Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Aloha Friday!! • Hilltop continuing prepping lanai to pool coping for tile tie ins. • Hilltop on site tomorrow Sat. to waterproof lanai tie in. • EDesign not on-site. • Began monkey pod interior stair tread install. • Ramos pools onsite. • Epoxy floor crew on-site continuing on large garage floor prep. • Completed large garage shuffle to small garage. • Completed roof top decking and fascia installs. • Began prepping roof top decking at furniture areas. • Continued roof top decking finishing. • Began job site office move. • Continued install of toilet paper shelf’s. • Leo’s concrete to placed concrete at 4 exterior slabs. • Site meeting with Woodys to review water filtration install and remaining scope. • Woodys scheduled to return Monday 4/27. • Site meeting with Elegant painting to review remaining interior finish completions, and non Fleetwood doors. • Elegant painting to return Wed. 4/22. • Project meeting with Artie, Sturdevant to return Tuesday 4/21. • Site meeting with Marc Taron WCA members, Mike B. and Tiger. • Tile meeting with Dimitri and Mike B. • Nahem on site. Quote of the day: “If Friday had a face, I’d kiss it.”
|
|||||||||||||||||