Hey lab,
Eric Wood ran us an HYH
We had 8 members, 7 cardholders
Discussion:
AC, The Air Conditioning has had problems since installation. It does seem to be leaking refrigerant. Nate Caine continues the saga of meeting with various contractors to address the problem.
We still have Sheets of plywood stored in the biolab. Lab projects to use this material should be proposed.
Proposals:
BobRoss printer needs a new transfer kit for $420 or less
This passed by unanimous vote; Y8, N0, A0
Station Reports:
3d printer station: Ultimaker is running, the extruder or hotend aren't doing so great and won’t last long. Speculation on options if at all for updating it which may not be worth it.
Welding: Eric W is doing a checkout process for someone soon. Plans to have some classes coming up.
One person recently had a crucible and torch at the welding table while indoors. Signage will be made to make it clear no hot work and open flames allowed while indoors.
Machine Shop; Darrell is on vacation, but the shop seems to be doing well and getting good use.
Laser station: No putting any material on top of warped wood to weigh it down. This is a recipe for problems which we do not need.
Electronics - Soldering irons are getting left on per Antonio.
Sewing Station: Husqvarna Viking Designer II embroidery, Cpro is going to make sure Michelle and Linda can use it.
Vinyl Station: Cpro will look into the USB not communicating with the Silhouette Cameo
Cleaning:Eric W - Bathroom
Eric O - Tables
Trash - Rick
Sweep - Antonio
Kitchen - Stephen