You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to hyperopt-discuss
Would it be possible to implement a feature to stop the run if the metric hasn't improved by at least x decimal points in y runs? (For example: if AUC has been 43.0001 for the last ten runs and x=0.0001 and y = 10 then break).
Stephen
Imran Qureshi
unread,
Jan 25, 2020, 1:26:43 AM1/25/20
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message