Govt. Of M. P. Failured to maintain power supply in the state.
5 views
Skip to first unread message
GWALIOR TIMES
unread,
Apr 6, 2012, 8:52:10 AM4/6/12
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to INDIA NEWS भारत समाचार
Non break power shut down continued at Gwalior- Chambal region of
Madhya Pradesh.
Govt. Of M. P. Failured to maintain power supply in the state.
Special report
Gwalior 6th March. It is sirprising power shut down is continued at
gwalior chambal region since last two days, ofcourse more than 50
hours passed. Present situation is that no body is available to
maintain power supply at local power houses. Mr. XYZ an Asst. Engineer
at M. K. V. V. Company said on a phone talk that he cant do nothing in
the matter. It is ordered through C. M. House and Morena M. P.
Narendra Singh Tomar to shut down continously in half of area of
city.It is very sirprising fact that what saying one responsible
engineer giving such irresponsible reply without any fear.Second one
responsible officer posted at ministry of energy of Madhya Pradesh
sachivalay said on a phone talk .. Aaj chhutti hai isliye bijali ki
bhi chhutti hai.Now it can say without any doubt after seen the above
scenerio the Govt. Of Madhya Pradesh is totally faild to provide
constitutional fandamental facilities to its state citizen. Of course
M. P. Govt. Is now failed to maintain power supply in the state of
Madhya Pradesh.