Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Continued installing bathroom finish hardware at main level. • Access Lifts onsite beginning elevator install. • Keith Drew on-site working on interior stair treads. • Installed elevator door headers. • Elegant painting on-site sealing mahogany doors throughout. • Completed setting medicine cabinets at master bath. • Hilltop on-site working on stucco and main lanai tile set. • HES on-site setting finish devices. • Recieved IEs cost for Mauka closet side panels and toilet paper shelf’s. • EDesign not on site. • Woodys Plumbing not on site. • Staged Signature Shade Solutions delivery. • CMAC on-site beginning final install of site drainage, site grade, and bio detention basins. • CMAC encountering major blue rock at rear detention basin excavation. • Weekly project meeting with Gen. • Contacted Surface Solutions regarding epoxy coatings at concrete slab areas. • Recieved notice from Nick Corbat the Monkey Pod material is out of the Kiln. • Requested and received invoice for the interior Monkey Pod stair material from Nick. • Laid out holes to be drilled at beer tap countertop. • Completed urinal control install and testing. Quote of the day: “You must learn to let go. Release the stress. You were never in control anyway”
|
|||||||||||||||||