Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Hilltop continuing prepping lanai to pool coping for tile tie ins. • EDesign finishing stair tread lighting wiring for Monkey Pod. • Reviewed and listed materials needed for monkey pod stair tread install, to begin tomorrow. • Ramos pools onsite. • Epoxy floor crew on-site finishing small garage floor, starting large garage floor prep. • Small garage floor to be covered tomorrow, and begin yet another shuffle to clear out big garage for epoxy scope. • Completed install of the Mauka closet side panels, and desk support. • Finishing up roof top decking and fascia installs. • Began back on roof to decking finishing. • Reserved flatbed truck for de mob Monday. • Began install of toilet paper shelf’s. • Leo’s Concrete crew on-site completing forms for concrete slabs at propane, heat pumps and pool waterfall columns. • Leo’s concrete to place concrete at said slabs tomorrow Friday. • Site meeting with Woodys to review water filtration install and remaining scope tomorrow Friday 8:00 AM. • Site meeting tomorrow 10:00 AM with Elegant painting to review remaining interior finish completions, and non Fleetwood doors. • Site meeting tomorrow 1:00 PM with Marc Taron and WCA members. • Unclogged Fleetwood slider door pan drain line for master shower door. • Maui Plumbing Fire on site installing the interior finish sprinkler heads. Quote of the day: “Be Aloha”
|
|||||||||||||||||