Update : Malbros International Plans To Set Up 500 KLPD Distillery with Captive Power,.....

1,650 views
Skip to first unread message

Industrial Directory Of India

unread,
Dec 31, 2015, 2:54:27 AM12/31/15
to industrialdir...@googlegroups.com
 Industrial Directory of India.Com 

  Released
                "New Projects This Week" 

                   RELEASED : ISSUE DECEMBER 27/15 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600)  

  ====================================

"Wish You A Happy New Year - 2016"  

====================================


                     Project Update

  Malbros International Plans To Set Up 

500 KLPD Distillery with Captive Power

====================================

              Update : Ref  Our Earlier Report of 

                             02.09.2015 

====================================

          

Malbros International Pvt. Ltd.  plans for installation of Unit II - Grain Based Ethanol/RS Industrial/ENA Plant having capacity of 500 KLPD (2X250 KLPD) along with  40 MW ( 2X20 MW) Co-Generation Power Plant (Coal/Rice Husk/Pet Coke/ Biomass/Natural Gas )  at Mansoorwala Village, Tehsil Zira in Ferozepur District, Punjab.

 
Capacity :

Distillery                    500 KLPD (2X250 KLPD)

The unit will be installed in Two Phases : 

Phase   I :  250 KLPD Ethanol/ RS Industrial/ ENA Unit 

Phase  II : 250 KLPD Ethanol/ RS Industrial/ ENA Unit 

=====================

Captive Power Plant  :  40 MW ( 2X20 MW)

( Fuel : Coal/Rice Husk/Pet Coke/ Biomass/Natural Gas)

The unit will be installed in Two Phases : 

Phase I   : 20 MW 

Phase II : 20 MW 

=====================

CO2 Plant : 225 TPD (2X 112.5 TPD)


Total Working Days in a year350 days


Project Cost : Rs. 583 Crores

 

 Location : Mansoorwala Village, Tehsil Zira 

                  Ferozepur District, Punjab

                    

As on  December 30, 2015 : The Project is under Planning Stage. 

 

The unit would come up in  36.5 Acres of Land .


Out of this about 33% of the area will be developed as Green Belt.

 

IMPORTANT: As per the the discussion we had

on 15.12.2015 with Malbros International Pvt. Ltd.

the Project  is  under Panning Stage.

 

The company is still waiting for Environmental clearances . 


 The Project   is Scheduled to be  Completed in

18-24 Months from the date of commencement of the project work.

 

=======================================

So, this is the RIGHT TIME to contact  and Follow Up at following address 

to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

The Main Scope of Supply includes:

Boiler        : *100 TPH - 2 Nos

Fuel(as avialable)  Coal/Rice Husk/Pet Coke/ Biomass/Natural Gas


Fuel Consumption  :  Coal              :  500-750 /Day/

                                   Rice Husk    : 1000-1200/Day/

                                   Natural Gas : 500-600 MT/Day


Stack Height           : 63 M

 

Heat Exchanger, Air Pre-Heater/ Economiser


===============================

Steam Requirement (*Break Up):

 

Cooking & Liquefaction                : 15.79 TPH

Multi-Pressure Distillation            : 65.20 TPH

Evaporation (Integrated)               : 6.25 TPH

DWGS Drier (DDGS)                      : 52.08 TPH

Boiler Deaeration                          : 10.41 TPH

-------------------------------------------------------------

               Total                    :    149.74 TPH


Boiler with 2 X 100 TPH capacity is proposed to be installed.

 

===============================

 

Raw Materials :

      Grain :                                      1100-1300 Ton/Day

(Damaged grain feed stock, nakku kinki, maize,

 bajra, sorghum, barley etc.)


  1. Nutrients                                                   :  2000-3000 Kg/day
  2. Sodium Hydroxide (Caustic)                       :  2000 Kg/day
     3 . Enzyme  :                               
          NH2-CO- NH2 (Urea;46 % N2)                :        800-1000 Kg/day
    
    4.   Antifoam Agent                                           :         500-600 Kg/day
    
    5.   
Yeast (Active Dry 
Yeast

         /Distiller’s Yeast
                                          :          250-350 Kg/day
        

 

Air Pollution Control Equipment :

Electrostatic Precipitators/ Bag Filter

 

To control the particulate emissions from Coal  Fired boiler will be controlled by ESP and emissions will be dispersed through Stack Height  of  63 Meters.

 

Steam generated from the boilers and will be utilized in the generation of 

2X 20 MW Power and will also be used for Boiler feed water heating and Distillery.

 

Flue gases after super heating the steam will pass through Economizer where they will  Pre-Heat the boiler Feed water before it enters the boiler drum. After Economizer, flue will pass through Air Pre-Heaters where they will heat the air which will be  fed to the boiler furnace for burning the fuel.

 

After Air Pre Heaters flue gases will pass through an Electro Static Precipitator where the Dust Particles will be  collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 100 mg/Nm3 through a Chimney of prescribed height.


The dust will be  collected from the bottom of the ESP.


Power Requirement and Source:

 

The company’s proposal is to install 2 X 20 MW Co – Generation Power Plant.

 

Steam generated from the boilers of will be utilized in the generation of 2 X 20 MW which will be for own consumption.

Steam generated from boiler will also be used for boiler feed water heating and distillery.


Fuel in the steam boiler will be burnt with the help of air in the boiler furnace. Water will be circulated in the boiler drum and tubes thus getting heated by the flame burning in the boiler furnace. Water comes out of the boiler drum located at the top of the boiler as steam. Flue gases rise in the boiler furnace and come in contact with the steam coming out of boiler drum. Steam after coming in contact with flue gases gets heated up further thus getting superheated. Super heated steam leaves the boiler in a pipe. Flue gases after super heating the steam pass through economizer where they pre-heat the boiler feed water before it enters the boiler drum. After economizer, flue gases pass through air pre-heaters where they heat the air which is

fed to the boiler furnace for burning the fuel. After air pre heaters flue gases pass through an Electro Static Precipitator where the dust particles are collected on charged electrodes. After passing through ESP, clean flue gases with dust particle concentration also known as SPM level less than 100 mg/Nm3 through a chimney of prescribed height. The dust is collected from the bottom of the ESP.


High pressure superheated steam from boiler will pass through a steam turbine will be used for distillery.

While passing through the turbines ( Turbine : 2 X 20 MW) , the high pressure and temperature steam will rotate the turbine rotor and an electric alternator mounted on the same shaft. Electric power will be generated by the alternator. This electric power generated will be consumed in house i.e. for running the distillery and utilities like boilers auxiliaries etc.


************************************************************************ 

Steam turbine

Coal handling system

Ash handling system

Air Cooled Condenser

Power plant stack

Single Chimney

Fuel system

Cooling Tower

Pumps

*************************************

Details of Material Handling for Distillery:

Bucket Elevators, Vibrating  Screen,

Hammer  Mills, Screw Conveyor

 

GRAIN STORAGE : Pre-Cleaning and to store in Storage Silos.

 

GRAIN STORAGE : The grain is lifted in bucket elevators, screened followed by removal of stones and iron matter. Cleaned Grains are then milled using dry milling process in Hammer Mills. The flour is fed through the bucket elevator and conveyed to the Batch Tipping Machine through a Screw Conveyor. The flour addition is metered through the Batch Tipping Machine with load cell arrangement, before transferring the flour to the Slurry Tank through another Screw Conveyor (pre-masher) for slurry preparation process. It is being proposed to have 4 x 16 TPH as milling paraphernalia for this Distillery.

 

 

=======================

 

Cooled Condenser  :

Use of Air Cooled Condenser to be used to reduce water consumption.

 

All the Conveyors will be covered with GI sheets to prevent the fugitive dust emission into the atmosphere.

 

DG set :

1000 KVA – 3 Nos.

will be  installed for emergency power Back-up during power failure.

 

Stack Height (above roof level) : As per CPCB/SPCB norms

Pollution Control Equipment Measures : Adequate stack height/ Acoustic

 

will be  installed for emergency power Back-up during power failure:

      

Water Treatment Plant

Oxidisation Chamber, Pressure Sand Filter / IRF, R.O. Plant,

Tube Settler

Pumps Valves, Custom Pipeline Work.

 

Total water requirement for the above project will be

4110m3/day (Net fresh water after recycle ) will be sourced from Canal Water & Recycled Water.


 Water requirement for first run would be 10958 m3/ day.

 

 WATER INPUT  

 

PROCESS WATER IN LIQN & FERMENTATION :              1635   KLD

DM WATER IN DISTILLATION FOR RS DILUTION          : 625   KLD

SOFT WATER FOR CT MAKEUP                                  :   3750    KLD

 BOILER FEED WATER                                              :     3678   KLD

SOFT WATER FOR Distillation                                 :         675    KLD

FERMENTER WASHING                                   :               94     KLD

DOMESTIC CONSUMPTION                                           : 32     KLD

SOFT WATER FOR PUMP SEALING & VACCUM PUMP : 250    KLD

FLOOR,  WASHING                                                         : 219   KLD

________________________________________________________

TOTAL WATER REQUIREMENT                    :     10958 KLD

 

           TOTAL WATER OUTPUT

STEAM CONDENSATE                                                 : 2582  KLD

WATER In SPENT WASH                                               : 265   KLD        :

SPENT LEES RECTIFIER                                                :625  KLD

SPENT LESS PRE-RECTIFIER                                    :    625   KLD

CT EVAPORATION & DRIFT LOSSES                          :  3750   KLD

WATER IN DDGS DRIER                                             :   810   KLD  

BOILER DRIFT AND BLOWDOWN LOSSES              :         50   KLD  

VACUUM PUMP & SEALING                                           : 250   KLD

PROCESS CONDENSATE                                             : 2001   KLD      

_______________________________________________________

TOTAL      :     10958 KLD

 

 ************************************ 

Effluent Treatment Plant :

The plant washing of will be fed to clarifier.

The overflow from clarifier & the NF Reject will be taken to the collection tank for proper mixing. Effluent from the collection tank will be pumped to aeration.

 

The stream from clarifier will be feed to in Anaerobic Treatment followed by separator the sludge is separated and will be sent to equalization tank.

Waste water generated or distillery effluent stream is known as spent wash. 


It is a dark brown highly organic effluent and is approximately 10-12 times by volume of

the product alcohol. It is one of the most complex, troublesome and strongest

organic industrial effluents, having extremely high COD and BOD values. 

 

Because of the high concentration of organic load, distillery spent wash is a potential source of

renewable energy. Liquid effluents that come from a grass roots distillery are :

 

#The spent wash from analyzer column bottom ;

 

#The effluent from water treatment plant – water softening plant and DM plant.


# Cooling water purge from cooling towers.


 #Boiler blow down


 # Spent lees from exhaust column bottom, spent lees from re-rectification

    column of ENA plant and spent lees from vaporizer column bottom in the

    dehydration (absolute alcohol) plant.


# Floor washings and washings from equipment.


The spent wash from analyzer column bottom is collected in clarifier for removal of

suspended particles and then treated anaerobically to produce value addition

products like methane & Bio-compost and to achieve zero discharge.


************************************* 

Other Equipments:

Material Handling Equipment : Conveyor, Hydraulic Equipment/Cranes

 DG Set, Air Compressor. DC/VFD Drive, Gear Box, Insulation, Valves, Pipes & Tubes, Cables, Automatic Weighing Machines for Bulk & Liquid Materials. Straight Line Steam Tunnel, Pneumatic Piston Filler, Pressure Filler,Storage Tank, Cooling Tower/ Plant, Air Conditioning Plant, Complete Laboratory Equipments  etc

 

Fire Fighting System shall be as per the TAC Norms and cover all areas where  alcohol is produced, handled and stored.

 

Provision of Foam System for Fire Fighting to control fire from the alcohol storage tank.

 

Green Belt Development plan in 33 % area   and a scheme for Rainwater Harvesting have to be put in place.

 

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/  Contractors/ Sub Contractors/ Manufacturers of Boiler, Material Handling Equipment , Water Treatment Plant, Effluent Treatment Plant, Air Pollution Control  Equipments, Cooling Tower, Blowers, Cranes, Hydraulic Equipments, Water line Valve, Pump, Pipeline etc. related to Distillery Plant   may  Contact for Specified Enquiry at :

 

Malbros International Pvt. Ltd.

 Village :  Mansoorwala,  Talwandi   -

Tehsil    : Zira,  District : Ferozpur- 152002, Punjab, India

 ------------------------------------------------

Tel                : +91-1682-262007/ 262107  H.O. : +91-11-25229720

Email            :    mal...@ymail.com


Corporate Office :

Malbros International Pvt. Ltd.

40 North Avenue Road

West Punjabi Bagh

New Delhi-110026, Delhi, India

------------------------------------------------

Tel                :   +91-11-25229720

Email            :      mal...@ymail.com

 

*****************************

            New Projects

                    

      FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                  Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE                     

         http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                  Contact person's Name

                  E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 