Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Aloha Friday!!! • Dropped off two interior mahogany wood doors to be repaired at Island Wood Door. • Picked up Blanco replacement sink for pass through, and Blanco soap dispenser from Fergusion plumbing supply. • Spoke to Artie about installing mini split unit at rack room. • Continued palletizing tools, equipment, material for off haul. • Ramos pools on site continuing on install of pool equipment at bunker room. • Mario and Bill onsite to review wet suit shower bench details with Keith. • Keith Drew on-site setting railing cables at upper roof. • Hilltop on-site wrapping up install of elevator tower tile. • Continued fabrication of concrete treads at spiral to roof. • Ford onsite. • EDesign not on-site. • HES not on site. • Confirmed HES will be on-site up coming MTW. • Continued bleaching/prepping roof top decking for sealer. • Met with wall paper hanger Randell to review powder bath installs. • Met with Nahem to review kegerator/tap installs. Nahem to start Monday AM. • Performed clean up. Quote of the day: “Youth is a gift of nature, but age is a work of art”
|
|||||||||||||||||