| New Project |
Virupaksha Organics Plans For
Expansion Of its Pharmaceutical Unit
Virupaksha Organics Private Limited plans to expand its Bulk Drug manufacturing unit – II at Phase I, IDA Pashamylaram Village , Patancheru Mandal in Medak District, Telangana.
It envisages setting up of a Bulk Drugs and Intermediate Products manufacturing Plant having capacity of 112.50 Ton/Month.
Capacity : 112.50 Ton/Month
The plant will have a production capacity of:
Atenolol 3000 Kgs/Month
Cinnarizine 5000 Kgs/Month
Cyano diol base 5000 Kgs/Month
Dextromethorphan HBr 5000 Kgs/Month
DFTA 2000 Kgs/Month
Epoxy Mesylate 4000 Kgs/Month
Escitalopram Oxalate 1500 Kgs/Month
Fexofenadine HCl(BCN) 5000 Kgs/Month
Fexofenadine HCl 5000 Kgs/Month
Fexo Stage-10 5000 Kgs/Month
Fluconazole 5000 Kgs/Month
Metaprolol Succinate 1000 Kgs/Month
Tramadol Base 2000 Kgs/Month
Tramadol Hydrochloride (MBA) 2500 Kgs/Month
Tramadol Hydrochloride (MCA) 2500 Kgs/Month
Tramadol Nitrate 5000 Kgs/Month
-------------------------------------------
Total: 112500 Kgs/Month
(112,500 Kgs/Month = 112.50 Ton /Month )
Total Production : 112.50 Ton/Month
Location : Unit – II,Phase I, IDA Pashamylaram Village
Patancheru Mandal, Medak District, Telangana
**************************************
As on January 28, 2015 : The Project is under Planning Stage .
Total site area is 3.89 Acres (15 742.27 Sq. Meter).
An area of about 5200 Sq. Meter will be developed with green belt.
IMPORTANT: As per the the discussion we had
on 15.01.2015 with Virupaksha Organics Private Limited
the Project is under Panning Stage.
The company is waiting for Environmental Clearance.
The Project is Scheduled to be Completed
in 12 - 15 Months from the date of the commencement
of the project work.
-------------------------------------------------------------------------------
So, this is the RIGHT TIME to contact and Follow Up at following
address to obtain the detailed Enquiry of each product in time
and to submit your quotation subsequently.
**************************
The Main Scope of Supply includes:
Heat Exchangers, Air Pre-heater/Economiser)
Wet Scrubber for arresting fly ash
Air Polution Control:
There will be flue gas stack and one process gas stack which will be the main emission source from the plant.
Proper Stack height and air pollution control measures will be provided in order to achieve norms prescribed by statutory authority.
For Boilers Cyclone & Bag filter will be provided with 32 Meter of Stack.
Single Stage Scrubber will be also be provided.
************************
Existing Status of Heating Equipment:
Presently the company is operating One No. of Boiler of following Capacity:
Boiler
Capacity : 2 TPH - 1 No.
Other Equipments:
Reaction Vessel
Dryer
---------------------------------------------
Chilling Water plant
---------------------------------------------
Scrubbers(single stage)
-----------------------------------------------
Cooling Tower
----------------------------------------------
DM/R.O. plant
---------------------------------------------
Air Compressor
----------------------------------------------
Effluent Treatment Plant
----------------------------------------------
Solvents Pumps (SS/PP)
----------------------------------------------
HDPE Storage Tanks
-----------------------------------------------------
MS/SS Solvent Storage Tanks
-----------------------------------------------------
Weighing Balance
----------------------------------------------
Fire Hydrant System
**************************
DG set (new) : 500 KVA - 1 No.
DG set (existing) : 380 KVA - 1 No.
For back up in the common areas as well as for essential services
above Two D.G.sets will be used.
Water Treatment Plant:
Water requirement of the project for domestic and industrial activity during operation phase will be
188.36 m3/Day.,
The water requirement will be supplied by IDA..
************************************************************************
Details of Water Consumption
1.Domestic : 3.00 M3/Day
2.Process Water : 65.36 M3/Day
3.Boiler Make up : 59.00 M3/Day
4. DM Plant Regeneration : 2.00 M3/Day
5. Cooling Tower(make up) : 50.00 M3/Day
6. Gardening 5.00 M3/Day
7. Washings : 2.00. M3/Day
8. Scrubbing system : 2.00 M3/Day
---------------------------------------------------------------------------------------
Total: 188.36 M3/ Day
Details of Waste Water Discharge
1.Domestic : 2.50 M3/Day
2.Process Water : 77.54 M3/Day
3.Boiler Blow Down : 09.00 M3/Day
4. DM Plant : 2.00 M3/Day
5. Cooling Tower(Blow Down) : 10.00 M3/Day
6. Washings : 2.00. M3/Day
7. Scrubbing system : 2.00 M3/Day
---------------------------------------------------------------------------------------
Total: 105.04 M3/ Day
********************************************************
Effluent Treatment Plant:
Capacity : 100 m3/ Day
Reverse Osmosis Plant
Total effluent generated in the project is 105.04 m3/day .
The treated water will be reused for plant operations.
The process waste water from Process, floor Washes, scrubbers, QC and R&D are
evaporated in MEE with stripper and ATFD after neutralization.
The condensate from MEE and ATFD will be collected and treated in effluents treatment plant along with
effluents from utilities followed by RO. RO rejects will be send back to MEE and RO
Permeate will be re-used back.
To treat the sewage generated due to domestic activities will be disposed through
septic tank following by soak pit.
FLOW CHART FOR EFFLUENT TREATMENT
HTDS/HCOD (78.79 m3/Day) : Collection> Equalization & neutralization >
MEE > ATFD > TSDF
MEE Condensate will be Reused.
LTDS/LCOD (26.25 m3/Day) :Collection> ETP(Biological Treatment) > Sand
Filter > Carbon Filter >Booster pump to
Membrane Filter set > RO Plant > RO Reject to
MEE RO Permeate to Reused.
=============================
Total : 105.04 m3/Day
Other Equipments:
Ventilation & Exhaust System
Complete Laboratory Equipments
Fire fighting System as per TAC norms,
Green Belt Development plan in 5200 Sq. Meter Sq. Meter of area and a scheme for Rainwater Harvesting have to be put in place.
Scope Of Entire Civil & Construction Work:
Construction of Office Building, Factory Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication Storage Tank, Vessels etc. etc.
Companies/ General Industries/ Manufacturers / Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water & Effluent Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs for the above project may Contact for etc.etc. may Contact for Specified Enquiry at :
Virupaksha Organics Private Limited
F−10, IDA, Gandhi Nagar, Balanagar
Hyderabad - 500037, Andhra Pradesh , India
-------------------------------------------------….
Tel : + 91- 40−23075816/3079
Fax : + 91- 40− 23720738
Email : in...@virupaksha.com
Website : www.virupaksha.com
| New Projects |
**************************************
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES
Visit : http://industrialdirectoryofindia.com/FAQ
GET NEW PROJECTS INFORMATIONS ONLINE
http://www.industrialdirectoryofindia.com/download
We provide information on NEW PROJECTS such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.
with all Contact Details:
Company's Name
Address/ Phone/ Fax
Contact person's Name
E-mail Id
We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.
We make your Bidding/MARKETING/ Sub-contracting & Planning MORE EASY
GET YOUR COMPANY REGISTERED TODAY AND GET ALL PROJECTS INFORMATIONS DIRECTLY IN YOUR MAIL BOX .
Visit : http://www.industrialdirectoryofindia.com/registration
GET ALL BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX
------------------------------------------------------------------------------------------------------------
RELEASED ANNUAL ISSUE :
“NEW PROJECTS THIS WEEK”