|
Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• CMAC on-site continuing on back drainage culvert project. • Woodys plumbing on-site setting tiki torch bases in concrete and hooking up gas line to roof top fire pit. • Tiki ditches ready for backfill. • Ramos pools continuing setting blue tile at spa interior. • HES on-site. • Mike B. and team continuing on outside shower gate frame prep, painting and assemblies. • Continued steel stair tread assembly attachment to concrete wall at back lanai stairs. • Began install of glass stand offs at monkey pod interior stair treads. • Retro fit window hardware at upper level awnings. • EDesign on site. Quote of the day: “Protect what you love, and love what you protect.”
|
|||||||||||||||||