Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• HES Elect. on-site installing fixtures and devices. • HES PV onsite installing hangers at electrical room for PV batteries. • Elegant painting onsite continuing on interior finish and painting. • Keith Drew not on site. • CMAC completing drainage pipe installs at back basin. • Set front driveway grade elevations for CMAC. • CMAC began setting front driveway elevations. • Hilltop on site continuing on master bath wall tile set. • Hilltop onsite tomorrow. • Site meeting with Dimitri. • EDesign not on site. • Woodys not on site. • Kamalu continued install of garage ceiling lights. • Attended telahandler site training, site training to continue tomorrow 10:00 AM to 12:00. • Next Level on-site setting back splashes at custom sinks. Quote of the day: “ Progress favors those who keep walking, even when the path grows quiet”
|
|||||||||||||||||