Case (Any 8 products on campaign basis.),
The Project is Scheduled to be Completed by
in 10 to 12 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following address
to obtain the detailed Enquiry of each product in time and to
submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Boiler : 5 TPH - 1 No.
Fuel : Coal
Stack : 30 Meter
Thermic Fluid Heater
Capacity : 4 Lakh Kcal - 1 No.
Fuel : Coal
Stack : 10 Meter
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Existing Status of Heating Equipment:
Presently the company is operating One No. of following Capacity Boiler
Boiler
Capacity : 1 TPH - 1 No.
Note:
After Expansion proposed 5 TPH & 4 TPH Capacity Boilers will be
in operation and existing 1 TPH Boiler will remain as stand by.
Air Polution Control:
The sources of air pollution from the plant are from proposed 5TPH, 4TPH coal fired Boiler, 4.0 Lac Kcal Thermic Fluid Boiler, 1TPH existing coal fired boiler, and DG sets of 250KVA existing and proposed 2 x 1000KVA capacity.
Proper Stack height
and air pollution control measures will
be provided in order to achieve norms prescribed by statutory authority.
For Boiler Cyclone & Bag filter will be provided with 30 Meter(5 TPH)/25 Meter (4 TPH) of Stack.
Scrubber will also be provided.
************************
Other Equipments:
SS Reactor
---------------------------------------------
Dryer
---------------------------------------------
HCl Fume Scrubber
--------------------------------------------
Chilling Water plant
---------------------------------------------
Filter Drier
-----------------------------------------------
Cooling Tower
---------------------------------------------
SOLVENT RECOVERY SYSTEM
-------------------------------------------
DM & R.O. plant
----------------------------------------------
Water Softener / ACF
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Pumps
-----------------------------------------------------
Centrifuge
----------------------------------------------
SS & HDPE Storage Tanks
-----------------------------------------------------
Compressor
----------------------------------------------
**************************
DG sets : 1000 KVA - 2 Nos.
( Existing :250 KVA - 1 No.)
DG sets will be used during load shut down by APTRANSCO..
************************
Water Treatment Plant:
Existing Freshwater Requirement : 7.5 m3/Day
The total Fresh Water demand for this project ( after expansion )
has been estimated as 78 m3/Day.,
Details of Water Consumption (After Expansion)
1.Domestic : 4.5 M3/Day
2.Process Water : 21.5 M3/Day
3.Boiler : : 12 M3/Day
4. Scrubber : 2 M3/Day
5. Cooling (MakeUp: 32 m3/Day(R) 25 M3/Day
6. Washing : 3 M3/Day
7.
Gardening : 10 M3/Day
--------------------------------------------------------------------------------------
Total Fresh Water: 78 M3/ Day
Recycled(R) : 32 M3/ Day
----------------------------------
Total : 110 m3/Day
Details of Waste Water Generation(After Expansion)
1.Domestic( Loss : 0.5 m3/Day) : 4.0 M3/Day
2.Process Water : 24.9 M3/Day
3.Boiler : ( Loss : 10.5 m3/Day) : 1.5 M3/Day
4. Scrubber : 2 M3/Day
5. Cooling (Loss: 55 m3/Day(R) : 2 M3/Day
6. Washing : 3 M3/Day
7. Gardening( Loss : 10 m3/Day : ----------
---------------------------------------------------------------------------------------
Total Waste Water : 37.4 M3/ Day
Recycled(R) : 76.0 M3/ Day
----------------------------------
Total : 113.4 m3/Day
Effluent Treatment Plant:
Reverse Osmosis Plant
The quantity of wastewater generated from domestic activities during operation phase
will be around 113 KLD ( after expansion) which will be treated in the Wastewater
treatment plant with a capacity of 150 KLD.
(Waste water generation for Existing Plant : 4.6 m3/Day)
**************************************
Effluent Treatment Flow:
ETP(BiologicalTreatment)along with Domestic
Waste Water(Septic Tank Over Flow)-à
Pressure Sand filter -à Activated Carbon filter
-à R.O.-à R.O.Rejects to MEE
R.O. Permeate to Cooling Tower & Boiler
**************************************
The treated waste water will be reused for flushing and green belt development.
The treatment scheme shall be designed to treat the wastewater and reuse the treated water for Gardening and flushing.
Process, Washings & ScrubberEffluent will be Treated in effluent treatment plant consist of Stripper, MEE, ATFD and biological treatment followed by Reverse osmosis Plant.. RO Permeate will be reused for cooling tower makeup and RO rejects will be sent to MEE..
Boiler Blow downs & Cooling Tower Blow downs will be Sent to Biological Treatment System followed by Reverse osmosis. RO Permeate reused for cooling tower makeup and RO will be rejects sent to MEE.
Other Equipments:
Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine, Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 33 % area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
SVR Laboratories Private LimitedH.No: 7-1-307/14/F/52, Jayaprakash Nagar
Sanath Nagar, Hyderabad - 500018, Andhra Pradesh, India .**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQhttp://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's NameE-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”
Over 2250 Nos Projects Enquiries Online