ROBO FREAKS UNITE!
We are undertaking an IEEE NSIT sponsored project to build an all
terrain vehicle with the following features -
· Autonomous control
· High Quality A/V transmission capability
· Object detection and avoidance
· GPS system included
We require a team of 4-5 students (2nd yr onwards) for the design and
fabrication of the robot. (Applicants must have experience in computer
based modeling and testing ??????)
Those interested may contact-
Divyabh (EC 3rd yr) 9818252388
Karan (EC 3rd yr) 9810546055
Arjun (EC 3rd yr) 9310568553
Ankit (IT 2nd yr) 9818855697
Jaideep (EC 3rd yr) 9818966829
Meetings(interviews?????) will be held on Tuesday and Thursday at 5:30
PM.
***********************************************************
ROBOT ENTHUSIASTS UNITE!
We are undertaking an IEEE NSIT sponsored project to build an all
terrain vehicle with the following features -
· Autonomous control
· Onboard Real time A/V link
· Object detection and avoidance
· GPS system included
We require a team of 6 students to engineer the mechanical
fabrication of the robot. This would include design fabrication and
testing of the vehicle.
All interested must attend the meeting on Tuesday or Thursday at 5:30
PM, at the entrance of the Electronics Block. All interested must
submit (in person) a written document outlining their past experience.
People with suitable practical experience would be preferred.
Those interested may contact-
Divyabh (EC 3rd yr) 9818252388
Karan (EC 3rd yr) 9810546055
Arjun (EC 3rd yr) 9310568553
Jaideep (EC 3rd yr) 9818966829
*************************************************************
>
>
> >
>
We require a team of 6 students for the mechanical fabrication of the
robot. This would include design, fabrication and testing of the
vehicle.
All interested must attend the meeting on Tuesday or Thursday at 5:30
PM, at the entrance of the Electronics Block, and submit a document
detailing their past experience.People with suitable practical
Karan Jain was concerned that we should also invite people from other
branches as we would require them also (COE etc)
I agree, but it would lead to a lot of confusion,
so lets just concentrate on mech ppl first,
then we'll subsequently take out more notices as and when we are more
clear about concrete tasks needed to be carried out regarding the
project