Hi All,
I was trying a business case for calculating costs of Manufacturing Product (BOM) where product parts are assembled and labor cost to be applied on 10 % of the total costs.
I have attempted to calculate labor cost on basis of percentage but it seems like only Material type of Cost Elements are only considered for costing.
Anyone has tried it before ?
Thanks in advance!
Ankit Bhavsar