Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC: • OC and OAC meeting. • Sent Drew pool window information. • Received roof top planter box take off from Drew. • Started sub top installs at BBQ. • Keith Drew on site continuing on spiral stair case to roof. • Insulation complete at Observatory, and complete at rack room. • Site meeting with Josh. • EDesign on-site. • Hilltop on-site. • Next Level on-site working on countertop scope. • HES elect on site. • Caught up on install of the soap dispensers. • Received confirmation Tile Techs roof top decking has been shipped today. • Completed install of pass through outside counter supports and sub top. • Continued first phase of milling Monkey Pod treads for interior stairs. Quote of the day: “A work of art is never finished, only abandoned”
|
|||||||||||||||||