Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Assisted Nahem with kegerator system and tap tower installs • Weekly OAC meeting with Gen, Mike and Drew. • Drew to provide elevator radius revisions and glass spider clip selection. • Began applying roof top decking sealant. • Confirmed material list for outside shower gate frames. Keith Drew to place order. • Gen sourcing outside shower gate hardware. • Keith Drew delivering roof top planter box material. • Keith Drew confirmed circular stair stringer at elevator is under initial fabrication. Initial fabrication to be shipped to Keith’s shop from Oahu next week. • Supplied Liz at Griggs Systems with additional Rustic Matte Parklex order. Liz to provide quote tomorrow. • Worked with HES. • Worked with EDesign. • EDesign one man crew on site. • Ramos Pools onsite. • Woodys Plumbing on-site back again tomorrow. • Continued fabrication of the concrete treads for spiral stairs to roof. • Began completion of final install steps for the 3 glass vase puck lights. • Hilltop on site to open up tile at shower head pipes back tomorrow to complete. • Elegant painting on-site. Quote of the day: “There is nothing more artistic than to love others”
|
|||||||||||||||||