PART-1: PROJECTS FOR WHICH THE P.F.R. IS READY:
SR. NAME OF THE DISTRICT NALLAH/RIVER TENTATIVE
NO. BASIN INSTALLED CAPACITY
CATEGORY-1
1. Chanju-l Chamba Chanju/Ravi 25 MW
2. Chanju-ll Chamba Chanju/Ravi 17 MW
CATEGORY-II
1. Youngthang Khab Kinnaur Spiti Satluj 261 MW
2. Bara Bangahal Chamba Ravi 200 MW
3. BajoliHoli Chamba Ravi 180MW
4. Gondhala Lahaul & Spiti Chandra/Chenab 144MW
5. Bardang Lahaul & Spiti Chenab 114 MW
6. Chhatru Lahaul & Spiti Chandra/Chenab 108MW
PART - II: PROJECTS IDENTIFIED (FEASIBILITY OF THE PROJECT TO BE
ASCERTAINED BY IPPs)
CATEGORY-1
1. ManeNadang Lahaul & Spiti Spiti/Satluj 70 MW
2. Lara Lahaul & Spiti Spiti/Satluj 60 MW
3. Ropa Kinnaur Ropa/Satluj 60 MW
4. KulingLara Lahaul & Spiti Spiti/Satluj 40 MW
5. Bharari Bilaspur Bharari/Satluj 5.5 MW
6. Miyar Lahaul & Spiti Miyar/Chenab 90 MW
7. Tinget Lahaul & Spiti Miyar/Chenab 81 MW
8. Tcling Lahaul & Spiti Chandra/Chenab 61 MW
9. Patam Lahaul & Spiti Miyar/Chenab 60 MW
10. Rupin Shimla Rupin/Yamuna 39 MW
CATEGORY-II
1. Cange Youngthang Kinnaur Spiti/Satluj 140MW
2. Sumte Kothang Kinnaur Spiti/Satluj 130MW
3. LaraSumta Kinnaur Spiti/Satluj 104MW
4. Reoli/Dugli Lahaul & Spiti Chenab 715MW
5. Dugar Chamba Chenab 360 MW
6. Gyspa Lahaul & Spiti Bhaga/Chenab 240 MW
7. Sach-Khas Lahaul & Spiti Chenab 210 MW
8. Sell Lahaul & Spiti Chenab 150MW
9. Thandi Lahaul & Spiti Chenab 150 MW
10. Rashil Lahaul & Spiti Chenab 150MW
PART-III: SELF-IDENTIFIED PROJECTS (ABOVE 5 MW):
CATEGORY- 1
Self-Identified Projects Above 5 MW to 100 MW
CATEGORY-II
Self-Identified Projects Above 100 MW
The 'Eligible Bidder' shall mean a Company or a Consortium of Companies
or a Corporation, whether in the Public or Private School and whether
of Indian or Foreign Origin.
A. GENERAL CONDITIONS APPLICABLE FOR PROJECTS:
1. The Bidders should have strong financial and technical base with
adequate free investible reserves and surpluses and requisite technical
capability necesary for the development of the above Hydro Electric
Projects.
2. The operation period of the Projects shall be forty (40) years from
the Commercial Operation Date (COD) of the Projects at the end of which
these shall stand transferred to the Government of Himachal Pradesh
free of cost.
3. For Projects above 100 MW installed capacity, the Govt. of Himachal
Pradesh reserves the right of equity participation upto 49% on
selective basis.
4. The Developers will be free to dispose of power from the Projects,
after allowing for royaltry in the shape of free power to the State, in
any manner they like an accordance with the provisions contained in the
Electricity Act, 2003 and the rules and regulations made thereunder.
5. The Project Developer will be required to provide royalty in the
shape of free power from the Project to the Government of Himachal
Pradesh in lieu of surrender of potention site @ 12% of the Deliverable
Energy of the Project for the period starting from the date of
synchronization of the first generating unit and extending upto 12
years from the date of Commercial Operation of the Project, @ 18% of
Deliverable energy of the Project for a periof of next 18 years and
thereafter @ 30% of the Deliverable Energy for the balance agreement
period beyond 30 years. The royalty in the shape of free power shall
start accruing to the Govt. from the Scheduled commercial Operation
Date. In case the actual COD is delayed beyond the Scheduled COD, in
that event the amount of free power component as royalty shall accrue
to Govt.of H.P because of extended COD and the Developer shall pay the
same in 10 equal installments from the actual COD.
6. The Developer shall reimburse to the Board the amount, spent by the
Board on investigations and infrastructure works of the Project upto
the date of signing of Implementation Agreement, with compound interest
@ 10% per annum within three months of signing the Implementation
Agreement.
7. The scope of the work will be from concept to commissioning and
operation thereafter, including, inter-alia, survey nd investigations
etc.
B. APPLICABLE FOR CATEGORY-1 PROJECTS 5 MW - 100 MW:
Successful/Selected Bidders shall be required to deposit Upfront
Premium at the following rates: i)For Projects above 5 MW to 50 MW Rs.
1.00 lac/MW ii)For Projects above 50 MW to 100 MW Rs. 2.00 lac/MW
The upfront premium shall be payable by the successful Bidders in three
installments i.e. 50% amount at the time of signing of MOU, 25% at the
time of signing of Implementation Agreement and remaining 25%
immediately after Financial Closure.
C. APPLICABLE FOR CATEGORY- II PROJECTS 100 MW & Above:
The selection process will be in two stages. In the first stage the
interested Companies shall submit Pre-qualification Bids as per the
Request for Qualification (RFQ) document. In the second stage, the
Pre-qualified Bidders will be invited to submit Price Bids. In the
Price Bids, the Bidders would be required to quote the upfront charges
over and above a minimum amount of Rupees Ten lacs (Rs. 10,00,000) per
Mega Walt capacity of the Project. The quoted upfront premium shall be
payable in three installments i.e. 50% amount immediately after
allotment of Project, 25% at the time of signing of Implementation
Agreement and remaining 25% immediately after Financial Closure.
D. OTHER INSTRUCTIONS:
1. The brochure containing details of terms and conditions regarding
Bidding and Project Implementation, Bid Application Formats,
Questionnaire etc. would be available to the interested Bidders w.e.f.
23.01.2006 on payment of Rupees two lac (Rs. 2,00,000) only per Project
through a bank draft/bankers cheque, from the office of the Chief
Engineer (PSP), HPSEB, Vidyut Bhawan, Shimla-171004 (HP) India.
Documents will be sent through Registered Post/Speed Post. The bank
draft/banker's cheque shall be given in the name of Account Officer
(Banking), HPSEB, Shimla and drawn on any Scheduled Indian Bank at
Shimla. For getting the documents through Courier service additional
charges @Rs. 1000/- for inland and Rs. 5000/- for foreign countries
shall be payable. The Bids will be accepted only from the Bidders who
purchase the Bid Documents.
2. The last date for supply of Bid Documents to the interested bidders,
the last date of submission of bids in the office of Chief Engineer
(PSP) at the above address and the date of opening of Bids in his
office are as under:-
SR. DESCRIPTION LAST DATE LAST DATE DATE OF
NO. FOR SALE OF SUBMISSION OPENING BIDS.
1.For Projects: Bara Bangahal, Gondhala, Bardang, Chhatru, Miyar,
Tinget, Teling, Patam, Reoli/Dugli. Dugar, Gyspa, Sach-Khas, Seli,
Tandi & Rashil and Self Identified Projects.
29.6.2006 at 1700 hours 30.6.2006 at 1300 hours 30.6.2006 at 1600 hours
2.For Projects: Youngthang Khab, Mane Nadang, Lara, Kuling Lara, Rupin,
Change Youngthang, Sumthe Kothang and Lara Sumte.
30.5.2006 at 1700 hours 31.5.2006 at 1300 hours 31.5.2006 at 1600 hours
3.For Projects: Chanju I, Chanju-ll, Bajoli Holi, Ropa and Bharari.
28.4.2006 at 1700 hours 29.4.2006 at 1300 hours 29.4.2006 at 1600 hours
NOTE: I) THE DATE OF SALE/RECEIPT/OPENING OF BID DOCUMENTS HAVE BEEN
MENTIONED SEPARATELY IN VIEW OF THE INACCESSIBILITY OF THE AREAS.
3. The Bidders shall also be required to furnish a non-refundable
Processing Fee @ Rupees One lac (Rs. 1,00,000) only per MW subject to
maximum of Rupees Ten lacs (Rs. 10,00,000/-) per Project applied for.
The payment shall be made through bank draft/bankers cheque in the name
of Account Officer (Banking), HPSEB, Shimla drawn on any Scheduled
Indian Bank at Shimla. Bids not accompanied by the Processing Fee are
liable to be rejected forthwith.
Vishal Singal
Singal Hydel Consulting SHC
"Power House" # 892, Sector 12
Panchkula 134 112, HRY INDIA
Tel +91 9888188891, 9888288892
E-Mail: singa...@yahoo.com
Web: http://www.himurja.com
[Tapping the Power of the Himalayas]
Dear Vishal,
I would like to refer to our earlier email exchanges and introduce ourselves as Authorized Representative of Hydropower Machinery Manufacturers in China.
We represent a very strong and experienced group of Machinery manufacturers complete set Hydropower Equipent from 500 kw to 50 MW or larger.
This opportunity, we would like to share with you to explore together this sector in the mutal interest of us both.
We are currently in China and working on your requirement would be much convenient and faster.
Looking forward in hearing from you at your convenience, we remain.
Yours Sincerely: Basant Sigdyal
Kathmandu Office:
KADAMBINI TRADERS PVT. LTD.,neptr...@yahoo.com, bsigdy...@yahoo.com
SKYPE: bsigdyal
Lazimpat, Kathmandu, Nepal.
Telephone Nos:
Cell Phone: 977 98510 78608
Office: 9771 4432538,
Fax: 9771 4442764,
US office:
SCIENTEC TRADE INC.,
From: "Vishal Singal" <singa...@gmail.com>
Reply-To: indiahy...@googlegroups.com
To: "India Hydro-Electric Power" <indiahy...@googlegroups.com>
Subject: [INDIA-HydroPower:50] Hydel Projects: Invitation of BIDS for Last 28 Hydro-Electric Projects in Himachal Pradesh
Date: Tue, 24 Jan 2006 21:28:47 -0800