FW: Te Awa Kairangi - Hutt River Trail Update

2 views
Skip to first unread message

Gene Clendon

unread,
Oct 16, 2025, 11:26:45 PM10/16/25
to Hutt Cycle Network

Hi folks!

FYI about Hutt River trail changes happening over this weekend (today & Monday!).

Thanks,

Gene

 

From: Info at Te Awa Kairangi <In...@teawakairangi.co.nz>
Sent: Friday, 17 October 2025 3:56 pm
Subject: Te Awa Kairangi - Hutt River Trail Update

 

Kia ora koutou,

 

We recently emailed you with regards to the closure of the Hutt River Trail on the western side of the river 800m south of Kennedy Good Bridge to 500m south of Melling Link Bridge.

 

We can confirm that the new temporary shared path on the eastern (city) side of the river between Kennedy Good Bridge and Melling Link Bridge will be open from later this afternoon (meaning paths on both sides of the river will be open this weekend). The new path is three metres wide, surfaced with compacted gravel, and will be set well back from Harcourt Werry Drive behind the streetlights, and closer to the riverbank in some areas due to existing vegetation.

 

The path on the western side of the river (800m south of Kennedy Good Bridge to 500m south of Melling Link Bridge) will be closed from Monday.

 

The riverbank reserve adjacent to Marsden St, south of Ewen Bridge and north of Kennedy Good Bridge remain fully open on both sides of the river.

 

Please follow the diversion routes as shown on the wayfinding maps (as per attached and installed along the paths), and note that these new routes will be slightly less direct for some users, so please allow extra time for your journey.  

 

You can stay up to date with the Hutt River Trail and other programme activities via our website and Facebook page!

 

 

 

Te Wai Takamori o Te Awa Kairangi Alliance

0800 456 465   E in...@teawakairangi.co.nz

 

 

 

image001.jpg
image002.jpg
TempRiverbankPathClosureSign_MLBNorth.pdf
Riverbank Path Closure_MLBSouth.pdf

Elaine Richardson

unread,
Oct 16, 2025, 11:38:08 PM10/16/25
to hutt-cycl...@googlegroups.com
Thanks Gene

Now the fun begins!! We cycled home from Melling station today a little before 3 pm and it was still open. Possibly our last ride along there😢

Cheers
Elaine

--
You received this message because you are subscribed to the Google Groups "Hutt Cycle Network" group.
To unsubscribe from this group and stop receiving emails from it, send an email to hutt-cycle-netw...@googlegroups.com.
To view this discussion, visit https://groups.google.com/d/msgid/hutt-cycle-network/000001dc3f15%24c96959a0%245c3c0ce0%24%40clendon.org.
Reply all
Reply to author
Forward
0 new messages