|
Jon Lowe, Super / Project Manager at Castaway Construction & Restoration LLC:
• Darren dropping off drain covers for custom sinks. • Continued prepping of automated window equipment install at great room. • Ordered specialized tool to perform automated window equipment installs. • HES Elect. on-site installing fixtures and devices. • HES PV onsite. • Received confirmation Maui County PV permit was re issued. • Elegant painting onsite continuing on interior finish and painting. • Keith Drew on site prepping interior stair steel for finish painting. • OC and OAC meeting. • Completed framing and drywall at upper landing surround for interior stairs. • CMAC completing drainage pipe installs at back basin. • Hilltop not on site. • EDesign not on site. • Woodys not on site. • Continued final adjustments of the Fleetwood doors and windows. • Continued wiring of kitchen hood. • Worked with Kamalu laying out and installing AC electrical for roof top condensers. • Received final confirmation from Jon Harper and Artie for Kona supplied air vent at upper cab. • Josh Edesign delivering garage light fixtures. • Kamalu began install of garage ceiling lights. • Confirmed with Woodys Maui County plumbing inspection for the observatory was previously approved. • Scheduling observatory and rack room insulation and drywall install. • Confirmed telahandler site training and recertification training is on schedule for tomorrow Friday, 12:30 to 4:30. Quote of the day: “Joy doesn't need perfection-just people willing to show up for each other”
|
|||||||||||||||||