Gazelle/Cypress design/implementation agenda

1 view
Skip to first unread message

Moore, Steve

unread,
Jul 15, 2008, 6:42:42 PM7/15/08
to ihe-gazell...@googlegroups.com, cypres...@googlegroups.com, Moore, Steve

Eric and I have one agenda item we would like to cover tomorrow. I am attaching rudimentary slides to start the discussion of the interface between the Control System and the Test Engine. My goal tomorrow is to find some people to work with me on creating a good specification of that design and then to start that work. The slides show the two models that we are considering.

 

The amount of coupling between the two systems will depend on how well we can separate them. For our collaboration with Laika, the looser the coupling, the better we will be.

 

Steve

 



The materials in this message are private and may contain Protected Healthcare Information. If you are not the intended recipient, be advised that any unauthorized use, disclosure, copying or the taking of any action in reliance on the contents of this information is strictly prohibited. If you have received this email in error, please immediately notify the sender via telephone or return mail.
Gazelle-Control-Test-Engine-Interfaces.ppt

Robert Snelick

unread,
Aug 12, 2008, 2:42:03 PM8/12/08
to cypres...@googlegroups.com, ihe-gazell...@googlegroups.com

Dennis, All,

I think things have been hectic all the way around. With the vacation season and the NHIN testing event it has been difficult for NIST to devote time to this recently. We'll resume the calls shortly. At the face-to-face Gazelle/Cypress meeting we agreed that a monthly call schedule is more appropriate at this time. With Gazelle and Cypress this should keep us talking every two weeks or so.

I think a fair amount of progress has been made in some of our focus areas since our initial March meeting. Much of this was demonstrated at the face-to-face meeting. Other areas haven't progressed; broader participation is always welcomed.

Rob

 


From: cypres...@googlegroups.com [mailto:cypres...@googlegroups.com] On Behalf Of Dennis Wilson
Sent: Thursday, July 17, 2008 1:32 PM
To: cypres...@googlegroups.com
Subject: [Cypress:83] still here

 

Steve and team:

 

Just wanted to express my apologies for missing the last couple of Cypress calls.  We (CCHIT) remain committed to achieving a common, shared interoperability testing platform.

 

Last few weeks have been extremely hectic:  our 2008 Certification program just launched, and we’re starting up the 2009 criteria development cycle.  These events create a large number of interrupts and demands for my time.

 

As things get back to a more normal load -- hopefully soon -- I should be able to resume participating in Cypress calls and meetings.

 

thanks,

Dennis

 



Moore, Steve

unread,
Aug 12, 2008, 3:57:52 PM8/12/08
to cypres...@googlegroups.com, ihe-gazell...@googlegroups.com

Rob,

 

I agree with your assessment. The normal cycle for Gazelle would have had a phone call tomorrow. I’m not prepared for that, but hope to get re-organized and have a call on Aug 27 (pending availability of others).

 

Steve

Reply all
Reply to author
Forward
0 new messages